S7 (Berlin)
Jump to navigation
Jump to search
Template:Use dmy dates Script error: No such module "infobox".Script error: No such module "Check for unknown parameters".
S7 is a line on the Berlin S-Bahn.[1] It operates from Ahrensfelde to Potsdam over:
- the Wriezen Railway, completed on 1 May 1898 and electrified to Marzahn in 1976, to Mehrower Allee in 1980 and to Ahrensfelde in 1982,
- a section of the Outer ring, completed in the early 1940s as part of the Outer freight ring and electrified in 1976,
- a section of the Prussian Eastern line, opened on 1 October 1866 and electrified on 6 November 1928,
- the Stadtbahn, opened on 7 February 1882 and electrified on 11 June 1928,
- a section of the Berlin-Blankenheim line, opened west of Grunewald in 1879 and further east in 1882 and electrified in 1928 and
- a section of the Berlin-Potsdam-Magdeburg line, opened in 1838 and electrified in 1928.
Service history
The S7 was created on 2 June 1991, replacing the Red route of the East Berlin S-Bahn between Alexanderplatz and Template:Stn, with the western terminus extended to Friedrichstraße.[2][3]
Gallery
-
S7 leaving Berlin Hauptbahnhof en route for Ahrensfelde
References
<templatestyles src="Reflist/styles.css" />
Script error: No such module "Check for unknown parameters".