Connaught Tunnel

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "For".

Script error: No such module "Infobox".Script error: No such module "Check for unknown parameters". Script error: No such module "Location map". The Connaught Tunnel is in southeastern British Columbia, on the Revelstoke–Donald segment. The Script error: No such module "convert". tunnel carries the Canadian Pacific Kansas City (CPKC) main line under Mount Macdonald in the Selkirk Mountains. The tunnel, opened by the Canadian Pacific Railway (CP) in 1916, replaced the previous routing over Rogers Pass.

History

Summit route deficiencies

Traffic restrictions imposed by a single track comprising Script error: No such module "convert". of 2.2 percent gradients,Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". emerging competition,Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". and snow-related costs,Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". were negative factors. The 1910 Rogers Pass avalanche, and other avalanches on the pass, influenced but did not unduly pressure CP to consider alternatives;Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". however, snow clearing and maintaining snow sheds was an ongoing burden.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Rarely assigning more than one pusher locomotive per train, trains over 1,016 tons had to be cut.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". Higher capacity locomotives had helped,Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". but the next leap forward would not occur until the Selkirk locomotives emerged in 1929.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". In 1912, the average of eight trains (peaking at 11) per day in each direction was forecast to double over the next four years. The program to double-track much of the route through the mountains could create a bottleneck at Rogers Pass. Following the 1906–1908 recession, by 1912, passenger and freight volumes surpassed records. Whereas passenger train length could increase, freight could not, because of weight capacity limits.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". Furthermore, the former had priority, causing siding waits for the latter.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

The opening of the Grand Trunk Pacific (GTP) posed a threat to CP's grain and Asian trade.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". Using a single locomotive, GTP could haul 2,041 tons from Edmonton to Prince Rupert, via Yellowhead Pass, four times the weight CP could haul across the mountains on its main line.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". The opening of the Canadian Northern Railway (CNoR) via the Yellowhead to Vancouver, the premier destination, prompted greater alarm.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". The opening of the Panama Canal, which bypassed all North American rail routes, offered some compensation in that grain traffic destined for Europe could travel westward by rail.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Prior significant improvements in the mountains

In 1902, the Script error: No such module "convert". Ottertail Diversion, west from Field, eliminated the need for pushers.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". In 1887, after a Script error: No such module "convert". tunnel collapsed near Palliser, the temporary realignment around a bluff of the Kicking Horse River existed until the Script error: No such module "convert". Palliser Tunnel (1906).Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". In 1909, the Spiral Tunnels replaced the Big Hill.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Alternatives

Routes

The three basic options within the Selkirks were to use the Big Bend, double-track the summit, or dig a tunnel. The Big Bend route was not a viable contender.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". Estimates indicated that a tunnel would be cheaper than snow sheds and operational costs for double-tracking the summit.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Tunnels

Three schemes were considered. In 1912, Thomas Kilpatrick, superintendent of the Mountain Subdivision, suggested a Script error: No such module "convert". tunnel, which would have shortened the line by Script error: No such module "convert"., reducing the pusher gradient by Script error: No such module "convert". on the east slope and Script error: No such module "convert". on the west one. This alignment would have eliminated the bridges at Mountain, Surprise, and Stoney creeks, but was rejected owing to perceived construction deadlines, and a route beneath the headwaters of the Illecillewaet River, vulnerable to leakage.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". The deadlineScript error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". and routeScript error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". fears proved suspect.

F.F. Busteed, general superintendent of the Pacific Division, proposed a Script error: No such module "convert". tunnel, which would have shortened the line by Script error: No such module "convert"., reducing the pusher gradient by Script error: No such module "convert". on the east slope and Script error: No such module "convert". on the west one.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". John G. Sullivan, chief engineer,[1] recommended a Script error: No such module "convert". tunnel, similar to, but more expensive than, the Busteed one.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". All proposals eliminated the Loops on the west slope of the pass route.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Proposal and tender

The stated advantages were three-fold. Primarily, the tunnel lowered the grade; secondly, it shortened the distance; and thirdly, it bypassed an avalanche-prone zone.[2]

The specified alignment would lower the track summit from Script error: No such module "convert". to Script error: No such module "convert"., shorten the line by Script error: No such module "convert"., reduce the pusher gradient by Script error: No such module "convert". on the east slope and Script error: No such module "convert". on the west one, and eliminate the Stoney, Surprise, and Mountain creek bridges. The tunnel grade would be 0.95% westward.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". At the west portal, the route required a diversion of the Illecillewaet River for about Script error: No such module "convert"..Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". Let out to tender in April 1913, the bids received were unacceptably high. It was immediately retendered as a cost-plus contract, with bonus and penalty clauses. After negotiations with the lowest bidder, the contract was awarded to Foley, Welch and Stewart (FW&S) in July 1913.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Construction

Template:Chart

The Rogers Pass article shows the summit route details. Only the crest and eastern slope of the tunnel route is underground.

