Downtown MRT line

From Wikipedia, the free encyclopedia
(Redirected from Downtown Line)
Jump to navigation Jump to search

Template:Short description Script error: No such module "Distinguish". Script error: No such module "Unsubst". Script error: No such module "infobox".Script error: No such module "Check for unknown parameters". Template:Maplink

The Downtown Line (DTL) is a medium-capacity Mass Rapid Transit (MRT) line in Singapore. It runs from Bukit Panjang station in the north-west of the country towards Expo station in the east via a loop around the city-centre. Coloured blue on the rail map, the line serves 35 stations, all of which are underground.[1] The DTL is the fifth MRT line on the network to be opened and the third line to be entirely underground. It is the second MRT line to be operated by ComfortDelGro's SBS Transit after the North East Line. It also serves as an alternative to the East–West Line where it runs roughly geographically parallel from Bugis to Expo station.

Originally planned as three separate lines, the lines merged into the Downtown Line in 2007 and construction began in three stages. Stage 1, from Bugis to Chinatown stationsTemplate:Efn opened in December 2013, followed by Stage 2 from Bukit Panjang to Rochor stationsTemplate:Efn opening in December 2015. The third and final stage, from Fort Canning to Expo stations,Template:Efn opened in October 2017. At Script error: No such module "convert"., the DTL is the longest underground and automated rapid transit line in Singapore as of 2017Script error: No such module "Check for unknown parameters"..[2] It utilises the Bombardier Movia C951 electric multiple unit (EMU) and runs in a three-car formation.

The line is set to have new stations and extensions in the 2020s and 2030s. An infill station initially constructed as part of Stage 2, Hume, began operations in February 2025.[3] Stage 3e, a two-station extension consisting of Xilin and Sungei Bedok, is under construction and is scheduled to begin operations from the second half of 2026.[4] By 2H 2026, it will be about Script error: No such module "convert". long with 37 stations, and will serve more than half a million commuters daily.[5] A two-station extension to connect with the North South Line at Sungei Kadut is also being planned and set to open in 2035.[6]

History

Background and inception

At the official opening of the Dover station on 23 October 2001, then-Minister for Communications and Information Technology Yeo Cheow Tong announced three MRT lines, two of which―the Bukit Timah Line and the northern part of the Eastern Region Line―are part of today's DTL. The Bukit Timah Line aimed to alleviate the traffic problems along the Bukit Timah and Dunearn Road corridor, and provide a direct link to the city area for residents in Choa Chu Kang and Bukit Panjang. The proposed Eastern Region Line, slated to be a loop in the eastern regions, aimed to relieve the passenger load on the often-congested East–West Line and benefiting those living in Tampines, Bedok and Marine Parade.[7]Template:Rp[8][9]

On 14 June 2005, the Land Transport Authority (LTA) announced the Downtown Extension (renamed to "Downtown Line Stage 1"), which would serve the New Downtown at Marina Bay area, where an integrated resort (Marina Bay Sands) and Singapore's second botanical garden (Gardens by the Bay) were to be located. The Script error: No such module "convert". extension, estimated to cost S$1.4 billion, was initially announced to be part of the Circle line.[10] On 27 April 2007, then Transport Minister Raymond Lim announced that the Downtown Line would be built in three stages stretching Script error: No such module "convert". with 33 stations.[11][12][13][14]

Construction and opening

File:Construction of the Downtown Line opposite Clarke Quay, Singapore - 20121006-01.jpg
The construction of DTL tunnels near Clarke Quay. The diversion of the Singapore River for construction works for the tunnels between the Chinatown and Fort Canning stations was considered an engineering feat at the time.[15][16][17]
File:Exit D TAM.jpg
A separate entrance for the DTL platforms for Tampines MRT station, which is not directly connected to the EWL platforms of the station.

