D3 motorway (Czech Republic)
Template:Short description Script error: No such module "about". Script error: No such module "Infobox".Template:Template otherScript error: No such module "Infobox road/errors".Script error: No such module "Check for unknown parameters".[[Category:Infobox road instances Template:Infobox road/meta/mask/category]] The D3 motorway (Template:Langx) is a motorway in the Czech Republic. Once completed, the Script error: No such module "convert". motorway will connect Prague with the Austrian Mühlviertel Expressway (S10) to Linz. As of December 2024, only the middle section (Script error: No such module "convert".[1]) of the motorway is in operation; namely a section from Mezno to Kaplice-nádraží. A further Script error: No such module "convert". from Kaplice-nádraží to Czech Republic–Austria border is currently under construction.[2] The D3 motorway is part of the European route E55.
The D3 motorway in the South Bohemian Region towards the Austrian border should be completed by 2026.[3] Completion of D3 in the Central Bohemian Region is planned by 2028, however its designed course through the Lower Sázava landscape is still objected and opposed by environmental and citizens associations.
A nationwide trial of variable speeds of up to 150 km/h will begin on the D3 between Tábor and České Budějovice in summer of 2025, with factors such as weather conditions and traffic density influencing the maximum speed allowed.[4]
Chronology
The construction of the motorway has been planned since 1987.Script error: No such module "Unsubst". In 1988, the D3 was started with the construction of the Tábor bypass, which, however, was not designated as a motorway. By Government Resolution No. 741 of July 1999, it was included in the motorway network.
In October 2004, the first Script error: No such module "convert". long section Chotoviny–Čekanice was put into operation. The Mezno–Chotoviny section was under construction since 2005 and was put into operation on 17 December 2007.[5]
In 2008, the construction of the Script error: No such module "convert". long section Tábor–Veselí nad Lužnicí was started, which was put into operation on 28 June 2013. At the same time, sections from the 1980s and 1990s between Stoklasná Lhota and Měšice were reconstructed.[6] The Tábor bypass was then redesignated as a motorway, leaving a short 400 metre section undesignated until 2024.
A Script error: No such module "convert". section from Dolní Třebonín to the border with Austria on the other side of the future S10 expressway was initially planned to be built as an expressway (Template:Langx) as well, however on 31 December 2015, the category of expressways (R) was abolished in the Czech Republic, so since then, it is now counted as part of the D3 motorway.
On 7 April 2017, the Script error: No such module "convert". section on the Veselí nad Lužnicí–Bošilec section was opened, which was completed from a half profile to a full motorway profile. The cost of this construction was CZK 635 million (excluding VAT). The opening ceremonies of these two sections cost the Regional Directorate of Transport a total of CZK 420,000, for which it was criticised.[7]
A Script error: No such module "convert". section near České Budějovice was opened on 27 September 2017.[8] The construction of this section cost CZK 720 million (excluding VAT) with cost mounting for construction of the grade-separated ring intersection.
In June 2024, ŘSD managed to start the completion of about 400 metres of the right-hand lane of the D3 motorway on the Tábor bypass, after obtaining a valid construction permit. Traffic there had been restricted due to a quarter-century-long dispute with the access to the motorway. The section became fully operational in August 2024.
On 21 December 2024, České Budějovice bypass (from Úsilný to Kaplice-Nádraží) was put into operation, marking the first time Script error: No such module "convert". of motorway opened in the Czech Republic in one calendar year.[9]
Future development
The Script error: No such module "convert". long section Kaplice-nádraží – Nažidla is under construction since June 2024, and is planned to open in 2026. The Script error: No such module "convert". section between Nažidla and the state border with Austria is in construction since January 2024, and planned for opening in 2026.[10]
The northern segments between Prague and Mezno; at a total length of around Script error: No such module "convert". are planned to start construction in 2027, and planned to be put into operation by 2031Script error: No such module "Unsubst"..
Route description
Template:CZEinttop Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Template:CZEint Script error: No such module "Jctbtm".
Gallery
-
D3 motorway near Planá nad Lužnicí
References
<templatestyles src="Reflist/styles.css" />
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ https://apdos.roadmedia.cz/Upload/Stavby/46/infoletak_d3-nazidla-dolni-dvoriste.pdf?t=2024-01-09%2012:13:38.877 Template:Bare URL inline
Script error: No such module "Check for unknown parameters".
Content in this edit is translated from the existing Czech Wikipedia article at cs:Dálnice D3; see its history for attribution.
Template:Portalbar Script error: No such module "Navbox".
Script error: No such module "Coordinates". Template:Authority control