Bucharest Metro Line M5

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "infobox".Script error: No such module "Check for unknown parameters".

M5 is the newest of the five lines of the Bucharest Metro, opened on 15 September 2020. In the first phase (Script error: No such module "convert".), it runs from Eroilor to Râul Doamnei, and to Valea Ialomiței, in the Drumul Taberei neighbourhood.

File:Bucharest Metro stationed in Eroilor 2 Station.jpg
Valea Ialomitei bound Metro train stationed at Eroilor

History

In 2011, construction started on the first section of the M5.[1][2] The expected construction cost was €708.6 million.[3] Opened on 15 September 2020, the first section, Râul Doamnei to Eroilor is around Script error: No such module "convert". long with 10 stations.

After that, the line will be extended to Iancului, and from there under Iancului Road (Șoseaua Iancului) until it reaches the Pantelimon station of M1.

Rolling stock

Until 2023, when new Alstom Metropolis French trains for this line are meant to arrive, 8 Canadian Bombardier Movia 346 train sets are used, redistributed from M3.

Stations

Template:Rapid transit OSM map

File:Metro București.svg
Network Map
Phase Terminals Length Stations Constructor Construction since Opening
I Râul DoamneiEroilor 6.9 km 9 Astaldi-FCC-AB Construct-Delta ACM April 2011 15 September 2020
RomancierilorValea Ialomiței 1 Max Bögl
II EroilorUniversitate 5.4 km 3 - TBA 2025 (est.)
UniversitateIancului 3 -
III IanculuiPantelimon 3.8 km 6 - On hold 2032 (est.)

Sources: metrorex.ro,[4] adevarul.ro,[5] wall-street.ro[6]

References

<templatestyles src="Reflist/styles.css" />

  1. Metrorex Press release 15 March 2011 Template:In lang
  2. Metrorex Press release 15 April 2011 Template:In lang
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Mai puține stații în magistrala 5 de metrou tronsonul Universitate-Pantelimon Template:In lang
  6. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links


Template:Bucharest Metro navbox Template:Transport in Bucharest Template:Authority control


Template:Bucharest-metro-stub