Fukuen Line

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "Unsubst". Template:Use dmy dates Script error: No such module "infobox".Script error: No such module "Check for unknown parameters". The Script error: No such module "Nihongo". is a railway line in Hiroshima Prefecture, Japan, operated by the West Japan Railway Company (JR West). It connects Fukuyama Station in Fukuyama to Miyoshi Station in Miyoshi.

Stations

Line Name Distance (km) Transfers Location
Fukuen Line Template:STN 福山 0.0 File:Shinkansen jrw.svg Sanyō Shinkansen
File:JRW oka-W.svg File:JRW oka-X.svg Sanyō Main Line
Fukuyama Hiroshima
Template:STN 備後本庄 1.8  
Template:STN 横尾 6.1  
Template:STN 神辺 8.4 Ibara Railway Ibara Line
Template:STN 湯田村 10.4  
Template:STN 道上 11.3  
Template:STN 万能倉 13.4  
Template:STN 駅家 14.6  
Template:STN 近田 16.0  
Template:STN 戸手 17.0  
Template:STN 上戸手 18.8  
Template:STN 新市 20.0  
Template:STN 高木 21.7   Fuchū
Template:STN 鵜飼 22.7  
Template:STN 府中 23.6
Template:STN 下川辺 27.9  
Template:STN 中畑 31.8  
Template:STN 河佐 34.9  
Template:STN 備後三川 42.4   Sera, Sera
Template:STN 備後矢野 46.6   Fuchū
Template:STN 上下 50.3  
Template:STN 甲奴 54.7   Miyoshi
Template:STN 梶田 57.1  
Template:STN 備後安田 62.3  
Template:STN 吉舎 67.3  
Template:STN 三良坂 73.6  
Template:STN 塩町 78.0 File:JRW hiro-P.svg Geibi Line
Geibi Line
Template:STN 神杉 79.5  
Template:STN 八次 82.8  
Template:STN 三次 85.1 File:JRW hiro-P.svg Geibi Line

Former connecting lines

Rolling stock

History

The Ryobi Light Railway opened a Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". gauge line to Fuchu in 1914, and electrified it at 750 V DC in 1927. The company was nationalised in 1933, the same year the Japanese Government Railway opened the Shiomachi to Kisa section of the line (then as an extension of the Geibi Line).Script error: No such module "Unsubst". The Fukuyama to Fuchu section was regauged to Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". in 1935, the year the Kisa to Joge section opened. The two sections were connected with the opening of the Fuchu to Joge section in 1938.Script error: No such module "Unsubst".

The Fuchu to Shimo-Kawabe section was electrified in 1954, and whilst the voltage on the Fukuyama to Fuchu section was increased to 1500 V DC in 1961, the Fuchu to Shimo-Kawabe electrification was decommissioned the following year.Script error: No such module "Unsubst".

Freight services ceased in 1986, and in 1989, the 6,123 m Hattabara Tunnel and associated deviation were commissioned, shortening the route by 1.4 km.Script error: No such module "Unsubst".

Wanman driver only operation commenced on the non-electrified section between Template:STN and Template:STN on 1 April 1991, using KiHa 120-300 DMUs.[1] Driver-only operation commenced on the electrified section between Template:STN and Template:STN on 14 March 1992, using 105 series EMUs.[1]

References

Template:Sister project

<templatestyles src="Reflist/styles.css" />

  1. a b Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

Script error: No such module "Navbox". Template:Hiroshima transit