The line was built in 3 stages: Stage 1 of the Downtown line, stretching Script error: No such module "convert"., started construction in January 2008 at Chinatown station,[7]Template:Rp where platform provisions were built to facilitate an interchange station during the construction of the North East line. It began service on 22 December 2013,[18] with its official inauguration made on the day before by Prime Minister Lee Hsien Loong.[19]

Stage 2, first conceptualized and announced as the Bukit Timah line on 23 October 2001, is Script error: No such module "convert". long with 12 stations connecting Bukit Panjang and Rochor stations, including four interchange stations. Construction for Stage 2 began on 3 July 2009 with a groundbreaking ceremony at Beauty World station.[20][21] The line inaugurated on 27 December 2015, with free travel for all 18 stations from 27 December 2015 to 1 January 2016.[22][23][24]

Stage 3 goes from Chinatown to Expo. The station locations and finalised route were unveiled on 20 August 2010.[25][26] Stage 3 of the Downtown line is Script error: No such module "convert". long and serve 16 stations.[2][27] The route opened on 21 October 2017,[28] with free travel for all DTL stations on the first two days of the line completion.[29][30]

The line, with an estimated cost of S$12 billion, was considered the government's most ambitious rail project. The cost exceeded those of the Circle Line (at $6.7 billion) and the North East Line (at $4.6 billion). Final costs of building the line may reach an estimated about S$20.7 billion, up more than 70% from the initial estimation, due to sharp rises in construction costs and a number of changes in plans.[31][7]Template:Rp

In October 2014, it was announced that Stage 2's opening would be pushed back to the first quarter of 2016. This was because one of the main contractors for the DTL2, Alpine Bau (which was building King Albert Park, Sixth Avenue and Tan Kah Kee), went bankrupt in mid-2013.[32] On 28 June 2015, Transport Minister Lui Tuck Yew announced that the delay was "completely resolved" by the authorities and Stage 2's opening date was brought forward to 27 December 2015.[33][34] The DTL 3 started operations on 21 October 2017, officially opened by Transport Minister Khaw Boon Wan.[35][36][37]

To serve the line, the Gali Batu Depot was opened in December 2015 to stable 42 trains. It is situated at part of the former Kwong Hou Sua Teochew Cemetery off Woodlands Road.[38] Also in February that year, the Land Transport Authority announced that the capacity of the depot will be expanded to stable 81 trains by 2019.[39]

On 7 March 2019, Hume station was announced to be opened by the second quarter of 2025 to better serve Hillview residents.[3][40] The station was opened on 28 February 2025, ahead of the original timeline.

Future

On 17 January 2013, plans were announced for a southern extension extending from Expo to connect with the Eastern Region line (ERL); the ERL has since been subsumed into the Thomson-East Coast line. The extension was to provide more travel options and enhance connectivity for the residents along the East Coast.[41][42] The Downtown Line 3 extension (DTL3e) was finalised and announced on 15 August 2014, in conjunction with the announcement of the Thomson–East Coast line.[43] Two stations, Xilin MRT station and Sungei Bedok MRT station, will be added to the Downtown Line, with Sungei Bedok as an interchange station with the Thomson–East Coast line. It will lengthen the line by Script error: No such module "convert"..[43] Expected to be completed in the second half of 2026, Stage 3e will connect the current East–West Line at Expo station and the future TEL at Sungei Bedok station.[44]

An additional extension to the Downtown Line to Sungei Kadut station from Bukit Panjang station was announced on 25 May 2019 by the LTA. The extension is set to cut down travel time to the downtown area by up to 30 minutes for those living in the northwestern area of Singapore. The extension is expected to be completed by the mid-2030s. A study will also be conducted to determine the stops to be added between the Sungei Kadut and the existing Bukit Panjang stations.[6]

On 6 December 2024, it was announced that Stage 3e will commence operation in the second half of 2026.[45]

On 6 January 2025, a Script error: No such module "convert". extension to the future Sungei Kadut station was announced, including an additional unnamed station between Sungei Kadut station and Bukit Panjang station, slated to begin operation in 2035.[46][47]

