GWR diesel shunters

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Use dmy dates Template:Use British English Template:Refimprove The Great Western Railway purchased two diesel shunters, and ordered a further seven immediately prior to Nationalisation, which were delivered to British Rail in 1948–49. The two shunters used by the GWR were numbered 1 and 2, while a series commencing at 501 was planned for the new locomotives ordered in the 1940s. British Rail renumbered both its inherited and new locomotives in a series commencing from 15100.

1

This locomotive was built by Fowler in 1933 and was used at Swindon Works. It was an 0-4-0 diesel mechanical shunter with a Script error: No such module "convert". engine, Script error: No such module "convert". diameter wheels and a wheelbase of Script error: No such module "convert".. It was very similar to the London, Midland and Scottish Railway's (LMS) departmental locomotive number 2, which was built a couple of years later. It was withdrawn in 1940 and sold to the Ministry of Supply.Template:SfnTemplate:Sfn

2 / 15100

Script error: No such module "Labelled list hatnote". This locomotive was built by Hawthorn Leslie in 1936 and allocated to Swindon. It was a 0-6-0 diesel electric shunter, very similar to the LMS 7069 class (later British Rail Class D3/6), and with a close family resemblance to the Southern Railway Maunsell 350 hp DMS (SR 1 - SR3). It was renumbered 15100 by British Rail in 1948, withdrawn in 1965 and scrapped in early 1966.Template:Sfn

501 / 15107

Script error: No such module "Labelled list hatnote".

Brush/Petter 360 bhpTemplate:Sfn

502-507 / 15101-15106

Script error: No such module "Labelled list hatnote".

English Electric 350 bhpTemplate:Sfn

See also

References

<templatestyles src="Reflist/styles.css" />

Script error: No such module "Check for unknown parameters".

Script error: No such module "Navbox". Template:Great Western Railway