Line 5 (Shanghai Metro)

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Template:Use dmy dates Template:Infobox rail line Line 5 is a north–south rapid transit line of the Shanghai Metro network, running from Template:Stl station in Minhang District in the north to Template:Stl in Fengxian District was originally planned as the Minhang and Fengxian sections of line 1 extending south to Minhang. Despite its numeric designation, it was the fourth Shanghai Metro line to enter passenger service, opening on 25 November 2003. The line is colored violet on system maps.

History

Line 5 was originally built under the direction of Minhang District and remains the only line in Shanghai Metro system that was originally built under the supervision of a county-level government.[1]

In 1998, Minhang District authorities signed a contract with Shanghai Jiushi Group to build the line.[2] In 2000, Shanghai Jiushi Group signed a contract between Alstom to purchase trains[2] and started its construction.[3] In 2002, Shanghai Modern Rail Transit Incorporated, a subsidiary of former Template:Ill, was given management of the line. The line entered passenger operations on 25 November 2003, on an initial segment between Template:Stl and Template:Stl stations, entirely within Minhang District.[4]

Prior to integration with the rest of the Shanghai Metro network, it used its own ticketing system. In 2005, it was integrated with Shanghai Metro's ticketing system, which enabled an in-station interchange to line 1 at Xinzhuang station. At the same time, management and operation of the line was taken over by Shanghai No. 1 Metro Operation Co. Ltd.[5]

Phase II extension and renovation

Phase two of the line, which would extend the line further south into Fengxian District, began construction on 30 July 2014. On 1 April 2015, a feasibility study for the extending of line 5 platforms, upgrading signals to support the use of higher-capacity six-car trains and renovation of tail tracks at Template:Stl was approved.[6] Due to these system upgrades, service on the existing line was cut back from Template:Stl station to Template:Stl on 20 August 2018. Full service was restored on 20 October 2018. At the same time, the line began to operate as two separate services, being split at Template:Stl station, due to the anticipated opening of the phase two extension of line 5, which would create two branches of the line. Six-car trains began to run on the service between Xinzhuang and Dongchuan Road station. Passengers wishing to travel the entire length of the line needed to interchange at Dongchuan Road station.[7][8]

On 30 December 2018, the extension from Dongchuan Road station to Template:Stl station opened, becoming the first Shanghai Metro line to provide access to Fengxian District. The extension crosses the Huangpu River using the Minpu Second Bridge, the first Shanghai Metro line which crosses the river by bridge. The total length of the extension is Template:Convert in length, with Template:Convert underground and the remainder being elevated.[9] As a result of the extension, the segment of line 5 between Dongchuan Road and Minhang Development Zone stations was designated as a branch service, while the main service ran from Xinzhuang to Fengxian Xincheng stations. The branch line was operated as a separate service from the main line, thus still necessitating a transfer at Dongchuan Road station. This was due to the fact that four-car trains ran on the branch service, while six-car trains ran on the main line. This arrangement ended on 26 December 2020, now service on the branch line continues straight through to Xinzhuang With four-car trains from the branch line and six-car trains from the mainline running in mixed operation in the joint section between Xinzhuang and Dongchuan Road stations. Additionally, the fare system of the line reverted to a pricing similar to other Shanghai Metro Lines.[10][11][12]

colspan="7" style="text-align: center" bgcolor=#Template:Rcr | Shanghai Metro Line 5 opening history
Segment Commencement Opened Length Station(s) Name Investment
Xinzhuang — Minhang Development Zone 28 Feb 1999 25 Nov 2003 Template:Convert 11 Initial phase ¥3.437 billion
Dongchuan Road — Fengxian Xincheng 30 Jun 2014 30 Dec 2018 Template:Convert 8 Southern extension (phase two) ¥10.619 billion

Controversy

During the trial operation of the southern extension section Shanghai Metro received complaints from residents of Pujiang Building on noise.[13] In order to effectively control the impact of the noise caused by the train operation, on the premise of not affecting the overall capacity of line 5, a speed limit of Template:Cvt was implemented between Template:Stl Station and Template:Stl Station.[14]

Stations

Script error: No such module "labelled list hatnote".

