Activity cycle diagram

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Script error: No such module "Unsubst".

An activity cycle diagram (ACD) is a graphical modeling tool to depict interactions among objects in a system.[1]

Origin

The ACD is a modeling tool that was developed in 1960 following the flow diagram method of K.D. Tocher.[2] It pertains to the activity-based paradigm of system modeling, as opposed to process-oriented or event-based paradigms. The activity-based modeling is a natural way to represent the knowledge about a system in the activity paradigm of discrete event simulation.

Characteristics

The activity cycle diagram is characterized by its focus on the life cycle of the components of a system, distinguishing for each component a "dead" state and an "active" state.[3]

Implementation

In activity-based modeling,[4] the dynamics of system is represented as an ACD which is a network model of the logical and temporal relationships among the activities. An ACD is easily implemented with the activity scanning method of simulation execution.[5]

External links

  • [1] INTRODUCTION TO DISCRETE EVENT SIMULATION
  • [2] MODEL DEVELOPMENT LIFE CYCLE
  • [3] ACTIVITY CYCLE DIAGRAMS
  • [4] SIMULATION USING ARENA
  • [5] ADVANCED SIMULATION USING ARENA
  • [6] SIMULATION OUTPUT ANALYSIS

Sources

  1. ↑ Script error: No such module "Citation/CS1".
  2. ↑ Script error: No such module "citation/CS1".
  3. ↑ Script error: No such module "citation/CS1".
  4. ↑ Script error: No such module "citation/CS1".
  5. ↑ Script error: No such module "citation/CS1".


Template:Asbox