Line 7 of the Beijing Subway (Template:Zh) is a rapid transit line in Beijing. It runs parallel and to the south of Line 1 and Batong line, from the Beijing West railway station in Fengtai District to Template:Stl in Tongzhou District. Like Line 6, Line 7 provides additional relief to the overcapacity Line 1 adding another east–west trunk line to the Beijing Subway network.[1] The line uses 8-car Type B trains.[2][3] Line 7's color is light orange.
Stations
List of stations from west to east.[4]
| Station Name | Connections | Nearby Bus Stops | Distance kmScript error: No such module "Check for unknown parameters".[5] |
Location | ||
|---|---|---|---|---|---|---|
| EnglishScript error: No such module "Check for unknown parameters". | ChineseScript error: No such module "Check for unknown parameters". | |||||
| Template:Stl | Script error: No such module "Lang". | Template:Rint Template:Rint Template:Rint Template:Rint BXP | 3 9 21 40 42 50 52 53 62 65 67 89 96 109 122 129 142 143 144 309 320 339 349 374 387 394 410 414 616 663 820 836 890 917 917快 941 941快 968 982 997 快速直达专线52 夜5 夜8 夜14 夜15 夜22 夜23 夜36 专138 专191Script error: No such module "Check for unknown parameters". | 0.000 | 0.000 | Fengtai |
| Template:Stl | Script error: No such module "Lang". | 6 38 42 45 46 53 57 69 76 85 89 109 122 133 137 390 410 414 477 快速直达专线86 快速直达专线154 夜7 夜22 专138Script error: No such module "Check for unknown parameters". | 0.935 | 0.935 | Xicheng | |
| Template:Stl | Script error: No such module "Lang". | Template:Rint | 6 38 42 45 46 53 57 69 76 80 85 109 122 133 137 390 410 477 快速直达专线94 夜7 夜22 专27 专138 专154 专191Script error: No such module "Check for unknown parameters". | 0.734 | 1.669 | |
| Template:Stl | Script error: No such module "Lang". | Template:Rint (Out-of-system interchange via Template:Stl)[6] | 5 6 19 38 40 50 57 76 78 109 133 381 676 快速直达专线86 快速直达专线154 夜7Script error: No such module "Check for unknown parameters". | 1.874 | 3.543 | |
| Template:Stl | Script error: No such module "Lang". | Template:Rint | 5 6 48 57 83 102 105 109 144 381 夜4 夜7 夜10 夜18 专13Script error: No such module "Check for unknown parameters". | 1.374 | 4.917 | |
| Template:Stl | Script error: No such module "Lang". | 5 6 7 14 15 23 34 48 57 66 102 105 夜7 夜10 夜18Script error: No such module "Check for unknown parameters". | 0.885 | 5.802 | ||
| Template:Stl | Script error: No such module "Lang". | Template:Rint | 2 5 23 48 57 59 66 93 120 141 622 观光1 夜2 夜7 夜10 夜17 夜18Script error: No such module "Check for unknown parameters". | 1.205 | 7.007 | Dongcheng / Xicheng |
| Template:Stl | Script error: No such module "Lang". | 23 57 137 夜7 夜10Script error: No such module "Check for unknown parameters". | 0.869 | 7.876 | Dongcheng | |
| Template:Stl | Script error: No such module "Lang". | Template:Rint | 17 23 39 41 43 57 60 84 106 116 128 137 599 夜7 夜10 夜24 夜28Script error: No such module "Check for unknown parameters". | 1.016 | 8.892 | |
| Template:Stl | Script error: No such module "Lang". | 8 12 23 57 快速直达专线6 夜7Script error: No such module "Check for unknown parameters". | 1.138 | 10.030 | ||
| Template:Stl | Script error: No such module "Lang". | 23 57 312 637 夜7 夜29 专87 专165Script error: No such module "Check for unknown parameters". | 1.332 | 11.362 | Dongcheng / Chaoyang | |
| Template:Stl | Script error: No such module "Lang". | Template:Rint | 23 28 54 57 72 98 300 300快 312 348 368 402 637 669 687 805快 848 938快 快速直达专线85 快速直达专线192 通医专线4 夜7 夜29 夜30 专10 专87 专165Script error: No such module "Check for unknown parameters". | 1.241 | 12.603 | Chaoyang |
| Template:Stl | Script error: No such module "Lang". | Template:Rint | 11 23 35 54 312 348 486 513 561 605 669 973 985 快速直达专线85 快速直达专线192 通医专线4 夜7 夜25 夜29 专87Script error: No such module "Check for unknown parameters". | 1.311 | 13.914 | |
| Template:Stl | Script error: No such module "Lang". | 11 23 31 35 138 312 348 400 400快 439 455 513 561 657 669 803 810快 865 快速直达专线85 快速直达专线174 快速直达专线192 夜29 夜34Script error: No such module "Check for unknown parameters". | 0.781 | 14.695 | ||
