Flinders line

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:Use dmy dates Template:Use Australian English Template:Infobox rail line

The Flinders line is a suburban commuter line in Adelaide, South Australia, that branches off the Seaford line at Mitchell Park, and ends opposite Science Park, close to the Flinders University and the Flinders Medical Centre. The line is single track for most of its length, from Celtic Avenue, near Mitchell Park station, to its terminus.

History

The railway was constructed between 1965 and 1966, as a branch line from Woodlands Park railway station on what was then the Willunga railway line, to serve the new Chrysler assembly plant at Clovelly Park. Construction of the plant had commenced in 1963, and the assembly line was opened in October 1964, remaining operational until it was closed in March 2008.[1] Upon opening, the Tonsley line served three stations: Mitchell Park, Clovelly Park, and the original Tonsley station.

Re-sleepering and electrification

From 27 February 2012, the line between Woodlands Park and Tonsley was closed for reconstruction.[2][3] During the closure, the line was duplicated between Tonsley Junction and Mitchell Park station, the track was re-sleepered with dual gauge sleepers to allow for the line to be converted to standard gauge at a future date, and the entire line electrified.[4] The closure, initially planned to last one year, was extended until September 2013, to allow the electrification of the line, along with the Noarlunga Centre line.[5] In late 2013, a plan was announced to convert the line to a double-track railway, to be funded through joint State and Federal initiatives, but the incoming Federal government announced it would be changing their focus to roads, and cut funding. Accordingly, with $18 million having been spent on the project, the future of the line was unclear.[6] It eventually reopened on 5 May 2014, more than two years after closure.[4]

Flinders extension

In July 2008, a feasibility study was commissioned by the government to extend the line to Flinders Medical Centre.[7] On 13 May 2016, as part of its 2016 federal election campaign, the Liberal pledged $43 million for the project. The State Labor Party committed $42 million towards the project, the estimated cost of which was $86 million.[8] The extension, referred to as the Flinders Link Project, would extend the line by Template:Convert and replace the Tonsley station terminus on Sturt Road with a new terminus station adjacent to Flinders Medical Centre. An elevated single track, with a pedestrian and bike path, was to begin just north of the original Tonsley station site, and cross Sturt Road, Laffer's Triangle and Main South Road, before terminating at Flinders station.[9] Clovelly Park station would be replaced by a relocated Tonsley station as part of the extension project.[10][11]

The original Tonsley station was closed after the final service on 28 June 2019, allowing construction of the rail overpass at the station site. Services terminated at Clovelly Park station until the extension was completed.[12] Built concurrently with the adjacent Darlington Upgrade for the Southern Expressway,[13][14] major works took place from July 2019 to October 2020.[15][16] The line was temporarily closed after the last service on 20 November 2020 for the extension to be commissioned, and fully reopened on 29 December. The operating hours of the line were expanded to include weekday nights and weekends. Before that, the line only ran between 6:30 am and 7:30 pm on weekdays, and was closed on weeknights and weekends.[17][18]

Line guide

colspan=7 style=background:#Template:Rail color|Flinders Line
Name Distance from
Adelaide
Year opened Serving suburbs Connections
Template:Rwsa 0.0 km 1856 Adelaide Template:Rail color box Template:Rail color box
Template:Rail color box Template:Rail color box

Template:Ric Bus Template:Ric Tram

Template:Rwsa 2.0 km 1898 Mile End
Template:Rwsa 4.0 km 2014 Keswick, Wayville
Template:Rwsa 5.0 km 1883 Forestville, Goodwood Template:Rail color box
Template:Rwsa 6.3 km 1913 Black Forest, Clarence Park
Template:Rwsa 7.1 km 1928 Black Forest, Clarence Park
Template:Rwsa 7.9 km 1913 Edwardstown
Template:Rwsa 9.1 km 1925 Ascot Park, Edwardstown Template:Rail color box

Template:Ric Bus

Template:Rwsa 11.5 km 1966 Clovelly Park, Mitchell Park
Template:Rwsa 12.4 km 2020 Mitchell Park, Tonsley
Template:Rwsa 13.7 km 2020 Bedford Park Template:Ric Bus

Former stations

Services

Trains to and from Adelaide operate every 20 minutes during weekday peak periods, every 30 minutes off-peak on weekdays, and on weekends into the late evening.[19][20] Before the extension to Flinders, services operated between 6.30 am and 7.30 pm on weekdays only.[21] Services were only extended to operate during weekday off-peak periods in 2004. Stations between Adelaide and Woodlands Park are also served by Seaford line trains, and stations between Adelaide and Goodwood are also served by Belair line trains. Prior to 2014, most trains were operated by 3000 class railcars, augmented at times by 2000 class railcars. Following the electrification of the line, the latter were no longer authorised to operate on the line[22] and they were retired from service in 2015. The line is now operated by 4000 class electric multiple units.

Gallery

References

Template:Reflist

External links

Template:Adelaide Metro railway stations Template:Adelaide public transport

  1. Script error: No such module "citation/CS1".
  2. Two Adelaide rail lines facing disruption Template:Webarchive ABC News 3 February 2012
  3. Script error: No such module "citation/CS1".
  4. a b Rail revitalisation Tonsley line Template:Webarchive Department of Planning, Transport & Infrastructure
  5. Rail Network Closures 2013 Adelaide Metro
  6. Marion Council lobbies for state and federal governments to put Tonsley rail upgrade ahead of politics Template:Webarchive Guardian Messenger 3 October 2013
  7. Government looks at extending Noarlunga, Tonsley rail lines Adelaide Advertiser 3 July 2008
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. Etheridge, Michelle. (28 February 2018). "New station on track", CoastCity Weekly, p5.
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. Script error: No such module "citation/CS1".
  19. Script error: No such module "citation/CS1".
  20. Script error: No such module "citation/CS1".
  21. Seaford & Tonsley timetable Template:Webarchive Adelaide Metro 20 July 2014
  22. "Limited life for 2000 class Jumbo railcars" Railway Digest January 2015 page 20