Thameslink (train operating company, 1997–2006)
Template:Use dmy dates Template:Use British English Script error: No such module "about". Script error: No such module "Distinguish". Script error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".Script error: No such module "Check for clobbered parameters".
Thameslink[1] was a train operating company in the United Kingdom owned by Govia that operated the Thameslink franchise between March 1997 and March 2006.
The franchise was originally due to end on 31 March 2004, however a two-year extension was awarded to Govia by the Strategic Rail Authority on 13 February 2004.[2] In December 2005, the Department for Transport awarded the new franchise to FirstGroup; thus the services operated by Thameslink were transferred to First Capital Connect on 1 April 2006.
Services
Thameslink operated passenger services from Bedford via the Thameslink route to London Moorgate, Sutton, Wimbledon and Brighton.
Rolling stock
Thameslink inherited a fleet of 66 Class 319s from Network SouthEast.
During 2002, Thameslink hired two Class 317s from West Anglia Great Northern for services to Moorgate. Thameslink received some extra Class 319s from Southern in 2004.
Between September 2004 and May 2005, Class 317s were hired from West Anglia Great Northern to operate Bedford to St Pancras services while the Thameslink line was severed for six months for the new St Pancras station to be built.[3]Template:Full citation needed
| Class | Image | Type | Top speed | Number | Built | |
|---|---|---|---|---|---|---|
| mph | km/h | |||||
| 317 | File:317305 at Cambridge.jpg | electric multiple unit | 100 | 160 | 7 | 1981–1982 |
| 319 | File:Class 319 Thameslink train Luton Airport Parkway.JPG | electric multiple unit | 100 | 160 | 74 | 1987–1988, 1990 |
Depots
Thameslink's fleet was originally maintained at Selhurst Depot under sub-contract by Connex South Central/Southern.[4]Template:Full citation needed With the Thameslink line to be severed for six months, Bedford Cauldwell depot was built in 2004. It progressively took over all work from Selhurst.[5]
Demise
In April 2005, the Strategic Rail Authority announced the parties shortlisted to bid for the new Thameslink Great Northern franchise; Govia was not shortlisted.[6] In December 2005, the Department for Transport awarded the new franchise to FirstGroup. Accordingly, the services that were operated by Thameslink were transferred to First Capital Connect on 1 April 2006.[7] However, it was announced in May 2014 that Govia had reclaimed the Thameslink franchise, which started on 14 September 2014, thus ending the First Capital Connect franchise. Govia now operates Thameslink under Govia Thameslink Railway.
See also
References
External links
- Template:Commonscat-inline
- Internet archive of official site as at 30 March 2005
- ↑ Companies House extract company no 3013232 Thameslink Rail Limited
- ↑ Script error: No such module "citation/CS1".
- ↑ Template:Cite magazine
- ↑ Template:Cite magazine
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- Pages with script errors
- Pages with broken file links
- Defunct train operating companies in the United Kingdom
- Go-Ahead Group companies
- Keolis
- Railway companies established in 1997
- Railway companies disestablished in 2006
- Railway operators in London
- Rail transport in Bedfordshire
- Thameslink
- 1997 establishments in England
- 2006 disestablishments in England
- British companies established in 1997