Talk:STS-102

From Wikipedia, the free encyclopedia
Latest comment: 4 September 2017 by InternetArchiveBot in topic External links modified
Jump to navigation Jump to search

Template:WikiProject banner shell

Confusing prose or plain error?

I honestly can't make the following passage from the Mission highlights to make overall sense — it actually seems to contradict itself. Maybe it is the result of some slight cut'n'paste mishap or something of the like (pure speculation, I admit):

The primary cargo for the mission was the Leonardo Multipurpose Logistics Module (MPLM), with six racks for the U.S.Destiny Laboratory Module, delivered and installed onto the station during STS-98. The STS-102 crew installed Leonardo onto the International Space Station in order to unload its contents and then return it to Earth.

Now, which mission was it really that installed Leonardo, STS-98 or STS-102? Is the above a botched attempt to convey that STS-98 installed it and STS-102 later returned it to Earth? --Wernher 15:54, 24 Apr 2004 (UTC)

STS-102 ISS 5A.1 — Preceding unsigned comment added by 188.25.110.199 (talk) 02:51, 23 October 2012 (UTC)Reply

External links modified

Hello fellow Wikipedians,

I have just modified one external link on STS-102. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:

When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.

Template:Sourcecheck

Cheers.—InternetArchiveBot (Report bug) 23:27, 4 September 2017 (UTC)Reply