Notable incidents

A fire occurred on a maintenance locomotive which was carrying out works at Mattar station on 24 May 2024 at around 1:00 am. This resulted in the section between Fort Canning and Mattar stations to be closed as the locomotive could not be moved until heat from its body dissipated. The fire was put out by SCDF and one staff member was conveyed to the hospital for smoke inhalation. Train services at the affected MRT stations resumed at 7:26 am after more than an hour since the start of train service.[48]

Network and operations

Route

File:MRT Route Map DT.svg
Geographically accurate map of the Downtown MRT line.[49]

The Downtown line generally goes in an east–west direction from Bukit Panjang in the northwestern side of Singapore, through the downtown area of Singapore, to Tampines and the Singapore Expo in the east. It is Script error: No such module "convert". long and is entirely underground. Before Bukit Panjang station, there exists a brief northwards extension to the line's depot Gali Batu Depot. The line begins at the Bukit Panjang station and then goes in the southeast direction, running parallel to Upper Bukit Timah Road and along the Bukit Timah Canal through Bukit Timah. The line then enters the central area, passing through Little India station before reaching the Central Business District via Bugis station. The Downtown line runs parallel to the Circle line at the Promenade and Bayfront stations. Passing through the Downtown Core, the line interchanges with the North East line at Chinatown station.

After Chinatown station, the line goes in a northeast direction and under the Singapore River. Between the Bencoolen and Jalan Besar stations, the line intersects itself, the first MRT line to do so. After Geylang Bahru station, the line continues in a general eastwards direction, through the industrial areas of Kampong Ubi and Kaki Bukit (briefly paralleling Ubi Avenue 2 and Kaki Bukit Avenue 1), before continuing towards the Tampines Regional Centre and goes southwards, ending at Changi Business Park. The DTL3 extension (DTL3e) from Expo station will extend the line further towards the Thomson–East Coast line at Sungei Bedok station.[50]

Stations

Station codes for the line are blue, corresponding to the line's colour on the system map. Most stations have island platforms, with the exception of Downtown, Telok Ayer, Chinatown and MacPherson stations having side platforms whilst Stevens and Promenade stations having stacked side platforms.Script error: No such module "Multiple image".

Downtown Line stations timeline
Date Project Description
22 December 2013 Stage 1 BugisChinatown
27 December 2015 Stage 2 BugisBukit Panjang
21 October 2017 Stage 3 Fort CanningExpo
28 February 2025 Hume infill station Hume between Hillview and Beauty World
2H 2026 Stage 3 Extension ExpoSungei Bedok
2035 Stage 2 Extension DE1Sungei Kadut

Legend

File:Aiga escalator up.svg
Elevated
File:MRT Singapore Destination 1.svg File:MRT Singapore Destination 14.svg
Line terminus
File:Barrier turnstile icon.svg
Transfer outside paid area
File:Aiga escalator.svg
Ground-level
File:MUTCD D9-6.svg
Wheelchair accessible
File:Bus-logo.svg
Bus interchange
File:Aiga escalator down.svg
Underground
File:ISO 7010 W003.svg
Civil Defence Shelter
File:Aiga carrental cropped.svg File:BSicon Mono-CHN.svg File:BSicon AETRAM.svg File:Aiga watertransportation.svg File:20 airtransportation.svg File:Aiga immigration.svg
Other transportation modes

List

scope="col" style="color: white; background:#Template:Rcr" | Station code scope="col" style="color: white; background:#Template:Rcr" | Station name scope="col" style="color: white; background:#Template:Rcr" | Images scope="col" style="color: white; background:#Template:Rcr" | Interchange;
Adjacent transportation
scope="col" style="color: white; background:#Template:Rcr" | Opening scope="col" style="color: white; background:#Template:Rcr" | Cost
File:MRT Singapore Destination 11.svg
Template:SMRT codeTemplate:SLRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Bukit Panjang File:DT1 Bukit Panjang MRT Platforms 20220503 130818.jpg File:Aiga escalator up.svg Template:Rbox File:Barrier turnstile icon.svg

