Newtown railway station (Wales)

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "Unsubst". Template:Use British English Script error: No such module "Infobox".Template:Template otherScript error: No such module "Parameter validation".Script error: No such module "Check for unknown parameters".Script error: No such module "check for deprecated parameters". Newtown railway station (Template:Langx) is a railway station serving Newtown, Powys, Wales.

History

Newtown was the last major station before Moat Lane Junction where the Mid-Wales Railway, to Llanidloes, Rhayader, Builth Road and on to Cardiff (with a branch to Brecon), diverged from the Cambrian Railways main line (today's Cambrian Line) to Machynlleth and Aberystwyth.

It was also originally served by the (now mostly defunct) Llanidloes and Newtown Railway (opened in 1859 and initially isolated from the rest of the Welsh railway system) and the Oswestry and Newtown Railway (opened in 1861). All were subsequently subsumed into the Cambrian by 1865.The station was the eastern terminus of the Newtown and Machynlleth Railway opened by the Countess of Londonderry at Machynlleth station on 3 January 1863.[1]

The Mid-Wales line passenger service was withdrawn on 31 December 1962, though trains to and from this route latterly started and terminated at Moat Lane Junction. Services to Oswestry and Whitchurch via the former O&NR Cambrian main line ended in January 1965, when the route east of Buttington closed to passenger traffic as a consequence of the Beeching cuts.

Facilities

File:Newton Railway Station (Wales), Cambrian Line. View towards Dovey Junction. Passing loop.jpg
Station buildings in November 2023

The station currently has two through platforms, which are used separately for trains in either direction. The station is usually used as one of the passing points for trains on the Cambrian Line as it is a single track. The station has one west facing bay platform/siding which is periodically used as a storage point for Network Rail's departmental trains.

There is a Transport for Wales appointed "Station Agent" with full ticket issuing facilities in the main building. It also has a computer training centre. Train running information is provided by digital CIS displays, automatic announcements and customer help points on both platforms. Step-free access is available on both platforms, but the ramp to access Platform 2 is not suitable for wheelchair or mobility scooter users.[2]

From December 2023, construction on a new accessible footbridge with lifts began, with it hoped to be completed by the end of 2024.[3] Undertaken by Network Rail, the construction utilises funding from the Department for Transport's "Access for All" programme.[4]

Services

Trains run from here westwards to Template:Rws and then either Template:Rws or Template:Rws via Template:Rws (most trains convey a portion for both routes) and eastwards to Template:Rws and Template:Rws. There is a basic two-hourly service each way – on weekdays and Saturdays there are also some additional Shrewsbury to Aberystwyth services during the mornings and evenings. On Sundays there is a two-hourly service on the Shrewsbury – Aberystwyth axis, but only a limited service along the coast to/from Pwllheli (three in summer and one in winter).[5]

Template:Historical rail insert
Preceding station   National Rail National Rail   Following station
Transport for Wales
Cambrian Line
Scafell Halt
Line open, station closed
style="background:#Template:Cambrian colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Cambrian Railways
Template:Rmri Llanidloes and Newtown Railway
Oswestry and Newtown Railway Template:Rmri
style="background:#Template:Cambrian colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Abermule
Line open, station closed

References

<templatestyles src="Reflist/styles.css" />

  1. Engineering Timelines – Talerddig CuttingEngineering Timelines; Retrieved 6 May 2016
  2. Newtown station facilities National Rail Enquiries
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Template:NRtimes

Script error: No such module "Check for unknown parameters".

Further reading

  • Script error: No such module "citation/CS1".
  • Script error: No such module "citation/CS1".

External links

Template:Sister-inline

Template:Transport in Powys