Fangshan line

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "infobox".Script error: No such module "Check for unknown parameters". The Fangshan Line of the Beijing Subway (Template:Zh) is a rapid transit line in western Beijing that runs from Template:Stl in Fangshan District north and east to Template:Stl in Fengtai District. The line is Script error: No such module "convert".. It is mainly elevated, including 10 elevated stations and 6 underground stations.[1] It allows residents of Beijing's western suburbs to connect to the rest of the Beijing Subway network. Fangshan line's color is orange.

It was opened on December 30, 2010. An expansion of the line came on December 30, 2017, with the opening of the one-station western extension to Template:Stl. The line was extended further north from Guogongzhuang station to the southwest corner of the Third Ring Road. The extension is Script error: No such module "convert". in length and it is fully underground.[2][3] The northern extension opened on December 31, 2020.[4]

Route

File:Daotian Station, 2014-03-21 09.JPG
Daotian station on the Fangshan Line.
File:Guangyangcheng station tracks.jpg
Tracks north of Guangyangcheng station

The Fangshan line starts at Template:Stl, just west of the East Yancun Bridge, where it interchanges with the Yanfang line. Previously, it started at Template:Stl which is located at the intersection of Changhong West Road and Suzhuang Street in the Liangxiang area of Fangshan District. The line makes four stops in Liangxiang including at the Fangshan Campus of the Beijing Institute of Technology. The line then heads north to the towns of Guangyang and Changyang. After crossing the Yongding River, the Fangshan Line enters Fengtai District where the line makes two more stops, at Dabaotai near the Beijing World Park, and at Guogongzhuang, also the southern terminus of Line 9. The line then makes four stops further northeast connecting with Line 10 at Template:Stl and connecting with Line 16 at Template:Stl.

Stations

List of stations from northeast to southwest:

Station Name Connections Nearby Bus Stops Distance
kmScript error: No such module "Check for unknown parameters".[5]
Location
EnglishScript error: No such module "Check for unknown parameters". ChineseScript error: No such module "Check for unknown parameters".
Template:Stl Script error: No such module "Lang". Template:Rint 49 67 483 631 678 692 845 912 夜7 夜30Script error: No such module "Check for unknown parameters". 0.000 0.000 Fengtai
Template:Stl Script error: No such module "Lang". Template:Rint 67 351 692 912 通医专线7 专180Script error: No such module "Check for unknown parameters". 1.138 1.138
Template:Stl Script error: No such module "Lang". 90 353 354 400 400快 602 685 通医专线7 专209Script error: No such module "Check for unknown parameters". 1.793 2.931
Template:Stl Script error: No such module "Lang". 497 627 845 快速直达专线160 专180 专190Script error: No such module "Check for unknown parameters". 1.671 4.602
Template:Stl Script error: No such module "Lang". Template:Rint (through service during weekday peak) 470 497 627 692 969 快速直达专线107 专125 专180Script error: No such module "Check for unknown parameters". 1.386 5.988
Template:Stl Script error: No such module "Lang". 480 840 912 967Script error: No such module "Check for unknown parameters". 1.438 7.426
Template:Stl Script error: No such module "Lang". 391 832 F53 F75Script error: No such module "Check for unknown parameters". 6.466 13.892 Fangshan
Template:Stl Script error: No such module "Lang". 646 832 912 993 F51 F75 F76 F83 F85 快速直达专线120 快速直达专线151 专93 专94Script error: No such module "Check for unknown parameters". 4.042 17.934
Template:Stl Script error: No such module "Lang". 646 912 951 993 F33 F34 F35 F51 F74 F76 F83 F92 快速直达专线24 快速直达专线120 快速直达专线151 快速直达专线187Script error: No such module "Check for unknown parameters". 2.150 20.084
Template:Stl Script error: No such module "Lang". 832 F28 F34 F35 F51 F85 快速直达专线187Script error: No such module "Check for unknown parameters". 1.474 21.558
Template:Stl Script error: No such module "Lang". 832 F1 F12 F46Script error: No such module "Check for unknown parameters". 2.003 23.561
Template:Stl Script error: No such module "Lang". 832 934 953 F1 F34Script error: No such module "Check for unknown parameters". 1.188 24.749
Template:Stl Script error: No such module "Lang". 895 F1 F34 F86区Script error: No such module "Check for unknown parameters". 1.739 26.488
Template:Stl Script error: No such module "Lang". 833 895 896 903 F1 F27 F33 F34 F39 F43 F46 F48 F49 F68 F74 F76 F78 F85 F86 快速直达专线177Script error: No such module "Check for unknown parameters". 1.333 27.821
Template:Stl Script error: No such module "Lang". 833 903 934 971 993 F1 F28 F35 F46 F61 F68 F69 F70 F76 F81 F83 F85 快速直达专线177Script error: No such module "Check for unknown parameters". 1.331 29.152
Template:Stl Script error: No such module "Lang". Template:Rint F43 F48 F49 F50 F57 F69 F78Script error: No such module "Check for unknown parameters". 2.305 31.457

