Arlecdon railway station
Template:Short description Template:Use dmy dates Template:Use British English Script error: No such module "Infobox".Template:Template otherScript error: No such module "Parameter validation".Script error: No such module "Check for unknown parameters".Script error: No such module "check for deprecated parameters".
Template:Cleator & Workington Junction Railway RDT Template:Whitehaven, Cleator and Egremont Railway RDT
Arlecdon railway station served the village of Arlecdon in the former English county of Cumberland, now part of Cumbria.
Location
The station was the southern passenger terminus of the Cleator and Workington Junction Railway's (C&WJR) otherwise mineral branch which left the company's Template:Rws to Template:Rws main line at Rowrah Branch JunctionTemplate:Sfn south of Distington.Template:SfnTemplate:Sfn The Script error: No such module "convert"., single track branch opened for mineral traffic on 1 May 1882 and was known locally as "Baird's Line" and officially as the Rowrah Branch.
The branch's main purpose was to access the limestone quarries at Arlecdon's near neighbour Rowrah and the iron mines served by the Rowrah and Kelton Fell Railway, (RKFR) which the branch joined Script error: No such module "convert". east of the station at Rowrah Junction.Template:Sfn
The branch was six and a three quarter miles long, but its point to point length was a mere four and a half miles, the difference being due to the extremely sinuous course it had to take to keep the ruling gradient to a "mere" 1 in 44.Template:SfnTemplate:Sfn The gradients largely favoured loaded trains, but they still had to cope with half a mile uphill through Arlecdon and a mile and a half uphill from Brownriggs GillTemplate:Sfn to Whillimoor Top.
History
The C&WJR was one of the fruits of the rapid industrialisation of West Cumberland in the second half of the nineteenth century, specifically being born as a reaction to oligopolistic behaviour by the London and North Western and Whitehaven, Cleator and Egremont Railways.Template:Sfn
All lines in the area were primarily aimed at mineral traffic, notably iron ore, coal and limestone, none more so than those built by the C&WJR, which earned the local name "The Track of the Ironmasters". General goods and passenger services were provided, but were very small beer compared with mineral traffic.Template:Sfn
The founding Act of Parliament of June 1878 confirmed the company's agreement with the Furness Railway that the latter would operate the line for one third of the receipts.Template:Sfn
Services
Passenger services to Arlecdon were a stuttering affair. An attempt to provide a regular Mondays to Saturdays service lasted a mere five months in 1883. In 1912 a Saturdays only out and back service to Template:Rws calling at Template:Rws, Template:Rws and Template:Rws was tried, but it was cut back to Oatlands from the end of 1916, never to resume. Given the sparse population of Arlecdon and surrounds to this day the venture had little chance of success.
Unadvertised workmen's trains fared rather better, as here the sparse population worked in the railway's favour, with significant points of employment with similar start and end shift patterns at Rowrah and Oatlands, Records do not yet show when such services started, but they outlived the public passenger services by ten years, ending for good on 1 January 1927. The line's 1920 Working Time Table shows two early morning trains from Oatlands to Arlecdon which turned straight round and went back again, with a similar procedure at the early afternoon shift change.Template:Sfn
In January 1898 the company agreed with the Postmaster General to carry a mail bag daily between Workington and Siddick and between Workington and Distington.Template:Sfn It is likely that this was conveyed on passenger trains. At some point thereafter the service was extended to Rowrah. The "Mail Train" beyond Distington to Oatlands and Arlecdon usually consisted of a C&WJR 0-6-0ST and a guards van.Template:Sfn
Mineral traffic was an altogether different matter, dwarfing all other traffic in volume, receipts and profits. The key source summarises it "...the 'Track of the Ironmasters' ran like a main traffic artery through an area honeycombed with mines, quarries and ironworks."Template:Sfn The associated drama was all the greater because all the company's lines abounded with steep inclinesTemplate:Sfn and sharp curves,Template:Sfn frequently requiring banking. The saving grace was that south of Workington at least, most gradients favoured loaded trains. During the First World War especially, the company ran "Double Trains", akin to North American practice, with two mineral trains coupled together and a banking engine behind, i.e. locomotive-wagons-guards van-locomotive-wagons-guards van-banker. Such trains worked regularly between Template:Rws and Template:Rws.Template:Sfn The practice was discontinued after dark from 1 April 1918.Template:Sfn
