Melbourne tram route 24
Template:Use dmy dates Template:Use Australian English Template:Infobox tram route
Melbourne tram route 24 was operated by Yarra Trams on the Melbourne tram network. It operated from Balwyn North to La Trobe Street West End in the Melbourne CBD. The 12.6 kilometre route was operated by A and C class trams from Kew depot.[1]
Route 24 began operating on 25 September 1972 as a peak hour derivative of route 48.[2] Between 23 May and 18 November 2005 it was extended via Docklands to Flinders Street West while the King Street Overpass was demolished.[3]
The route was discontinued on 26 July 2014 as part of a wider timetable change to the Yarra Trams network.[4] It only operated in peak hours.[5]
Map
References
<templatestyles src="Reflist/styles.css" />
- ↑ Facts & figures Yarra Trams
- ↑ History of Melbourne Trams Routes from 1950 to 2009 Template:Webarchive Yarra Trams
- ↑ Temporary changes to tram services - Flinders Street Overpass Removal Yarra Trams 13 May 2005
- ↑ Capacity boost for tram passengers Yarra Trams 9 July 2014
- ↑ Route 24 timetable Public Transport Victoria 18 November 2012
Script error: No such module "Check for unknown parameters".
External links
Script error: No such module "Navbox".