The primary construction camp was near the western portal, a secondary one was near the eastern portal, and a minor one was at Bear Creek.[2] The western portal one, housing 300, was approached either from Loop Spur or the government road from Glacier House. The eastern portal one, housing 200, had only rail access. Both comprised a police post, small hospital, general store, offices, apartments, bunkhouses, kitchen, dining hall, and lounge, with electric lighting and plumbing for water and sanitation.

Operating three shifts daily, a pioneer tunnel advanced from each end, from which cross cuts were made to the main tunnel so work could carry on at a number of headings simultaneously. Compressed air equipment, blasting, steam shovels, and narrow-gauge cars were used. At Script error: No such module "convert". high and Script error: No such module "convert". wide, the tunnel would accommodate double tracks.[3] The western side involved penetrating thick mud, extremely hard rock, and finally softer rock.[4] The highest point of the Selkirks track was just inside the western portal. Three steam shovels were based on the west side and one on the east.[2] Death and injury were not uncommon.[5] Mirroring the advance across the pass in the 1880s, concern for the health and safety of workers was not a priority.[4] Beating world monthly tunneling records, the pioneer headings met in December 1915, and the main bores in July 1916.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

The unacceptably high cost projection scrapped the electrification plan. Instead, ventilation fans were installed.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". East of the tunnel, the plan for double-tracking to Six-Mile Creek was amended to a level Script error: No such module "convert". single track connecting with the existing line at Stoney Creek.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". This reduced the pusher gradient on the east slope by Script error: No such module "convert"., Script error: No such module "convert". less than specified.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". However, it retained the substantial investment in the bridges at Mountain, Surprise, and Stoney creeks.[6] The tunnel was completed 11 months ahead of schedule and below budget.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". One calculation of costs listed tunneling $4.91M, tunnel track $0.16M, approaches $0.86M, and ventilation $0.11M, totaling $6.04M,Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". less the salvage value of the abandoned line $1.67M.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". Extending the concrete lining during 1919–1925 added a further $2.60M.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". The $8.64M total is in line with a different calculation of $8.45M.[7] In all, the route was shortened by Script error: No such module "convert"..Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Repairs, modifications, and emergencies

File:Connaught Tunnel.jpg
Connaught Tunnel

In 1919, 30 drums of gasoline and kerosene, used by the concrete mixers engaged in the lining operation, ignited. A tunnel watchman, who rushed some distance to the nearest telephone to alert Connaught station at the eastern portal, did not survive. His warning saved the westbound transcontinental, then at the station, from proceeding into the tunnel. Nine workers escaped on a handcar from the east portal, and one watchman staggered from the west portal.[8]

To deal with crumbling rock in the roof, the concrete tunnel lining was extended from Script error: No such module "convert". to Script error: No such module "convert".. Prior to the 1925 completion of the project,Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". falling rock killed or injured several workers.[9]

In 1928, a locomotive boiler explosion killed three crew members near Glacier.[10]

In 1929, two train crew died when their locomotive fell into the ravine when a girder collapsed on the Surprise Creek Bridge.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

The 1931 flood sent 2,000 replacement ties through the tunnel and filled the west portal cutting to a Script error: No such module "convert". depth[11] with Script error: No such module "convert". of mud and debris, which took five days to dig out.[4]

Approved in 1958, the following year a single track down the center (replacing the double tracks) provided sufficient clearance for tri-deck automobile carriers.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

In 1972 and 1976, the tunnel fans and housing sustained extensive damage on catching fire.[6]

In 1977, soon after departing the Glacier siding (Mile 85.9), a westbound loaded 109-car coal train lost control, and broadcast a warning that they were travelling too fast to make the curves at Illecillewaet. On hearing the radio message, a 60-car eastbound freight accelerated to safely reach Illecillewaet siding (Mile 98.1), before three crew members stepped clear of their train. The runaway's three lead locomotives, 45 cars, a remote control locomotive, and the following 22 cars, were destroyed on derailing at Mile 94.4. The impact shifted a bridge from its footings and damaged a snow shed. The crew sustained minor injuries. The line remained closed for a week.[12]

In 1985, a nearby rock slide derailed one of the four locomotives hauling a coal train.[13]

The tunnel was deepened to clearances matched with the Mount Macdonald Tunnel in 1993 to accommodate double-stack container cars with future electrification.[6] This first 24/7 work project undertaken by CP was a significant engineering challenge.

In 1997, eight cars of a train derailed in the vicinity.[14]

In 2015, six cars of a westbound freight derailed on Stoney Creek Bridge. The train had diverted to the eastbound route because the Mount Macdonald Tunnel was being vented. The incident occurred when the train lost momentum on the steeper grade and stopped with the cars on the bridge. However, restarting on the curve caused the heavier cars at the front and rear of the train to lift the lighter middle cars from the track.[15]

Operation

The first commercial train was December 1916, which traveled via Loop Spur, since the pass line remained in use until a few days later.[16] The most northern part of the Loops between the two hillsides, which had been a long trestle,[17] but likely infilled around 1906, needed to be breached by the new line.

