Sydney–Melbourne rail corridor
Template:Short description Template:Use dmy dates Template:Use Australian English Script error: No such module "Unsubst". Script error: No such module "Infobox".Template:Template other The Sydney–Melbourne rail corridor consists of the Script error: No such module "convert". long Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". standard-gauge main line between the Australian state capitals of Sydney (New South Wales) and Melbourne (Victoria), the two largest cities in Australia and the lines immediately connected to it.[1] Freight and passenger services operate along the route, including the NSW TrainLink XPT passenger service.
The corridor consists of the Main Southern railway line from Sydney's Central Station to Albury Station – Script error: No such module "convert". – and Victoria's North East railway line – Script error: No such module "convert". – from Albury to Melbourne's freight terminals and Southern Cross station.
History
Script error: No such module "Labelled list hatnote". In 1883, the Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". Victorian Railways broad gauge line met the Script error: No such module "Track gauge".Script error: No such module "Check for unknown parameters". New South Wales Government Railways standard gauge line at Albury. The two tracks were separated by an island platform Script error: No such module "convert". long. The break of gauge, for both passenger and freight traffic, continued until 1962, when the Victorian North East standard gauge line was completed.[2]
Intercapital passenger services such as the Spirit of Progress, Southern Aurora, and Intercapital Daylight once operated in the corridor.
Sydney to Melbourne XPTs don't commonly use the Main Southern railway line between Lidcombe and Glenfield, instead using the East Hills line.
Freight services
Script error: No such module "Unsubst".
Passenger services
The XPT service runs two return trips each day between Melbourne and Sydney, making scheduled stops at Broadmeadows, Seymour, Benalla, Wangaratta, Albury, Wagga Wagga, Junee, Cootamundra, Yass Junction, Goulburn, Moss Vale, Campbelltown and Central with optional stops at Culcairn, Henty, The Rock, Harden and Gunning. The stops at Broadmeadows and Seymour were introduced on Sunday 25 November 2012.[3] Before then, the XPT ran express from Melbourne to Benalla.
All four daily XPT services take about 11 hours.
Infrastructure shortcomings and upgrades
A huge deficiency in interstate rail investment compared with investment in highways has existed since the 1960s.Script error: No such module "Unsubst". Although the standard gauge line is about Script error: No such module "convert". long, the journey on the road equivalent of the corridor – the Hume Highway – is now about Script error: No such module "convert". shorter than the rail line. Relatively high road speeds are possible because the highway now bypasses many of the towns where there were speed limits. Further, in 2013 the entire Hume Highway was completed as a dual carriageway, whereas the rail line is still single-track in some places – a significant impediment to continuous running.
Another major impediment of the corridor is the prevalence of curves with small radii – some are only Script error: No such module "convert". – and the sheer number of curves, which are equivalent to rotating the train by 72 circles (36 circles to the right and 36 circles to the left) along the entire route.[4][5][note 1] Consequently, some sections of the line are signalled for a top speed of only Script error: No such module "convert".. Even so, freight trains often struggle to reach that speed in places.
Maximum benefit, whether improved transit times and reduced diesel fuel consumption and emissions, accrues from routes being straightened, and gradients reduced, on a large scale. However, such proposals come with greater risk of delay or cancellation. In a climate of long-term failure to prioritise investment in rail and with earlier completion in mind, funding has most often gone to projects with smaller deviations over shorter distances.Script error: No such module "Unsubst".
For a long time, the corridor was double track from Sydney to Junee, and single track from there on with a number of short crossing loops, but between 2008 and 2011 about Script error: No such module "convert". of the former broad-gauge track between Seymour and Wodonga was standardised to form a double track section north of Seymour. A Script error: No such module "convert". double-track northern bypass of Wodonga was also constructed. The single track resumes just south of the Murray River and Albury. Several passing loops of about Script error: No such module "convert". length each have been added between Junee and Albury and between Seymour and Craigieburn. These changes, and full concrete sleepering of the line and many signalling upgrades were completed by 2012. Old Script error: No such module "convert". rail between Melbourne and Albury was also replaced with new Script error: No such module "convert". rail.
Since passenger trains receive priority over freight trains, a freight-only track known as the Southern Sydney Freight Line was added in Sydney in 2012. This single track line (with two crossing loops) allows freight trains to travel into and out of the freight terminals during passenger peak times. Some works have also been made in Melbourne to improve the flow of freight trains into the port.
Modest proposals for straightening alignments in the Sydney–Melbourne rail corridor have included a minor Script error: No such module "convert". Jindalee deviation, advocated in a 2006 report,Script error: No such module "Unsubst". and upgrading of sections for medium speeds, advocated in 2022.[6] Another proposal involved use of tilting trains, which can travel through curved sections of track at speeds of up to Script error: No such module "convert". and reduce the 11-hour journey time between Sydney and Melbourne to about six hours.
A number of deviations have been variously proposed for improving the alignment between Junee and Sydney.[7] About Script error: No such module "convert". of winding track would be replaced by about Script error: No such module "convert". of straighter track. Although a 2008 Australian Rail Track Corporation (ARTC) report documented plans for a few minor deviations to be completed by 2014,[8] since 2023[update]Template:Dated maintenance category (articles)Script error: No such module "Check for unknown parameters". the work had not started.Script error: No such module "Unsubst".
High-speed rail proposals
Script error: No such module "Labelled list hatnote".
Based on the international definition of a minimum top speed of Script error: No such module "convert". in passenger service, high-speed rail in Australia does not yet exist. Numerous proposals for high-speed rail infrastructure in Australia (also known as very fast train projects) have been conducted since the early 1980s,[9] but none has proceeded further.
Various combinations of the route between Melbourne, Canberra, Goulburn, Sydney, Newcastle, Coffs Harbour, Gold Coast and Brisbane have been the subject of detailed investigation by prospective operators, government departments and advocacy groups.
Most recently, phase 1 of a $20m high-speed rail study was released in 2011.[10] It proposed a corridor similar to a 2001 study, with prospective stations located in Melbourne, Tullamarine, Albury, Canberra, Goulburn, Sydney, Newcastle, the Mid–North Coast, Gold Coast and Brisbane. The cost was estimated at $61 billion, but it was noted that cost blowouts or adoption of more difficult alignments could raise the cost to more than $100 billion. The report urged the authorities to acquire land on the corridor as soon as practicable to avoid further price rises.[10]
Work on phase 2 of the study culminated in the release of the High speed rail study phase 2 report [11] in 2013. Building on the work of phase 1, it was more comprehensive in objectives and scope and refined many of the phase 1 estimates, particularly demand and cost estimates.
Script error: No such module "Portal".
Notes
<templatestyles src="Reflist/styles.css" />
- ↑ steep gradients – some are 1:38 or 2.6% adjusted for curvature.
Script error: No such module "Check for unknown parameters".
References
<templatestyles src="Reflist/styles.css" />
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
Script error: No such module "Check for unknown parameters".
Work consulted