Uri Dam

From Wikipedia, the free encyclopedia
(Redirected from Uri-II)
Jump to navigation Jump to search

Template:EngvarB Script error: No such module "Unsubst". Script error: No such module "Type in location".Script error: No such module "Infobox".Script error: No such module "Check for unknown parameters".Expression error: Unexpected < operator

Uri Dam, refers to the existing Uri-I Stage-I Hydroelectric Dam Project with 480 MW hydroelectric power generation capacity[1][2] and the downstream under-construction Uri-I Stage-II Hydroelectric Dam Project with 240 MW hydroelectric power generation capacity,[3] on the Jhelum River near Uri in Baramula district of the Jammu and Kashmir in India. Operated by the NHPC[4] and located very near to the Line of Control - the de facto border between India and Pakistan,[1] both are run-of-the-river projects because the Indus Waters Treaty (IWT) gives Pakistan the exclusive right to regulate the Jhelum River.[2]

Stages

Uri-I Stage-I project

Script error: No such module "anchor".

Uri-I Stage-I project dam largely built under a hill with a 10 km tunnel.[2] Uri-I Stage-I project, construction of which started in 1989[5] and completed in 1997, cost approximately Rs. 33 billion (about 450 million EUR or US$660 million)[1] with the partial funding by the Swedish and British governments.[6] The construction was awarded by the National Hydroelectric Power Corporation in October 1989 to a European consortium called Uri Civil led by Swedish Skanska and including Swedish NCC and ABB and British Kvaerner Boving.[5] The workforce included about 200 foreigners and 4,000 Indians, many from the local area.[2][7][8]

Uri-I Stage-II project

Script error: No such module "anchor".

Plans for constructing a 240 MW Uri-II plant were announced in 1998,[4] and foundation stone was laid in 2014,[9] and tender for construction was floated in 2025.[3] The delay in construction was caused because the Government of Pakistan objected to the project stating that it violates the Indus Waters Treaty.[4][10] On 4 July 2014, Prime Minister Narendra Modi laid the foundation stone for the Uri-I Stage-II power project.[9][11]

Current status

  • 2025 Jun: "Uri-I Stage-I" is operational since 1997,[1] and the "Uri-I Stage-II" construction tender were floated in 2025.[3]

See also

References

<templatestyles src="Reflist/styles.css" />

  1. a b c d Script error: No such module "citation/CS1".
  2. a b c d Script error: No such module "citation/CS1".
  3. a b c पानी को लेकर गिड़गिड़ा रहा पाक, इधर भारत ने बना लिया खास प्लान; नए प्रोजेक्ट्स में स्टोरेज पर फोकस, MSN, 11 June 2025.
  4. a b c Script error: No such module "citation/CS1".
  5. a b Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Sveriges Radio P3 Dokumentär: Kidnappningen i Kashmir by Fredrik Johnsson and Kristofer Hansson. First broadcast on 7 December 2008. Radio documentary with interviews.
  9. a b Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

<templatestyles src="Stack/styles.css"/>

Script error: No such module "Portal".

Script error: No such module "Check for unknown parameters".

Template:Hydrography of Jammu and Kashmir Template:Power Plants of Jammu and Kashmir Template:Jhelum River dams

Script error: No such module "Coordinates".