First Thai–Lao Friendship Bridge
Template:Short description Template:Use dmy dates Template:Main otherScript error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".Template:Main other
The First Thai–Lao Friendship BridgeTemplate:Efn is a bridge over the Mekong, connecting Nong Khai Province and the city of Nong Khai in Thailand with Vientiane Prefecture in Laos. The Lao capital city Vientiane is approximately Template:Convert from the bridge.
The bridge is 1,170 meters (0.73 mi) long. It has two Template:Convert-wide road lanes, two Template:Convert-wide footpaths and a single Template:RailGauge gauge railway line in the middle, straddling the narrow central reservation.
- The rail gauge is Template:RailGauge
- The loading gauge might be Template:Convert
- The structure gauge (roughly equal to a road lane) might be about Template:Convert Script error: No such module "Unsubst".
History
Opened on 8 April 1994, it was the first bridge across the lower Mekong, and the second on the full course of the Mekong.Script error: No such module "Unsubst".
The cost was about A$42 million, funded by the Government of Australia as development aid for Laos.[1][2]
The bridge was designed and built by Australian companies as a demonstration of their ability to complete major infrastructure projects in Southeast Asia. The concept design of a balanced cantilever bridge was proposed by Bruce Ramsay of VSL with the final design carried out by Maunsell consulting engineers.Template:CN It was built by John Holland.[3]
The official name of the bridge was changed, with the addition of "First" after the opening of the Second Thai–Lao Friendship Bridge further south at Savannakhet in January 2007.
Road traffic
Traffic on the bridge drives on the left, as in Thailand. Traffic in Laos drives on the right. The changeover at the Lao end, just before the border post, is controlled by traffic lights.
A shuttle bus service operates across the bridge, between the Lao and Thai border posts.
Bicycles and tricycles can travel on either the road or the footpath, while pedestrians can walk directly on the footpath.
The bridge is part of AH12 of the Asian Highway Network.
Railway
A meter gauge rail track from Nong Khai station runs along the central reservation of the bridge. Road traffic is stopped when a train is crossing.
In March 2004, an agreement between the Thai and Lao governments was signed to extend the railway to Thanaleng Railway Station in Laos, about Template:Convert from the bridge. This was the first modern railway link to Laos, as a short portage line once existed. The Thai government agreed to finance the line through a combination of grant and loan.[4] Construction began in January 2007.[5] Test trains began running in July 2008.[4] The formal inauguration occurred on 5 March 2009.[6]
In February 2006, approval of funding for the rail line from Thanaleng Railway Station to Vientiane, was announced by the French Development Agency.[7]
A US$50 million loan was reportedly received from the Thai government for the extension. Construction was originally slated to begin in December 2010. Lao railway officials confirmed as late as September 2010 that plans would go ahead. The extension, which would have taken an estimated three years to complete, would have stretched Template:Convert from Thanaleng to a new main Khamsavath Station.[8] The station will be completed by June 2022, and open 2023.
Since February 2010, the Eastern and Oriental Express crosses the Mekong via the bridge into Laos.[9] There is currently no connection to the China-Laos Railway. The standard gauge line circles the north east of Vientiane, to a depot just 2 km from the Friendship Bridge. A new bridge is proposed from this point, to join the proposed Thai High speed line at Nong Khai station just south of the Mekong.[10]
See also
- List of crossings of the Mekong River
- List of international bridges
- Second Thai–Lao Friendship Bridge
- Third Thai–Lao Friendship Bridge
- Fourth Thai–Lao Friendship Bridge
- Fifth Thai–Lao Friendship Bridge
- Transport in Laos
- Transport in Thailand
- Laos–Thailand relations
- Kunming–Singapore railway
Notes
References
External links
- Eastern and Oriental Express
- Video: journey, Nong Khai to Thanaleng
- Video: RHN Hitachi Railcars, built in 1967
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".Template:Dead link
- ↑ Saeung, Sopaporn (23 February 2006). "France okays Thai-Laos railway link" Template:Webarchive, The Nation.
- ↑ Laos and Thailand set to begin building railway extension into Vientiane
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- Pages with script errors
- Pages with broken file links
- Bridges over the Mekong River
- International bridges in Thailand
- Laos–Thailand border crossings
- Bridges in Thailand
- Bridges in Laos
- Road-rail bridges
- International railway lines
- Rail transport in Laos
- Railway bridges in Thailand
- Buildings and structures in Nong Khai province
- Buildings and structures in Vientiane
- Bridges completed in 1994
- Greater Mekong Subregion
- Transport in Vientiane