Fukuen Line
Template:Short description Script error: No such module "Unsubst". Template:Use dmy dates Script error: No such module "infobox".Script error: No such module "Check for unknown parameters". The Script error: No such module "Nihongo". is a railway line in Hiroshima Prefecture, Japan, operated by the West Japan Railway Company (JR West). It connects Fukuyama Station in Fukuyama to Miyoshi Station in Miyoshi.
Stations
| Line | Name | Distance (km) | Transfers | Location | ||
|---|---|---|---|---|---|---|
| Fukuen Line | Template:STN | 福山 | 0.0 | File:Shinkansen jrw.svg Sanyō Shinkansen File:JRW oka-W.svg File:JRW oka-X.svg Sanyō Main Line |
Fukuyama | Hiroshima |
| Template:STN | 備後本庄 | 1.8 | ||||
| Template:STN | 横尾 | 6.1 | ||||
| Template:STN | 神辺 | 8.4 | Ibara Railway Ibara Line | |||
| Template:STN | 湯田村 | 10.4 | ||||
| Template:STN | 道上 | 11.3 | ||||
| Template:STN | 万能倉 | 13.4 | ||||
| Template:STN | 駅家 | 14.6 | ||||
| Template:STN | 近田 | 16.0 | ||||
| Template:STN | 戸手 | 17.0 | ||||
| Template:STN | 上戸手 | 18.8 | ||||
| Template:STN | 新市 | 20.0 | ||||
| Template:STN | 高木 | 21.7 | Fuchū | |||
| Template:STN | 鵜飼 | 22.7 | ||||
| Template:STN | 府中 | 23.6 | ||||
| Template:STN | 下川辺 | 27.9 | ||||
| Template:STN | 中畑 | 31.8 | ||||
| Template:STN | 河佐 | 34.9 | ||||
| Template:STN | 備後三川 | 42.4 | Sera, Sera | |||
| Template:STN | 備後矢野 | 46.6 | Fuchū | |||
| Template:STN | 上下 | 50.3 | ||||
| Template:STN | 甲奴 | 54.7 | Miyoshi | |||
| Template:STN | 梶田 | 57.1 | ||||
| Template:STN | 備後安田 | 62.3 | ||||
| Template:STN | 吉舎 | 67.3 | ||||
| Template:STN | 三良坂 | 73.6 | ||||
| Template:STN | 塩町 | 78.0 | File:JRW hiro-P.svg Geibi Line | |||
| Geibi Line | ||||||
| Template:STN | 神杉 | 79.5 | ||||
| Template:STN | 八次 | 82.8 | ||||
| Template:STN | 三次 | 85.1 | File:JRW hiro-P.svg Geibi Line | |||
Former connecting lines
- File:JRW san-F.svg Sankō Line (closed 1 April 2018) – Miyoshi Station
Rolling stock
- 105 series 2-car EMUs (Fukuyama–Fuchū)
- KiHa 120-300 single-car DMUs (Fuchū–Miyoshi)
History
The Ryobi Light Railway opened a Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". gauge line to Fuchu in 1914, and electrified it at 750 V DC in 1927. The company was nationalised in 1933, the same year the Japanese Government Railway opened the Shiomachi to Kisa section of the line (then as an extension of the Geibi Line).Script error: No such module "Unsubst". The Fukuyama to Fuchu section was regauged to Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". in 1935, the year the Kisa to Joge section opened. The two sections were connected with the opening of the Fuchu to Joge section in 1938.Script error: No such module "Unsubst".
The Fuchu to Shimo-Kawabe section was electrified in 1954, and whilst the voltage on the Fukuyama to Fuchu section was increased to 1500 V DC in 1961, the Fuchu to Shimo-Kawabe electrification was decommissioned the following year.Script error: No such module "Unsubst".
Freight services ceased in 1986, and in 1989, the 6,123 m Hattabara Tunnel and associated deviation were commissioned, shortening the route by 1.4 km.Script error: No such module "Unsubst".
Wanman driver only operation commenced on the non-electrified section between Template:STN and Template:STN on 1 April 1991, using KiHa 120-300 DMUs.[1] Driver-only operation commenced on the electrified section between Template:STN and Template:STN on 14 March 1992, using 105 series EMUs.[1]
References
<templatestyles src="Reflist/styles.css" />
Script error: No such module "Check for unknown parameters".
Script error: No such module "Navbox". Template:Hiroshima transit