File:Bus-logo.svg Bukit Panjang
27 December 2015;
Template:Years or months ago
S$452.4 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Cashew File:DT2 Cashew Feb 2020.jpg rowspan="3" Template:Sdash S$431 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Hillview File:DT3 Hillview Sep 2020.jpg
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Hume File:(SGP-Singapore) Hume MRT Station Platforms 2025-02-28 - 3.jpg 28 February 2025;
Template:Years or months ago
S$259.538 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Beauty World File:DT5 Beauty World MRT Platforms 20210118 134028.jpg File:Bus-logo.svg Beauty World (late-2020s) 27 December 2015;
Template:Years or months ago
S$339.88 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
King Albert Park File:DT6 King Albert Park Platform B.jpg File:Aiga escalator down.svg Template:Rbox (2032) S$574.7 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Sixth Avenue File:DT7 Sixth Avenue Platform level.jpg rowspan="2" Template:Sdash
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Tan Kah Kee File:DT8 Tan Kah Kee MRT Platforms 20210118 144732.jpg S$572 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Botanic Gardens File:DT9 Botanic Gardens MRT Platforms 20201011 164633.jpg File:Aiga escalator down.svg Template:Rbox S$378.2 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Stevens File:(SGP-Singapore) Stevens MRT Station Platform B 2025-02-28.jpg File:Aiga escalator down.svg Template:Rbox 
Template:SMRT codeTemplate:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Newton File:DT11 Newton MRT platforms 20201209 134913.jpg File:Aiga escalator down.svg Template:Rbox File:Barrier turnstile icon.svg S$356 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Little India File:2016-04-03 Little India MRT Station 05.jpg File:Aiga escalator down.svg Template:Rbox S$803.3 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Rochor File:DT13 Rochor MRT platforms 20211229 105710.jpg Template:Sdash
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Bugis File:DT14 Bugis Platform B with escalator.jpg File:Aiga escalator down.svg Template:Rbox 22 December 2013;
Template:Years or months ago
S$582 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Promenade File:DT15 Promenade MRT Platform C 20200902 142627.jpg File:Aiga escalator down.svg Template:Rbox 

File:Bus-logo.svg Marina Centre
S$231 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Bayfront File:DT16 Bayfront MRT Platform A 20201201 151306.jpg File:Aiga escalator down.svg Template:Rbox S$463 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Downtown File:DT17 Downtown MRT Platform B 20201201 160246.jpg rowspan="2" Template:Sdash S$230.3 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Telok Ayer File:DT18 Telok Ayer MRT Platform A 20210310 153836.jpg S$224.9 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Chinatown File:DT19 Chinatown MRT Platform C 20201017 150017.jpg File:Aiga escalator down.svg Template:Rbox S$160.3 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Fort Canning File:DT20 Fort Canning station.jpg rowspan="6" Template:Sdash 21 October 2017;
Template:Years or months ago
S$255.05 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Bencoolen File:DT21 Bencoolen station.jpg S$177.58 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Jalan Besar File:DT22 Jalan Besar station.jpg S$171.46 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Bendemeer File:DT23 Bendemeer station.jpg S$215.24 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Geylang Bahru File:DT24 Geylang Bahru Platform.jpg S$123 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Mattar File:DT25 Mattar station.jpg S$199.85 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
MacPherson File:DT26 MacPherson station Platform C 20200911 171940.jpg File:Aiga escalator down.svg Template:Rbox S$188 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Ubi File:DT27 Ubi station.jpg rowspan="5" Template:Sdash S$161.71 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Kaki Bukit File:DT28 Kaki Bukit station.jpg S$93.8 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Bedok North File:DT29 Bedok North station.jpg S$480.38 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Bedok Reservoir File:DT30 Bedok Reservoir station.jpg S$196.46 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Tampines West File:DT31 Tampines West station.jpg S$226.92 millionTemplate:Efn
Template:SMRT codeTemplate:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Tampines File:DT32 Tampines MRT Platform A 20200919 171156.jpg File:Aiga escalator up.svg Template:Rbox File:Barrier turnstile icon.svg

