Bankhead station
Template:Short description Template:Use American English Template:Use mdy dates Template:Infobox station
Bankhead is an elevated subway station in Atlanta, Georgia, the western terminus of the Green Line in the Metropolitan Atlanta Rapid Transit Authority (MARTA) rail system. Bankhead station is located in the Grove Park Neighborhood due to a recent neighborhood expansion. This station primarily serves the neighborhoods of Grove Park, Bankhead, West Lake, Howell Station, and other Westside residents. Bankhead Station provides connecting bus service to Donald Lee Hollowell Highway, Maddox Park, and the future Westside Park at Bellwood Quarry; which will be the largest park in the city of Atlanta
Unlike most MARTA stations, which are provisioned for eight rail cars, Bankhead can only accommodate two cars, with adequate space left in place to allow extension to four cars in the future. It is the only station served exclusively by the Green Line.
The area it serves is scheduled to be an important part of the Belt Line, near Maddox Park and the new Westside Park, which would be the largest park in the city of Atlanta.
Station layout
| P Platform level |
Westbound | ← Green Line alighting passengers only |
| Island platform, doors will open on the leftScript error: No such module "Check for unknown parameters". | ||
| Eastbound | Green Line toward Edgewood/Candler Park (weekends toward King Memorial, nights toward Vine City) (Ashby) → | |
| G | Street Level | Exit/Entrance, station house |
History
Bankhead Station was opened on December 12, 1992,[1] the same day as Doraville.[2] The Green Line is a stub of the originally planned Proctor Creek Line, which was planned to expand north of Bankhead to the Perry Homes community, now called West Highlands.
In addition, there is another stub in between the Edgewood/Candler Park and East Lake stations, which would have been called the Tucker-North Dekalb Line. This included plans for an additional 2 stations, one at Emory University and another in North Druid Hills.[3] The future Green Line would have most likely went between Bankhead and North Druid Hills stations.
In December 2005, Bankhead station was the first MARTA station to implement Breeze Cards, and there was a controversy when it was discovered that the fare gates ended 15 inches (380 mm) from the ground, which allowed fare evaders to crawl underneath the gates. The issue was fixed by installing plastic bars to the bottom of the gates, reducing the gap to 6 inches (150 mm) and virtually eliminating the possibility of fare evaders crawling through it.
In 2019, MARTA announced a proposal to change the name of Bankhead station to Donald Lee Hollowell Station, reflecting the new name of Bankhead Highway.[4]
Future
The platform is scheduled to be lengthened to accommodate six-car trains by 2025,Template:Update inline due to significant development planned around the station[5] and to accommodate the upcoming CQ400 trains, which will be four-car sets instead of two like the existing models. This would allow longer trains to run on the Green Line and could make way for a potential extension towards Cobb County.
Nearby landmarks & popular destinations
- Maddox Park
- Westside Park
- BeltLine Westside Trail
- King Plow Arts Center
- Fulton County Jail
- Fulton County Division of Family and Children Services
Bus routes
The station is served by the following MARTA bus routes:
- Route 26 - Marietta Street / Perry Boulevard
- Route 50 - Donald Lee Hollowell Parkway
References
- Script error: No such module "citation/CS1".
External links
- Station Overview, including video tour
- MARTA Guide Template:Webarchive
- Atlanta Beltline Westside Trail
- Donald Lee Holowell Bankhead entrance from Google Maps Street ViewTemplate:Dead link
- ↑ Script error: No such module "citation/CS1".Template:Cbignore
- ↑ Script error: No such module "citation/CS1".Template:Cbignore
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".