Like any business tied to one or few industries, the railway was at the mercy of trade fluctuations and technological change. The Cumberland iron industry led the charge in the nineteenth century, but became less and less competitive as time passed and local ore became worked out and harder to win, taking the fortunes of the railway with it. The peak year was 1909, when 1,644,514 tons of freight were handled.Template:Sfn Ominously for the line, that tonnage was down to just over 800,000 by 1922, bringing receipts of £83,349, compared with passenger fares totalling £6,570.Template:Sfn
Rundown and closure
The high water mark for tonnage on C&WJR lines was 1909, the high water mark for progress was 1913, with the opening of the Harrington and Lowca line for passenger traffic. A chronology of the line's affairs from 1876 to 1992 has almost no entries before 1914 which fail to include "opened" or "commenced". After 1918 the position was reversed, when the litany of step-by-step closures and withdrawals was relieved only by a control cabin and a signalbox being erected in 1919 and the Admiralty saving the northern extension in 1937 by establishing an armaments depot at Broughton.Template:Sfn
Bairds Line was hit from three directions:
- Iron Ore became harder and costlier to win in the mines beyond Rowrah. The RKFR last paid a dividend in 1910, with Limestone being the biggest contributor. Most mines were worked out by 1914.Template:Sfn
- Oatlands Colliery ceased winding coal in 1932, depriving the branch of the only source of business which could not be dealt with by other routes,Template:Sfn and
- The LMSR, who had taken over all formerly rival company lines in the area in the Grouping of 1923 saw easy savings to be made by re-routing the residual limestone traffic from Rowrah first northwards via Template:Rws and Marron Junction, then, some years later, via Template:Rws where it continued until March 1978.Template:Sfn
The branch closed on 8 August 1938, along with Arlecdon and Oatlands stations which, like thousands of unsung stations right up to Beeching, were still providing a local goods service. Half a mile of Baird's Line was left in place at Arlecdon to act as a "backshunt" for the trains accessing the quarries. this remained in use until 1978 and was lifted in 1980 along with all other lines serving Rowrah.Template:SfnTemplate:Sfn
Afterlife
By 2008 the station building had been converted into a private dwelling.Template:Sfn By 2014 earthworks still remained at this meeting point of two formerly busy industrial railways.
| Preceding station | Disused railways | Following station | ||
|---|---|---|---|---|
| Template:Rws | Cleator and Workington Junction Railway "Baird's Line" |
Terminus |
See also
Script error: No such module "Portal".
References
<templatestyles src="Reflist/styles.css" />
Script error: No such module "Check for unknown parameters".
Sources
- Script error: No such module "Citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "Citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "Citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "Citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
Further reading
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "Citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "Citation/CS1".
- Script error: No such module "Citation/CS1".
- Script error: No such module "citation/CS1".
External links
- Map of the CWJR with photos, via RAILSCOT
- Map of the WC&ER with photos, via RAILSCOT
- The station, via Rail Map Online
- The line and colliery on overlain OS map, via National Library of Scotland
- The line and closed station on a 1948 OS Map, via npe maps
- The station and line, via railwaycodes
- The railways of Cumbria, via Cumbrian Railways Association
- Photos of Cumbrian railways, via Cumbrian Railways Association
- The railways of Cumbria, via Railways_of_Cumbria
- Cumbrian Industrial History, via Cumbria Industrial History Society
- 5 September 1954, 7 May 1966 and 2 March 1968 railtours, via sixbellsjunction
- A video tour-de-force of the region's closed lines, via cumbriafilmarchive
- 1882 RCH Diagram showing the station, see page 173 of the pdf, via google
- Haematite, via earthminerals
- Coal and iron ore mining in Cleator Moor, via Haig Pit
- Photos of the C&WJR staff, tickets and timetables, via Harrington History
- Photos of Calva Jct to Buckhill, via Tim Harris
- Photos of Siddick Junction - Calva - Broughton Moor, via derbysulzers
- Cycle Network at Seaton, via visitcumbria
- Modern times at the station, via visitcumbria
- Pages with script errors
- Articles using Infobox station with markup inside name
- Articles using Infobox station with links or images inside name
- Pages with no open date in Infobox station
- Pages with broken file links
- Former Cleator and Workington Junction Railway stations
- Disused railway stations in Cumbria
- Railway stations in Great Britain opened in 1883
- Railway stations in Great Britain closed in 1916
- 1883 establishments in England