Template:Short description Template:Use American English The Nunn–McCurdy Amendment or Nunn–McCurdy Provision, introduced by Senator Sam Nunn and Congressman Dave McCurdy in the United States 1982 Defense Authorization Act and made permanent in 1983, is designed to curtail cost growth in American weapons procurement programs.
It requires notification to the United States Congress if the cost per unit goes more than 25% beyond what was originally estimated and calls for the termination of programs with total cost growth greater than 50%, unless the Secretary of Defense submits a detailed explanation certifying:
- the program is essential to national security, that no suitable alternative of lesser cost is available;
- new estimates of total program costs are reasonable; and
- management structure is (or has been made) adequate to control costs.
Congress normally regards the explanations from the Secretary of Defense as acceptable. It is unusual for a program to be cancelled as a result of notification, but it has led to many changes to project management.
In 2006, the House of Representatives proposed amending the provision to require a detailed explanation, including information about possible alternatives, at the 15%-cost-growth mark.Script error: No such module "Unsubst".
Examples
- The Space-Based Infrared System (SBIRS) was affected by the provision in 2002 and again in 2005.[1][2][3]
- The US Army's Future Combat Systems[4] was cancelled in 2009 due to cost overruns.
- Marine Corps' Expeditionary Fighting Vehicle[5] vehicle programs was cancelled in 2011 due to cost overruns.
- The US Navy's Zumwalt-class destroyer's production cost increased from a projected $3.15 billion to $5.82 billion per ship, triggering a Nunn–McCurdy Amendment breach and cancellation of further production in 2016.[6]
References
<templatestyles src="Reflist/styles.css" />
- ↑ 109th Congress, 2nd Session, House of Representatives. Hearing before the Committee on Science, The future of NPOESS: results of the Nunn-McCurdy review of NOAA's weather satellite program. June 8, 2006. Serial No. 109-53. Government Printing Office, Washington, D.C., 2007
- ↑ House Report 109-748 - Summary of activities of the Committee on Science U.S. House of Representatives for the One Hundred Ninth Congress, p.119. January 4, 2007. Government Printing Office, Washington, D.C., 2007
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ "Root Cause Analyses of Nunn-McCurdy Breaches -- Zumwalt-Class Destroyer, Joint Strike Fighter, Longbow Apache, and Wideband Global Satellite," Rand Corporation (2011); see Vol. 1, Ch. 3 via http://www.rand.org/pubs/monographs/MG1171z1.html Template:Webarchive.
Script error: No such module "Check for unknown parameters".
External links
- Script error: No such module "Ordinal".-congress/S/Template:Replace Department of Defense Authorization Act, 1982 at Congress.gov
- S.UP.AMDT.105 at THOMASScript error: No such module "Unsubst".
- 2002 Nunn–McCurdy breaches