Through service

File:FS024 leaving Libafang (20230509080955).jpg
A northbound through train leaving Libafang station with terminus displayed as National Library.
File:Southbound platform screen doors at Fengtai Kejiyuan Station (20220330183009).jpg
Route directory for through service between Line 9 and the Fangshan line.
File:Southbound route directory at L9 Baishiqiaonan Station (20220201202843).jpg
Route directory for through service between Line 9 and the Fangshan line.

In 2021, it was announced that there will be some through service between Line 9 and the Fangshan line. The operator is retrofitting the signal systems of both lines to achieve this.[6][7] Through service started on 18 January 2023.[8]

Future Development

Phase 3

The Phase 3 of the line will add 10.9 km, with 8 stations.[9] The extension start from Template:Stl station on the Phase 2 of the Fangshan line and end at Template:Stl station (interchange to Line 4). New interchange stations on this project includes Template:Stl station (interchange to Line 14, 16, Daxing Airport Express), Template:Stl station (interchange to Line 1) and Template:Stl station (interchange to Line 4).[9] According to the information released in July 2022, the extension is included in the "Beijing Rail Transit Phase III Construction Plan".[9]

History

Construction of the Fangshan Line was originally set to begin in 2012[10] but was moved up to April 1, 2009, to use stimulus funding provided by the government to counter the 2008 financial crisis.[11] The names of Phase 1 stations was announced on March 25, 2010, as a 7-day publicity.[12]

On December 30, 2010, the line began operating from Suzhuang to Dabaotai, but was not connected to any other line of the subway system. One year later, on December 31, 2011, the Dabaotai to Template:Stl section opened, linking the Fangshan Line with Line 9 and the rest of the subway network.

On December 30, 2017, the line was extended one stop westward to Yancun Dong (E).

On December 31, 2020, the line was extended north by 4 stations.[4]

Segment Commencement Length Station(s) Name
Dabaotai — Suzhuang 30 December 2010 Script error: No such module "convert".[13] 10 Phase 1
Guogongzhuang — Dabaotai 31 December 2011 1
Suzhuang — Yancundong 30 December 2017 Script error: No such module "convert".[14] 1 Western extension
Guogongzhuang — Dongguantounan 31 December 2020 Script error: No such module "convert".[4] 4 Northern extension

Rolling Stock

Model Image Manufacturer Year Built Amount in Service Fleet Numbers Depot
BD24 File:FS003 leaving Suzhuang.jpg Beijing Subway Rolling Stock Equipment 2009
2019–2020
44 FS 001–FS 044 Yancun

References

<templatestyles src="Reflist/styles.css" />

  1. 北京地铁房山线规划方案公布 设车站11座 Mar. 24, 2010 (Chinese)
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. a b c Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. a b c Script error: No such module "citation/CS1".
  10. "北京轨道交通房山线提前至年内开工", 北京晨报 June 29, 2008 (Chinese)
  11. "地铁房山线11座站名确定" 京华时报 Template:Webarchive Jan. 7, 2009 (Chinese)
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

Template:Sister project Template:Beijing transit Template:Beijing Subway Station