Service routes

colspan="11" style="text-align: center" bgcolor=#Template:Rcr | Shanghai Metro Line 5 service routes
Routes Station name Connections Distance Location Open-
ing
Plat-
form[15]
M P EnglishScript error: No such module "Check for unknown parameters". ChineseScript error: No such module "Check for unknown parameters". kmScript error: No such module "Check for unknown parameters". minScript error: No such module "Check for unknown parameters".
colspan="11" style=background:#Template:Rcr|Mainline
Template:Stl Template:Large Template:Rint Template:Rint Template:Rint XZHTemplate:Efn-lr 0.00 0.00 0 Minhang 25 Nov 2003[16] At-grade Side
Template:Stl Template:Large 1.58 1.58 3 Elevated Side
Template:Stl Template:Large 1.08 2.66 5
Template:Stl Template:Large 2.70 5.36 9
Template:Stl Template:Large 2.55 7.91 12
Template:Stl Template:Large 2.17 10.08 16
Template:Stl Template:Large 0.97 11.05 18 Elevated Double Island
colspan=11 style=background:#Template:Rcr|Branchline
Template:Stl Template:Large 1.47 12.52 20 Minhang 25 Nov 2003[16] Elevated Side
Template:Stl Template:Large 1.48 14.00 23
Template:Stl Template:Large 1.45 15.45 25
Template:Stl Template:Large 1.10 16.55 28
colspan=11 style=background:#Template:Rcr|Mainline
Template:Stl Template:Large 1.50 18.05 22 Minhang 30 Dec 2018[17] Elevated Side
Template:Stl Template:Large 2.04 20.09 28 Fengxian
Template:Stl Template:Large 2.69 22.78 32
Template:Stl Template:Large 2.99 25.77 35 Elevated Island
Template:Stl Template:Large 2.28 28.05 38 Underground Island
Template:Stl Template:Large 1.85 29.90 41
Template:Stl Template:Large 1.35 31.25 43
Template:Stl Template:Large 1.48 32.73 45
Template:StlTemplate:Efn-lr Template:Large 3.06 35.79
Template:Notelist-lr


Important stations

Future expansion

There is currently a reserved and unopened station on the phase two extension of the line, which would be named Template:Stl station, located south of the current terminus at Fengxian Xincheng station. A further expansion of the second phase may see the line extended further south via Nanqiao town, Zhelin town to Haiwan town.[18]

The branch line between Dongchuan Road and Minhang Development Zone stations is expected to be replaced by Line 23, entirely underground, running to Shanghai Indoor Stadium station.[19][20] Line 23 is expected to extend west from Template:Stl to Chedun on the Jinshan line.

A north extension was planned to Template:Stl. Plans have been abandoned as this extension is now part of the under construction Jiamin line.

Headways

colspan="5" style="text-align: center" bgcolor=#Template:Rcr | Shanghai Metro Line 5 headway[21]
Time Template:Stl - Template:Stl Template:Stl - Template:Stl Template:Stl - Template:Stl
Monday-Friday (Working days)[22]
AM peak 7:00-9:30 About 2 min and 30 sec About 3 min and 45 sec About 7 min and 30 sec
Off-peak 9:30-17:00 About 4 min and 30 sec About 9 min About 9 min
PM peak 17:00-20:00 About 3 min About 4 min and 30 sec About 9 min
Other
hours
Before 7:00
After 20:00
About 7 min and 30 sec - 10 min
Saturday-Sunday (Weekends)
Peak 7:00-20:00 About 4 min About 8 min About 8 min
Other
hours
Before 7:00
After 20:00
About 7 min and 30 sec - 10 min

