Gordon Power Station

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:Use Australian English Template:Use dmy dates Script error: No such module "Type in location".Script error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".Expression error: Unexpected < operator.

The Gordon Power Station is the largest conventional hydroelectric power station in Tasmania, Australia; located in the South West region of the state. The power station is situated on Gordon River. Water from Lake Gordon descends Script error: No such module "convert". underground past the Gordon Dam and into the power station.

The power station was opened in 1978.[1] In 2024, the station underwent a refurbishment.[1]

Technical data

The Gordon Power Station system comprises three Script error: No such module "convert". Francis-type turbines that have a combined generating capacity of Script error: No such module "convert". of electricity,[2] covering about 13% of the electricity demand of Tasmania.[3] The first two turbines were commissioned in 1978, before the third was commissioned a decade later in 1988.[4][5]

The power station is fuelled by water from Lake Gordon. Water from Lake Pedder is also drawn into Lake Gordon through the McPartlans Pass Canal.

The station output is fed from each machine by 18 kV aluminium busbars to the surface switchyard then passes through three 18/220 kV power transformers and 220 kV outdoor switchgear to TasNetworks' transmission grid. The switchyard also houses 22 kV apparatus used for power supply to the station and to the local community.[2] The annual output is estimated to be Script error: No such module "convert"..[6]

2016 Tasmanian energy crisis

Script error: No such module "Labelled list hatnote".

Due to drought, the Basslink power feed failure and Tasmanian energy needs, in early 2016, the water levels in Lake Gordon were at the lowest ever recorded (55 meters below capacity).[7] By January 2017 they had recovered 17 meters to 28 meters below capacity. Four years later, in June 2021, the water level had increased only 3 meters to -25 meters. Between June 2021 and June 2023, the water level decreased 4 metres to 29 meters below capacity.[8]

Gallery

References

<templatestyles src="Reflist/styles.css" />

  1. a b Script error: No such module "citation/CS1".
  2. a b Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. The Hydro after 100 Years EHA Magazine March 2015 page 19
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Template:EnergyTasmania Template:GordonPowerDevelopment Template:SouthWestTasmania Template:Western Tasmania