Adria–Wien Pipeline

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Script error: No such module "Infobox".Script error: No such module "Check for unknown parameters".

The Adria–Wien Pipeline (AWP) is a crude oil pipeline, which connects the Transalpine Pipeline from Würmlach at the Italian-Austrian border with the Schwechat Refinery near Vienna, Austria. It allows oil supplies to Austria from the Italian oil terminal in Trieste.[1]

History

The planning of the pipeline started in 1965 with establishment of Adria–Wien Pipeline GmbH. The construction started in 1969 and the pipeline was commissioned in 1970.

Technical features

The length of the pipeline is Script error: No such module "convert".. It has also a Script error: No such module "convert". long branch line to Lannach. The diameter of the main pipeline is Script error: No such module "convert". and it consists of 12 pumping stations. The capacity of the pipeline is 8 million tons of crude oil per year.[2]

Operating company

The pipeline is operated by Adria–Wien Pipeline GmbH, in which OMV owns 76%.[1] Other shareholders are BP Austria, Shell Austria, Esso Austria and Agip.

References

<templatestyles src="Reflist/styles.css" />

  1. a b Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Script error: No such module "Portal".

[[Category:Template:Resolve category redirect]]Template:Coord missing/CheckCat