File:Tank construction 1966.jpg
Jump to navigation
Jump to search
No file by this name exists.
Summary
The tank for the first of four 570MVA generator-transformers for the CEGB's Ratcliffe-on-Soar station. The upper section is of aluminium, the base of steel. 8th December 1966.
Licensing
Script error: No such module "Unsubst".
Script error: No such module "Unsubst".
File usage
The following page uses this file: