D12 road (Croatia)

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search

Template:Short description Script error: No such module "Unsubst". The D12 (Template:Langx) is a partially built state road in central Croatia that is intended to connect the Vrbovec 2 interchange (with D10) with Bjelovar, Virovitica and end at the border crossing Terezino Polje (with Hungary). Its planned length is Script error: No such module "convert"..[1]

Planned upgrade to motorway

Script error: No such module "Infobox".Script error: No such module "Infobox road/errors".Script error: No such module "Check for unknown parameters".[[Category:Infobox road instances Template:Infobox road/meta/mask/category]]

The A13 motorway (Template:Langx) was a planned motorway, expected to be built in the central Croatia northeast from Vrbovec, extending towards the cities of Bjelovar and Virovitica. As of May 2012, only the Vrbovec 2 interchange, the starting (western) terminus of the A13 has been completed. The route was planned to be built as a six lane motorway and extended northeast to Bjelovar, Virovitica and Terezino Polje border crossing[2] to Hungary.[3][4]

The A13 motorway represented the eastern arm of the so-called Podravina Y, as the western arm is the partially constructed A12 motorway. The A13 was planned to branch off from the A12 at the Vrbovec 2 interchange, which is largely completed, although it may not be used by motorists driving on the A12 as that exit is currently blocked.[5] Construction of the motorway was cancelled in June 2012.

Planned construction

The A13 motorway, Script error: No such module "convert". long overall, was initially planned to comprise four sections: Script error: No such module "convert". Vrbovec 2 – Bjelovar, Script error: No such module "convert". Bjelovar – Bedenik, Script error: No such module "convert". Bedenik – Virovitica and Script error: No such module "convert". Virovitica – Terezino Polje sections.

The first construction stage was scheduled to include the section between the existing Vrbovec 2 interchange and Bjelovar, where the motorway would default to the D43 state road. Four interchanges, apart from the Vrbovec 2, were planned on that section: Kapela and Farkaševac interchanges to the Ž3041 (to Haganj) and Ž2231 (to Kenđelovec and Farkaševac) county roads respectively, Gudovac to the D28 state road to the western parts of Bjelovar and Bjelovar interchange to the D43 state road and the northern and the eastern parts of the city.[6] The works related to the first part of the route were officially announced in 2009,[7] however no construction took place for more than a year, causing delay of planned completion of the motorway until 2013.[8]

On 16 April 2019 the first part between the Vrbovec 2 interchange and Farkaševac was opened.[9]

Criticism and cancellation

The A13 had been formally announced in May 2009, but actual project planning, issuing of permits and construction works were delayed and postponed to an undetermined date, drawing criticism of the project as a pre-election stunt for the local elections of 2009.[10][11][12] On 2 May 2012, management of Hrvatske autoceste announced cancellation of construction of the motorway, pending approval of its supervisory board. The company reported that funding was never secured for construction of the route, while declining to comment on possible payment of damages to contractors.[13] By May 2012, Strabag, a motorway contractor, demanded 30 million kuna (c.Script error: No such module "Check for unknown parameters". 4 million euro) in damages because of delay of construction, but the request was declined by Hrvatske autoceste citing failure of Strabag to fulfill its contractual obligations.[14][15] On 20 June 2012, the Government of Croatia cancelled construction of the motorway.[16]

Exit list

Template:RJL

County km Exit Name[17] Destination[18] Notes
Zagreb County 0.0 1 Vrbovec 2 Script error: No such module "Jct". Connection to the D10 and the rest of the.
The western terminus of the expressway.
10.6 2 Farkaševac Script error: No such module "Jct". Connection to Kenđelovec and Farkaševac.
Bjelovar-Bilogora Parking area traffic sign Bjelovar rest area
3 Gudovac - Connection to planned Veliko Korenovo business zone; under construction
27.5 4 Bjelovar Script error: No such module "Jct". Connection to Bjelovar; under construction.
The eastern terminus of the first section of the A13.
5 Bulinac Script error: No such module "Jct". Connection to Bulinac and Nova Rača
Parking area traffic sign Bedenik rest area
6 Velika Pisanica Connection to Velika Pisanica
Virovitica-Podravina Parking area traffic sign Bilogora rest area
7 Špišić Bukovica Connection to Špišić Bukovica; under construction
73.0 8 Virovitica Script error: No such module "Jct".
Script error: No such module "Jct".
Script error: No such module "Jct".
Connection to Virovitica.
The eastern terminus of the expressway; under construction

Script error: No such module "Jctbtm".

Sources

<templatestyles src="Reflist/styles.css" />
  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. Script error: No such module "citation/CS1".
Script error: No such module "Check for unknown parameters".

Template:State roads in Croatia Script error: No such module "Navbox".