| Template:Stl | Script error: No such module "Lang". | 11 23 31 35 138 312 439 455 513 561 669 810快 快速直达专线85 快速直达专线174 快速直达专线192 夜29 专71Script error: No such module "Check for unknown parameters". | 0.865 | 15.560 | ||
| Template:Stl | Script error: No such module "Lang". | 561Script error: No such module "Check for unknown parameters". | 0.903 | 16.463 | ||
| Template:Stl | Script error: No such module "Lang". | 31 34 41 348 457 486 535 561 637 657 通医专线4 夜19 夜34Script error: No such module "Check for unknown parameters". | 1.464 | 17.927 | ||
| Template:Stl | Script error: No such module "Lang". | 31 41 561 通医专线4 夜34 专166Script error: No such module "Check for unknown parameters". | 0.906 | 18.833 | ||
| Template:Stl | Script error: No such module "Lang". | 348 457 486 561 637 夜19 专166Script error: No such module "Check for unknown parameters". | 1.679 | 20.512 | ||
| Template:Stl | Script error: No such module "Lang". | 348 457 486 561 637 夜19Script error: No such module "Check for unknown parameters". | 1.304 | 21.816 | ||
| Template:Stl | Script error: No such module "Lang". | 348 457 486 637 638 夜19Script error: No such module "Check for unknown parameters". | 1.021 | 22.837 | ||
| Template:Stl | Script error: No such module "Lang". | 348 457 专170Script error: No such module "Check for unknown parameters". | 1.678 | 24.515 | ||
| Template:Stl | Script error: No such module "Lang". | 411 657 专171Script error: No such module "Check for unknown parameters". | 1.752 | 26.267 | ||
| Template:Stl | Script error: No such module "Lang". | 397 532Script error: No such module "Check for unknown parameters". | 2.517 | 28.784 | ||
| Template:Stl | Script error: No such module "Lang". | 552 649 T11 T12 T15 T25 T68 T68区 T87Script error: No such module "Check for unknown parameters". | 2.961 | 31.745 | Tongzhou | |
| Template:Stl | Script error: No such module "Lang". | 342 372 566 913 T7 T10 T18 T65 T109 T116 T118 通医专线9Script error: No such module "Check for unknown parameters". | 2.110 | 33.855 | ||
| Template:Stl | Script error: No such module "Lang". | 435 T112Script error: No such module "Check for unknown parameters". | 1.160 | 35.015 | ||
| Template:Stl | Script error: No such module "Lang". | 589 T4 T53 T62 T68 T102 T112Script error: No such module "Check for unknown parameters". | 1.195 | 36.210 | ||
| Template:Stl | Script error: No such module "Lang". | Template:Rint | 589 806 T14 T34 T40 T43 T53 T68 T72 T73 T90 T101 T102 T116Script error: No such module "Check for unknown parameters". | 1.425 | 37.635 | |
| Template:Stl | Script error: No such module "Lang". | Template:Rint | 589 T116[7]Script error: No such module "Check for unknown parameters". | 1.769 | 39.404 | |
-
Huangchang Station
-
Qiaowan Station
-
Hufangqiao Station
-
Daguanying Station
Planning
Line 6 was originally conceived in 1973 as a "pan-handle" shaped route incorporating the central sections of today's Lines 6 and 7.[8] In 1983 Line 6 was dissolved into two distinct lines. The section under Guang'anmen, Luomashi, Zhushikou and Guangqumen Streets and the "handle" branch to Fengtai became Line 7. The rest of the loop with a new south eastern extension to what was at the time the Beijing Jiaohuachang (Coking Plant) complex became Line 6.[9] Line 7 was later revised westward to terminate at a new major railway station called Beijing West railway station and Line 9 taking over servicing Fengtai.[10] When Beijing West railway station started construction in the early 1990s space was set aside for a subway station allowing Cross-platform interchange for the future Lines 7 and 9.[11] By 1993 the planned section of Line 6 heading to Jiaohuachang was revised as an eastern extension of Line 7, forming the alignment built today.[12]
Line 7 was originally slated to have 15 stations, from the Beijing West railway station to Baiziwan.[13] A revised plan approved by the Planning Committee of the Beijing Municipal government called for 21 stations over Script error: No such module "convert".,[14] ending in Jiaohuachang.[15]
