Eurus Wind Farm

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Infobox power station

The Eurus Wind Farm is a wind farm located in Juchitán de Zaragoza, Oaxaca, Mexico. The largest wind farm in Latin America, the partnership between Cemex and Acciona Energia cost US$550 million to build. Its 167 wind turbines combine to generate 250.5 megawatts (MW), sufficient power to supply about half a million people. By contrast with traditional means of power, it may reduce annual carbon dioxide emissions by 600,000 metric tons.[1][2][3]

See also

<templatestyles src="Stack/styles.css"/>

Script error: No such module "Portal".

Script error: No such module "Check for unknown parameters".

References

  1. Acciona Completes Assembly of LatAm’s Largest Wind Farm Script error: No such module "webarchive". Latin American Herald Tribune.
  2. CEMEX announces completion of EURUS wind farm construction, 23 November 2009
  3. First Phase of 250-MW Eurus Wind Farm, 30 January 2009

Script error: No such module "Navbox".