Technology

Signalling

Between 2014 and 2018 the signalling system of line 5 has been updated from the Siemens ZUB 200 to Thales SEC Transport TSTCBTC®2.0 (also deployed on Line 14). It is a unique dual CBTC system that features full redundancy and allows higher level of availability. This is China's first metro line that was deployed with a dual CBTC system.[23]

Shanghai Metro line 5 is China's first metro line where operation, renovation and construction were fulfilled at the same time. The project consisted of resignaling and expanding platforms of the existing section and adding a new south extension. To ensure no interruption to normal service, all the resignalling and commissioning was conducted in only a few hours during the night. Both before and after the commissioning, a switchover was made between the old and the new signaling system to ensure normal operation on the next day. After over 500 days, and more than 1,000 switchovers, line 5 had a seamless cutover to the new signalling system with no interruption to normal service at the end of 2018. [24]

Rolling Stock

In 2017, Alstom has modernised 68 metro cars (05C01) in service on the Shanghai metro line 5 and to supplied traction and train control management systems for 198 new metro cars due to circulate on the existing line and its extension for 46 million euros. Alstom had modernised the 68 metro cars that it supplied in 2003 with its Chinese joint venture SATCO (Shanghai Alstom Transport Co. Ltd.). The modernisation will increase the reliability of the cars and adapt them to a new signalling system that will be implemented on the line. Alstom supplied traction systems for 198 new cars that have been ordered for the line and its extension. All traction drives were manufactured by Alstom's joint venture SATEE (Shanghai Alstom Transport Electrical Equipment Co. Ltd.).[25]

The designed speed of the train is 80 km/h, the length (Class A carriages are longer at 23 meters) is 19.49 meters (Tc)/19.44 meters (Mp, M), and the width (Class A carriages are wider at 3.0 meters) is 2.6 meters. It is a VVVF AC drive and has a design life of 30 years. 05C01 stocks has 4 carriages with 172 seats which could accommodate 1170 people (compared to a six carriage Class A car which can accommodate 1860 people which is 60% higher than a four carriage Class C car). Despite using Class C cars, there are no reports of overcrowding on Line 5 due to the low ridership.

colspan="9" style="text-align: center" bgcolor="#Template:Rcr" | Shanghai Metro Line 5 rolling stock
Fleet numbers Manufacturer Time of
manufac-
turing
Class No
of
car
AssemblyTemplate:Efn-lr Rolling stock Number Notes
68 SATCOTemplate:Efn-lr 2002-2004 CTemplate:Efn-lr 4 Tc+Mp+Mp+Tc 05C01 501-513 and 515-518
(02011-02041, 03011-03401 and 04011-04241.)
Original name: AC11.
Used on the branchline.
Only sets without gangway connection between the carriages.
198 CRRC Changchun Railway Vehicles Co., Ltd. 2017-2019 CTemplate:Efn-lr 6 Tc+Mp+M+M+Mp+Tc 05C02 0519-0551
(050691-052661)
Used on the mainline.
Template:Notelist-lr

References

Template:Reflist

Template:Shanghai Metro lines Script error: No such module "navbox".

  1. Script error: No such module "Citation/CS1".
  2. a b Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. The noise of the extension of line 5 in the Pujiang Building is seriously exceeding the standard.
  14. After the opening of the extension section of Line 5, local sections will operate at speed limits.
  15. Script error: No such module "citation/CS1". Instructions: Script error: No such module "Lang".
  16. a b Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. Shanghai Rail Transit Line 5 will set up a total of 12 stations across the Yangtze River to the Fengxian extension section (originally published in "Youth Daily").
  19. Script error: No such module "citation/CS1".
  20. Script error: No such module "citation/CS1".
  21. Script error: No such module "citation/CS1".
  22. Script error: No such module "citation/CS1".
  23. Thales SEC Transport Awarded New Signalling Contract for Zhengzhou Metro Line 6
  24. Shanghai Metro Line 5 goes smoothly into full line service thanks to TST, Thales JV in China
  25. Alstom to modernise trainsets on Shanghai metro line 5 /