In 2013, planners revised the design of Line 7 from using the standard 6 car trains to 8 car trains after performing a detailed transport study of the Fatou area. Fatou's population projections were upgraded from 100,000 to 220,000 people and be a significant employment hub in the future. Planners decided that 6 cars trains would have insufficient capacity for the new demand projections. Line 7 was originally planned to use 1500 V DC overhead lines to power the longer subway trains. However, the already completed platforms at Beijing West railway station assumed the line would use a 750 V DC 3rd rail system like Beijing's legacy subway lines and built with vertical clearance for such. The line ultimately used a 1500 V DC 3rd rail system as a compromise.[1]
In 8 July 2022, an EIA document regarding Phase III construction of Beijing rail transport system (2022–2027) announced the Phase III of Line 7, from Beijing West Railway station to Wanshousi, it will be a 6.4 km long section with 4 new stations.[16] These are confirmed in the tender announcements published on 8 July 2024.[17][18][19]
History
Phase 1
Construction began in January 2010.[20] It started test runs in September 2014 with full operation beginning on December 28, 2014.[14]
Eastern extension (Phase 2)
The eastern extension runs through Chaoyang and Tongzhou Districts. The extension adds 9 new stations and Script error: No such module "convert".[21] of new line. The extension is fully underground. It was opened on December 28, 2019.[22] Template:Stl station opened on August 26, 2021.[23]
Timeline
- January 8, 2008: Plans for Line 7 reported in the media. Construction scheduled to begin by the end of the year.[13]
- October 30, 2008: Line 7 route plan with 23 stations receive regulatory approval. Construction still scheduled to begin by end of the year.[24]
- July 19, 2009: Construction on Line 7 announced to begin in late August 2009.[25]
- November 6, 2009: Commencement of Line 7 construction deferred to 2010.[20]
- January 19, 2010: Construction reportedly begun along Guangqu Road near the easternmost section of the line.[26]
- December 28, 2014: Operations of Phase I of Line 7 begin, except for Shuangjing station and Fatou station.
- December 30, 2018: An infill station of Phase I, Fatou station was opened.
- December 28, 2019: Operations of Phase II of Line 7 begin, except for Universal Resort station. An infill station of Phase I, Shuangjing station was opened.
- August 26, 2021: Extended to Universal Resort station.[23]
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| Beijing West Railway Station — Jiaohuachang | 28 December 2014 | Script error: No such module "convert".[27] | 19 | Phase 1 |
| Fatou | 30 December 2018 | infill station | 1 | |
| Shuangjing | 28 December 2019[22] | infill station | 1 | |
| Jiaohuachang — Huazhuang | Script error: No such module "convert".[21] | 8 | Phase 2 (Eastern extension) | |
| Huazhuang — Universal Resort | 26 August 2021[23] | 1 |
Rolling Stock
| Model | Image | Manufacturer | Year Built | Amount in Service | Fleet Numbers | Depot |
|---|---|---|---|---|---|---|
| BD32 | File:07 007 leaving Jiulongshan (20210208193009).jpg | Beijing Subway Rolling Stock Equipment | 2013 | 68 | 07 001–07 068 | Jiaohuachang Zhangjiawan |
References
<templatestyles src="Reflist/styles.css" />
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ (Chinese)"Line 7 Information Page" BII Template:Webarchive accessed Oct. 31, 2008
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "Citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b "Beijing Subway Line 7 and Line 14 will begin construction this year" People's Daily Online Jan. 8, 2008
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".Script error: No such module "Unsubst".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b (Chinese) 北京地铁“南北大动脉”2010底前打通 Nov. 6, 2009
- ↑ a b Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ a b c Script error: No such module "citation/CS1".
- ↑ (Chinese) "北京地铁7号线与14号线方案获批" 京华时报 Template:Webarchive Oct. 30, 2008
- ↑ (Chinese) Guo, Kun. "北京地铁7号线下个月开工" 京华时报 July 19, 2009
- ↑ (Chinese) “北京地铁7号线悄然开工 全长23.7公里工期4年” ‘’法制晚报’’ Template:Webarchive Jan. 19, 2010
- ↑ Script error: No such module "citation/CS1".
Script error: No such module "Check for unknown parameters".