Automatic block signalling came in the 1920s.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". To improve visibility on the 1929 introduction of the Selkirk locomotives, trains switched to the left-hand track before entering the tunnel.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". In 1950, multiple aspect signalling was installed. In 1954, diesel locomotives became standard.Script error: No such module "Footnotes".Script error: No such module "Check for unknown parameters".

Pusher units cut into westbound freight trains at Beavermouth, before disconnecting at Stoney Creek. On occasions, when pushers worked through to Glacier, crew were required to wear respirators, owing to the tunnel fumes. The tunnel blocked radio communication. The 1974 realignment west of Beavermouth moved the connection point to Rogers. After the 1988 opening of the Mount Macdonald Tunnel, westbound traffic primarily used that lower gradient route, with Connaught handling eastbound.[12][18][19] During the pusher station's existence, six engineers, six maintenance workers, and nine locomotives were based at Rogers. Five-engine units were used on heavy trains carrying grain, coal, and potash. Four-engine units were used on other freights.[20]

Notability

When opened, the tunnel ranked eighth in length:

  1. Simplon Tunnel (1906) Script error: No such module "convert".
  2. Gotthard Tunnel (1882) Script error: No such module "convert".
  3. Lötschberg Tunnel (1913) Script error: No such module "convert".
  4. Fréjus Rail Tunnel (Mont Cenis) (1871) Script error: No such module "convert"., extended (1881) Script error: No such module "convert".
  5. Arlberg Railway Tunnel (1884) Script error: No such module "convert".
  6. Ricken Tunnel (1910) Script error: No such module "convert".
  7. Tauern Railway Tunnel (1909) Script error: No such module "convert".
  8. Connaught Tunnel (1916) Script error: No such module "convert".

However, it took the title from the Hoosac Tunnel (1875) Script error: No such module "convert". as the longest railway tunnel in North AmericaScript error: No such module "Footnotes".Script error: No such module "Check for unknown parameters". until displaced by the Moffat Tunnel (1928) Script error: No such module "convert". in 1928.

Officially opened in July 1916 by the Prince Arthur, Duke of Connaught, the governor general, the Selkirk Tunnel[21] was renamed the Connaught Tunnel weeks later.[22]

In 2001, the tunnel was inducted into the North America Railway Hall of Fame.[23]

When partway through the project, rock drillers J. A. McIlwee and Sons encountered an unexpected predominance of crumbly slate, FW&S dismissed the subcontractor, rather than negotiate a contract variance. After several appeals, including a hearing of the Judicial Committee of the Privy Council, the courts awarded McIlwee about $576,000 for breach of contract. At the time, this was the largest single judgement obtained in a BC court.[24]

W.J. Hackman (1928–1953)[25] was the first child born in the tunnel. The birth occurred on the westbound CP No. 2. Passenger train.[26] The next birth appears to have occurred in 1939.[27]

See also

Footnotes

<templatestyles src="Reflist/styles.css" />

  1. ↑ Script error: No such module "citation/CS1".
  2. ↑ a b c Script error: No such module "citation/CS1".
  3. ↑ Script error: No such module "citation/CS1".
  4. ↑ a b c Script error: No such module "citation/CS1".
  5. ↑ Script error: No such module "citation/CS1".
    Script error: No such module "citation/CS1".
    Script error: No such module "citation/CS1".
    Script error: No such module "citation/CS1".
    Script error: No such module "citation/CS1".
    Script error: No such module "citation/CS1".
  6. ↑ a b c Script error: No such module "citation/CS1".
  7. ↑ Script error: No such module "citation/CS1".
  8. ↑ Script error: No such module "citation/CS1".
  9. ↑ Script error: No such module "citation/CS1".
    Script error: No such module "citation/CS1".
    Script error: No such module "citation/CS1".
  10. ↑ Script error: No such module "citation/CS1".
  11. ↑ Script error: No such module "citation/CS1".
  12. ↑ a b Script error: No such module "citation/CS1".
  13. ↑ Script error: No such module "citation/CS1".
  14. ↑ Script error: No such module "citation/CS1".
  15. ↑ Script error: No such module "citation/CS1".
  16. ↑ Script error: No such module "citation/CS1".
  17. ↑ Script error: No such module "citation/CS1".
  18. ↑ Script error: No such module "citation/CS1".
  19. ↑ Script error: No such module "citation/CS1".
  20. ↑ Script error: No such module "citation/CS1".
  21. ↑ Script error: No such module "citation/CS1".
  22. ↑ Script error: No such module "citation/CS1".
  23. ↑ Script error: No such module "citation/CS1".
  24. ↑ Script error: No such module "citation/CS1".
    Script error: No such module "citation/CS1".
  25. ↑ Script error: No such module "citation/CS1".
  26. ↑ Script error: No such module "citation/CS1".
  27. ↑ Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

References

  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".