Talk:Frankston line

From Wikipedia, the free encyclopedia
Latest comment: 10 August 2023 by RMCD bot in topic Move discussion in progress
Jump to navigation Jump to search

Template:Tmbox[[Category:Template:GA/Topic good articles|Frankston line]] Template:Talkheader Template:Australian English Template:WikiProject banner shell

Template:Old move

Early text

I added the infrastructure section, but I am not familiar with the infrastructure after Cheltenham station. --  B.d.mills  (Talk) 22:10, 20 Apr 2005 (UTC)

External links modified

Hello fellow Wikipedians,

I have just modified one external link on Frankston railway line. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:

When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.

Template:Sourcecheck

Cheers.—InternetArchiveBot (Report bug) 17:03, 6 October 2017 (UTC)Reply

Note for page update

As this is one of the few services in Melbourne that runs the full lenght of the line (excluding an extension as the Stony Point service), there will need to be a few extra section added compared to the other Metro Trains Melbourne services.

  • Both rail service and rail line infoboxes - service will cover important info regarding the current server while line will cover the physical line info not covered in the service one (eg former connection, line electrification dates, etc).
  • Former stations - For stations where they aren't notable enough for their own page, they at supposed to be included on the rail line page. For other Melbourne services, this can be moved to the closed extended sections page (where the extended section is itself notable enough to have a separate page).

-- ThylacineHunter (talk) 09:43, 7 February 2023 (UTC)Reply

The reason for this is that this page needs to be treated as a merged Frankston Metro Service page and a Frankston Railway Line page. Unlike some of the other Melbourne ones (eg Cranbourne Metro Service with the separate South Gippsland railway line). -- ThylacineHunter (talk) 10:34, 7 February 2023 (UTC)Reply
Service infobox:
  1. Name: Frankston Service - to distinguish it from the Frankston (Physical Track)
  2. First service: 1 August 1882 - useful information
  3. Length: the correct length according to Metro Trains Melbourne documentation of the electrified Frankston line is 43.230km
  4. Average journey time: 1 hour 7 minutes (does not need "~" as it is already described as an average time)
  5. Frequency: still need checking, I just copied previous info (I will check it with the official timetable when I get time later this week)
  6. Former operator: Victorian Railways (VR) (1882–1974) - was only to Mordialloc in 1881 so not a Frankston service
-- ThylacineHunter (talk) 11:06, 7 February 2023 (UTC)Reply
Ok good idea. Make sure to also add the closed stations into the track map (different to the metro train service map) when you have some time. I'll then nominate it for GA status once this has been completed. HoHo3143 (talk) 09:20, 8 February 2023 (UTC)Reply
The route map is waiting on Template talk:Rail-interchange#Template-protected edit request on 7 February 2023, apparently Stony Point didn't exist in the rail-interchange template. -- ThylacineHunter (talk) 09:27, 8 February 2023 (UTC)Reply
Interesting... hopefully they approve the edit soon. In the mean time, that's the map for the metro service- what about one for the rail line (example: Cranbourne Line)? HoHo3143 (talk) 09:35, 8 February 2023 (UTC)Reply
Both are now done
--ThylacineHunter (talk) 12:30, 8 February 2023 (UTC)Reply

no mention of the line being connected to the craigieburn line

as this is in important part of the line's future I don't see why it has basically 0 mention in the article. Although it isn't comfirmed yet it should have some mentioning in the article probably like a sentence or two NotOrrio (talk) 22:10, 7 February 2023 (UTC)Reply

According to the PTV 2025 map that won't be the case. You also just wrote "although it may not be confirmed"?! HoHo3143 (talk) 06:37, 8 February 2023 (UTC)Reply
@NotOrrio I've just done a quick google search and nothing has come up- where have you heard this? HoHo3143 (talk) 06:40, 8 February 2023 (UTC)Reply
it won't be present in 2025 as the two lines being connected will happen in stage four of the Network Development Plan Metropolitan Rail. To clarify I saw this in the following pdf [1] uploaded to PTV NotOrrio (talk) 06:44, 8 February 2023 (UTC)Reply
I've gone ahead and made a one sentence mention. HoHo3143 (talk) 09:15, 8 February 2023 (UTC)Reply
corrected it to although it isn't comfirmed yet as that was what i was trying to originally say NotOrrio (talk) 06:46, 8 February 2023 (UTC)Reply

Route maps have an error

Waiting on Template talk:Rail-interchange#Template-protected edit request on 7 February 2023. -- ThylacineHunter (talk) 12:38, 8 February 2023 (UTC)Reply

This has now been fixed. -- ThylacineHunter (talk) 13:33, 11 February 2023 (UTC)Reply

Talk:Frankston railway line/GA1

Move discussion in progress

There is a move discussion in progress on Talk:Glen Waverley railway line which affects this page. Please participate on that page and not in this talk page section. Thank you. —RMCD bot 02:03, 10 August 2023 (UTC)Reply