File:Bus-logo.svg Tampines
File:Bus-logo.svg Tampines Concourse
S$118.5 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Tampines East File:DT33 Tampines East station.jpg rowspan="2" Template:Sdash S$208.52 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Upper Changi File:DT34 Upper Changi station.jpg S$256.98 millionTemplate:Efn
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Expo File:DT35 Expo station.jpg File:Aiga escalator up.svg Template:Rbox (until 2040)
File:Aiga escalator up.svg Template:Rbox (after 2040)
S$211.35 millionTemplate:Efn
Stage 3 Extension (under construction, to be ready by 2H 2026)
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Xilin File:DT36 Xilin MRT station construction 20210410 172220.jpg Template:Sdash 2H 2026 S$833.6 millionTemplate:Efn
File:MRT Singapore Destination 12.svg File:MRT Singapore Destination 14.svg
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg File:ISO 7010 W003.svg
Sungei Bedok File:DT37 TE31 Sungei Bedok under construction 20201114 190055.jpg File:Aiga escalator down.svg Template:Rbox (2026) S$418 millionTemplate:Efn
Stage 2 Extension (under planning, to be ready by 2035)
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
DE1 Template:CNone Template:Sdash 2035;
Template:Years or months ago
TBA
Template:SMRT code
File:Aiga escalator down.svg File:MUTCD D9-6.svg
Sungei Kadut Template:CNone File:Aiga escalator up.svg Template:Rbox (2035)

Depots

scope="col" style="color: white; background:#Template:Rcr" | Number scope="col" style="color: white; background:#Template:Rcr" | Depot name;
Lines
scope="col" style="color: white; background:#Template:Rcr" | Location scope="col" style="color: white; background:#Template:Rcr" | Images scope="col" style="color: white; background:#Template:Rcr" | Line-specific
stabling capacity
scope="col" style="color: white; background:#Template:Rcr" | Cost scope="col" style="color: white; background:#Template:Rcr" | Opening
1
Script error: No such module "Check for unknown parameters".
Template:Rbox Sungei Kadut File:DTL Gali Batu MRT Depot (1).jpg 81 trains S$410 million 27 December 2015;
Template:Years or months ago
2
Script error: No such module "Check for unknown parameters".
Template:Rbox Hougang Template:CNone 18 trains S$81.5 million 21 October 2017;
Template:Years or months ago
3
Script error: No such module "Check for unknown parameters".
Template:Rbox
Template:Rint
Template:Rint
Changi Template:CNone 66 trains S$1.99 billion[51][52][53] 2H 2026

Rolling stock

File:DTL Gali Batu MRT Depot (1).jpg
Gali Batu Depot which houses the Bombardier MOVIA C951(A) trains.

As of 2011Script error: No such module "Check for unknown parameters"., the Downtown line has one type of rolling stock, the Bombardier MOVIA C951(A) cars,[54] running in a three-car formation. They have been stabled at Gali Batu Depot since it opened with Stage 2 of the downtown line on 27 December 2015. For the period between the opening of Stage 1 and that of Stage 2, trains were stabled at a maintenance facility that was built at Marina Bay as part of the Circle line project. Kim Chuan Depot housed the Operations Control Centre for the Downtown Line Stage 1 until Gali Batu Depot was ready.[55]

On 12 October 2012, the first of 11 trains for the line arrived at Jurong Port. It was transported to Kim Chuan Depot to undergo testing by the LTA before it was handed over to SBS Transit.[56] As of 28 February 2013Script error: No such module "Check for unknown parameters"., Bombardier had delivered five of the 11 trains for Downtown line stage 1.[57] LTA together with the operator, SBS Transit, conducted the necessary tests to ensure safety standards, functional performance and systems compatibility requirements were met before revenue service began on 22 December 2013.[58]

Testing for Stage 2 began on 25 October 2015 and rolling stock that was delivered to Gali Batu Depot commenced service in Stage 1 on 21 October 2015, while SBS Transit slowly moved the equipment managing the DTL trains to Gali Batu Depot during non-revenue hours.[7] Kim Chuan Depot, together with the adjacent Tai Seng Facility Building, operated in a minor capacity until Stage 3 opened. A new depot, named the East Coast Integrated Depot, is planned to provide additional stabling capacity to the line in the second half of 2026.[59] Testing on the integration of systems of Stage 3 and the rest of the line started from 14 May 2017 till 27 August 2017.[60]

