Danbury Branch

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:Lead too short Template:Use mdy dates Template:Infobox rail line

The Danbury Branch is a 23.9-mile (38 km) long branch line of the Metro-North Railroad's New Haven Line in the U.S. state of Connecticut, running from downtown Norwalk north to Danbury. All trains along the branch make stops at the line's 8 stations, with many weekday Danbury trains continuing along the New Haven Line to and from Stamford and New York City, eliminating the need to transfer at South Norwalk. It opened in 1852 as the Danbury and Norwalk Railroad. Until the early 1970s, passenger service continued north from Danbury to Canaan, Connecticut, and Pittsfield, Massachusetts. Metro-North took over operation of the line from Conrail in 1983, and the modern-day branch is mostly single-tracked.

History

Script error: No such module "Labelled list hatnote".

File:GeorgetownCTRRStation1919.jpg
Original Georgetown station, circa 1919
File:SouthNorwalkSwitchTowerMuseum08122007.jpg
The SoNo Switch Tower Museum in Norwalk

The Danbury and Norwalk Railroad began operating its line from Norwalk north to Danbury on February 22, 1852. In July 1872 a branch from the mainline at Bethel northeast to Hawleyville opened. At Hawleyville, the branch connected to the Housatonic Railroad, continuing north into Massachusetts. Also at Hawleyville, connections with the Shepaug Railroad to Litchfield were possible.[1]

Starting on May 1, 1874, that connection was supplemented by the New York, Housatonic and Northern Railroad, running from Danbury northeast to the Housatonic. In 1881 the New York and New England Railroad was completed, giving another connection at Danbury and at Hawleyville. A short branch from Branchville on the mainline west to Ridgefield opened July 1, 1870. In July 1882 an extension was built in Norwalk to docks at Wilson Point. The Housatonic Railroad leased the D&N on July 21, 1887; and soon after, the New York, New Haven and Hartford Railroad leased the Housatonic.[1]

Long-distance passenger service operated on the line. The Berkshire ran on the line from Grand Central to Danbury, to Pittsfield, Massachusetts. Many railroad bridges along the Danbury Branch were damaged or destroyed in the 1955 Norwalk river flood.[2] The NYNH&H merged into Penn Central in 1969. On January 1, 1971, the State of Connecticut leased the Danbury Branch from Penn Central.[3] The last passenger train from Danbury north to Pittsfield, Massachusetts ran in April 1971, the day before Amtrak assumed passenger operations. From 1976 until 1983, freight and passenger service on the line was provided by the Consolidated Rail Corporation (Conrail) under a contract with Connecticut. In 1983 the newly formed Metro-North Commuter Railroad took over operation of passenger service along the line.[4]Script error: No such module "Unsubst". Conrail continued to provide freight service on the line until 1993. The Providence and Worcester Railroad now provides freight service along the Danbury Branch.

Upon renovation of the Merritt 7 station, Metro-North ceased stops at Template:Mnrr on January 16, 1994, and instead provided service via shuttle bus to Merritt 7 for local employers. By the time of its closing, fewer than 15 passengers used the station daily.[5]

Electrification

The Danbury Line operated electric-powered trains beginning in 1925. The catenary system on the Danbury Line was removed in 1961 when diesel-powered locomotives resumed service on the line.[6][7] Steel posts that once carried the overhead catenary system can still be seen along the line.[8] Template:As of, the Connecticut Department of Transportation was studying the feasibility of installing catenary wire on the Danbury Branch.[9]

Railway museums

The Switchtower Museum in South Norwalk describes to visitors how railroad employees would switch the tracks for trains continuing on the Danbury branch line, then switch them back for trains travelling along the New Haven main line.[10]

The Danbury Railway Museum is located in the former Union Station of the D&N and NY&NE in Danbury. It lies just north of the current Danbury Metro-North station. At the museum are examples of rolling stock retired from service as well as an indoor display of model trains.

Plans

File:Old Danbury Branch Solari.jpg
Former Solari display for the branch used at Grand Central Terminal; now at the Danbury Railway Museum.

There have been proposals to re-electrify the Danbury Branch, along with a plan to extend service north from Danbury to New Milford.[11]

In connection with the planned redevelopment of the Gilbert & Bennett Wire Mill as a residential neighborhood, reopening a Georgetown station between the Cannondale and Branchville stations has been approved, though not yet scheduled or funded.[12][13] The previous station was abandoned in the 1970s due to low ridership.

Over $60 million was allocated to the Danbury Branch, approximately half from the economic stimulus package of 2009, to improve current stations, build siding tracks, and install a new signal system. Connecticut Gov. M. Jodi Rell held a press conference with local politicians at the Cannondale station on July 28, 2009, to announce that construction was scheduled to start in late 2009 and finish in 2011.[14] The new signal system finally began operation in 2013, but extensive work was still ongoing in 2014 because of unresolved problems with the drop gates at grade crossings.[15][16]

In fall 2012, the focus of the plan was only on improving the corridor as far as Danbury, with no extension.[11]

In May 2015, Governor Dannel Malloy's five-year plan for transportation improvements called "Let's Go CT" only mentioned one point for the Danbury Branch.[17] This is a new small rail yard called the Danbury Line Dock Yard Improvements. This area in South Norwalk will include electrification of the southern end of the branch. This was to enable work to commence on the Walk Bridge.[18] However, at the same time a 30-year plan was published that does envision electrification of the Danbury Branch, extending service to New Milford and electrifying that extension. Electrification of the portion to Danbury would cost $400 million; the extension to New Milford would cost $450 million, and the electrification of the extension would cost $540 million.[19]

On February 1, 2017, the Connecticut State Bond Commission authorized $21 million in borrowing for upgrades at the Merritt 7 station as well as for the addition of a station on the New Haven Line. The Merritt 7 station would have a footbridge added, a raised platform, and an expanded shelter.[20]

Plans to reopen the long-closed Wall Street station are under consideration in wake of new housing developments in Norwalk Center.[21]

Stations

West of Template:Mnrr, the New Haven Line continues southwest to Grand Central Terminal and northeast to Union Station in New Haven.

