Cooksville GO Station
Template:Short description Script error: No such module "Infobox".Template:Template otherScript error: No such module "Parameter validation".Script error: No such module "Check for unknown parameters".Script error: No such module "check for deprecated parameters".
Cooksville GO Station is a GO Transit train and bus station the Milton line in the community of Cooksville in Mississauga, Ontario, Canada. It is located at 3210 Hurontario Street, near Dundas and Hurontario Streets. The future Hurontario LRT will connect to this station.[1]
Description
Like most GO stations, Cooksville has parking for commuters and a station building with a ticket sales agent and a waiting room. It is located near several condominium complexes, which provides ridership on the Milton Line. The 1400-space parking lot allows access to those who live closer to Mississauga City Centre to use the station.
The GO Station is served by seven trains inbound to Union Station in the morning rush hour and seven trains outbound to Milton during the evening rush hour. There is also the Train-Bus during off-peak hours.
Despite growing ridership on the Milton line, GO cannot schedule additional trains because of the busy Canadian Pacific Kansas City freight services running on the same tracks.[2] Trains were extended from ten to twelve carriages in a phased roll-out between April 8, 2008[3] and May 2, 2008 in order to increase capacity, and congestion is alleviated somewhat by the extensive train-bus services outside of rush periods.
On October 13, 2008 the Canadian Pacific Spirit Train stopped at Cooksville GO station to promote the Vancouver 2010 Winter Olympics.[4]
Repairs to the platforms and pedestrian tunnels began in October 2014 and was completed by the spring of 2015.[5]
Reconstruction
Demolition of the original Cooksville GO station building and portions of the parking lot began in 2018 in preparation for the construction of new station structures. The new station includes a multi-level parking structure, improved pedestrian access, and a connection to the under-construction Hurontario LRT.[6] Construction was completed on November 10, 2020,[7] at a cost of $128.4 million.[8] The new station is characterized by a bold expanded mesh facade screen designed by NORR Architects.[9] The design won awards from the International Parking and Mobility Institute for Design Excellence and was also a World Architecture Award Winner.[10]
Connecting buses
Buses such as MiWay and GO Transit enter the station with the following routes:
- MiWay
- [11]
- 2 Hurontario
- 4 North Service Road
- 28 Confederation
- 38 Creditview
- 53 Kennedy
- 103 Hurontario Express
- GO Transit
- 21 Milton/Toronto[12]
References
<templatestyles src="Reflist/styles.css" />
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Cooksville GO Station
- ↑ Script error: No such module "citation/CS1".
Script error: No such module "Check for unknown parameters".
External links
Script error: No such module "Navbox".
Template:MiWay terminals
- Pages with script errors
- Articles using Infobox station with markup inside name
- Articles using Infobox station with links or images inside name
- Pages with broken file links
- GO Transit railway stations
- Galt Subdivision
- Railway stations in Mississauga
- Railway stations in Canada opened in 1981
- 1981 establishments in Ontario
- Hurontario LRT