Train control

The Downtown line is equipped with Siemens (previously Invensys before Siemens acquisition) Trainguard Sirius Communications-based train control (CBTC) moving block signalling system with Automatic train control (ATC) under Automatic train operation (ATO) GoA 4 (UTO).[61] The subsystems consist of Automatic train protection (ATP) to govern train speed, Controlguide Rail 9000 Automatic Train Supervision (ATS) to track and schedule trains and Trackguard Westrace MK2 Computer-based interlocking (CBI) system that prevents incorrect signal and track points to be set.[62][63]

A fall-back signalling system, relying on conventional track-circuit occupancy detection, is included to ensure fully automatic operation and train protection independent of the radio system.

Platform screen doors (PSDs) along the line were installed by Westinghouse Signal (Invensys Rail Group), supplied by Faiveley.[64] The PSDs provide safety for passengers, offering protection from arriving and departing trains.[65][66]

Notes

Template:Notelist

<templatestyles src="Reflist/styles.css" />

Script error: No such module "Check for unknown parameters".

References

<templatestyles src="Reflist/styles.css" />

  1. Cite error: Script error: No such module "Namespace detect".Script error: No such module "Namespace detect".
  2. a b Script error: No such module "citation/CS1".
  3. a b Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. a b Script error: No such module "citation/CS1".
  7. a b c d Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. Script error: No such module "citation/CS1".
  19. Script error: No such module "citation/CS1".
  20. Script error: No such module "citation/CS1".
  21. Script error: No such module "citation/CS1".
  22. Script error: No such module "citation/CS1".
  23. Script error: No such module "citation/CS1".
  24. Script error: No such module "citation/CS1".
  25. Script error: No such module "citation/CS1".
  26. Script error: No such module "citation/CS1".
  27. Script error: No such module "citation/CS1".
  28. Script error: No such module "citation/CS1".
  29. Script error: No such module "citation/CS1".
  30. Script error: No such module "citation/CS1".
  31. Script error: No such module "citation/CS1".
  32. Script error: No such module "citation/CS1".
  33. Script error: No such module "citation/CS1".
  34. Script error: No such module "citation/CS1".
  35. Script error: No such module "citation/CS1".
  36. Script error: No such module "citation/CS1".
  37. Script error: No such module "citation/CS1".
  38. Script error: No such module "citation/CS1".
  39. Script error: No such module "citation/CS1".
  40. Script error: No such module "citation/CS1".
  41. Script error: No such module "citation/CS1".
  42. Script error: No such module "citation/CS1".
  43. a b Script error: No such module "citation/CS1".
  44. Script error: No such module "citation/CS1".
  45. Script error: No such module "citation/CS1".
  46. Script error: No such module "Citation/CS1".
  47. Script error: No such module "citation/CS1".
  48. Script error: No such module "citation/CS1".
  49. Script error: No such module "citation/CS1".
  50. Script error: No such module "citation/CS1".
  51. Script error: No such module "citation/CS1".
  52. Script error: No such module "citation/CS1".
  53. Script error: No such module "citation/CS1".
  54. Script error: No such module "citation/CS1".
  55. Script error: No such module "citation/CS1".
  56. Script error: No such module "citation/CS1".
  57. Script error: No such module "citation/CS1".
  58. Script error: No such module "citation/CS1".
  59. Script error: No such module "citation/CS1".
  60. Script error: No such module "citation/CS1".
  61. Script error: No such module "citation/CS1".
  62. Script error: No such module "citation/CS1".
  63. Script error: No such module "citation/CS1".
  64. Script error: No such module "citation/CS1".
  65. Script error: No such module "citation/CS1".
  66. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Script error: No such module "Side box".

Script error: No such module "Navbox". Script error: No such module "Navbox". Script error: No such module "Navbox". Template:Urban Rail Transit in ASEAN