All trains stop at all eight stations on the branch. The trip from Danbury to South Norwalk currently (2018) takes about 54 minutes. All peak trains and some off-peak run from Danbury to Template:Mnrr on weekdays, and limited service runs from Danbury to Grand Central Terminal as well. Limited through service from Danbury to Grand Central takes about 2 hours. Two weekday trains serve the intermediate stations (Template:Mnrr, Template:Mnrr, and Template:Mnrr) in peak direction.

The following services that connect to the Danbury Branch are Amtrak,[22] Metro-North Railroad,[23] Norwalk Transit District,[24] and HARTransit.[25]

Weekday service only
Closed stations

State Zone Location Station Miles (km)
from GCT
Date
opened
Date
closed
Connections / notes
NY 1 Manhattan Grand Central Terminal Template:MNR acc Template:Convert October 6, 1871[26] Template:Ric: Template:Rcb, Template:Rcb
Template:Ric (at Grand Central Madison)
Template:Rint NYC Subway: Template:NYCS Grand Central (at Grand Central–42nd Street)
Template:Bus icon NYCT Bus, MTA Bus
Template:Mnrr Template:MNR acc Template:Convert October 25, 1897[27] Template:Ric: Template:Rcb, Template:Rcb
Template:Rint NYC Subway: Template:NYCS time 2Template:NYCS brTemplate:NYCS time 2Template:NYCS brTemplate:NYCS time 2 (at 125th Street)
Template:Bus icon NYCT Bus
CT 16 Stamford Stamford
Transportation Center
Template:MNR acc
Template:Convert December 25, 1848Template:Sfn[28] Template:Ric: Template:Lnl, Template:Lnl, Template:Lnl
Template:Ric: Template:Rcb, Template:Rcb
Template:Ric: Template:Lnl (limited service)
Template:Bus icon CTtransit Stamford,[29] UConn Stamford Shuttle
Template:Rint Intercity bus: Greyhound, Peter Pan
Darien Template:Mnrr Template:MNR acc Template:Convert Template:Bus icon CTtransit Stamford[29]
Template:Mnrr Template:MNR acc Template:Convert December 25, 1848Template:Sfn[28] Template:Bus icon CTtransit Stamford[29]
Norwalk Template:Mnrr Template:MNR acc Template:Convert Template:Bus icon Norwalk Transit District[24]
17 Template:Mnrr Template:MNR acc Template:Convert Template:Ric: Template:Rcb
Template:Bus icon Norwalk Transit District[24]
41 Wall Street 1860 1956[30]
Template:Mnrr Template:MNR acc Template:Convert 1985[31] Template:Bus icon HARTransit, Norwalk Transit District
Wilton Template:Mnrr January 12, 1976 January 16, 1994
Template:Mnrr Template:MNR acc Template:Convert 1852 Template:Bus icon HARTransit
Template:Mnrr Template:MNR acc Template:Convert 1852 Template:Bus icon HARTransit
Template:Mnrr 1970s
42 Ridgefield Template:Mnrr Template:MNR acc Template:Convert 1852 Template:Bus icon HARTransit
Redding Sanford 1852 1938
Template:Mnrr Template:MNR acc Template:Convert 1852 Template:Bus icon HARTransit
Bethel Template:Mnrr Template:MNR acc Template:Convert 1852 Template:Bus icon HARTransit
Danbury Template:Mnrr Template:MNR acc Template:Convert 1852 Template:Bus icon HARTransit

Rolling stock

Unlike the New Haven main line or the New Canaan Branch, the Danbury Branch is not electrified, and uses diesel locomotives in push-pull operation. Usually, the diesels push trains toward Grand Central Terminal, and pull toward Danbury. All of the passenger cars used are Shoreliner series cars, powered by GE P32AC-DM Genesis, Brookville BL20GH, or EMD GP40-3H locomotives.

In August 2023, CTDOT approved a contract with Alstom for 60 single-level passenger cars. The cars will replace the existing Shoreliner coach fleet on the Waterbury Branch and the Danbury Branch, as well as Mafersa coaches on the Hartford Line. Deliveries are expected to begin in 2026.[32][33]

See also

References

Template:Reflist

Sources

  • Script error: No such module "citation/CS1".

External links

Template:Sister project Template:Attached KML

Script error: No such module "Navbox". Template:Connecticut transit

  1. a b Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Template:Cite report
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. a b Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. Script error: No such module "citation/CS1".
  19. Script error: No such module "citation/CS1".
  20. Script error: No such module "citation/CS1".
  21. Script error: No such module "citation/CS1".
  22. Script error: No such module "citation/CS1".
  23. Script error: No such module "citation/CS1".
  24. a b c Script error: No such module "citation/CS1".
  25. Script error: No such module "citation/CS1".
  26. Script error: No such module "citation/CS1".
  27. Script error: No such module "citation/CS1".
  28. a b Script error: No such module "citation/CS1". Template:Open access
  29. a b c Script error: No such module "citation/CS1".
  30. Script error: No such module "citation/CS1".
  31. Script error: No such module "citation/CS1".
  32. Script error: No such module "citation/CS1".
  33. Script error: No such module "citation/CS1".