China Railway CRH3

From Wikipedia, the free encyclopedia
(Redirected from CRH3)
Jump to navigation Jump to search

Template:Short description Template:Use dmy dates Script error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".Template:Ensure AAA contrast ratio

The CRH3 Hexie (Template:Lang-zh) is a version of the Siemens Velaro high-speed train used in China on the Beijing–Tianjin intercity railway line, Wuhan-Guangzhou Passenger Dedicated Line, Zhengzhou-Xi'an Passenger Dedicated Line and the Shanghai–Nanjing intercity railway. It is capable of service speed of Script error: No such module "convert". as the very similar Velaro E used in Spain, but, similarly to the Sapsan, it is Script error: No such module "convert". wider to take advantage of a more generous structure gauge and thus be able to fit in more seats in a 2+3 layout.

Variants

In November 2005, the Ministry of Railways ordered 60 Velaro trains for use on the Beijing–Tianjin intercity railway line. On 27 July 2006, the joint project office was opened at Tangshan.[1]

CRH3C Prototypes

The first three trains were built in Germany by Siemens, and these imported trains were labelled CRH3A (CRH3-002A, CRH3-003A and CRH3-004A), different than the CRH3A-5218 developed independently and manufactured by CRRC Changchun Railway Vehicles in 2017, designed to operate at a cruise speed of Script error: No such module "convert".. These trains are based on the German Deutsche Bahn's ICE 3 high-speed trains and were given initial designations of CRH3A. Of these German trains, the first one was shipped from Bremerhaven on 19 December 2007.[2]

On 30 November 2012, the CNR announced new design of CRH3A, with three styles that can operate at top speed of Script error: No such module "convert"., Script error: No such module "convert". and Script error: No such module "convert".. The first train was rolled out on 3 June 2013.[3]

CRH3C

After December 2008, the three imported CRH3A were repainted and renamed to CRH3C (CRH3-002C, CRH3-003C and CRH3-004C). The last letter C means that each rolling stock of this model consists of 8 cars and runs with a maximum speed of Script error: No such module "convert".. The rest of the trains are now being built by Tangshan Railway Vehicle with some components from Germany.[4]

The first Chinese-built CRH3 (CRH3-001C) was unveiled on 11 April 2008.[4]

The 8-car CRH3C trains are similar to the Velaro E design in Spain, but Script error: No such module "convert". wider to fit more seats in a 2+3 layout; a Script error: No such module "convert". CRH3 train will seat 572 passengers: 16 deluxe-class (8 sold publicly), 56 in first-class, 528 in second-class.[5]

Each train sets consists of four motor cars and four trailer cars, equipped with two driving units, and each of them is in charge of the driving of two motor cars and two trailer cars.

The bogies are improved versions of the SF500 bogie. Innovations include the body bolster, vibration damper, spring parameters, transmission ratio, widening the carbody and increasing the speed of the trainsets.[6]

The trains are designed for running at Script error: No such module "convert".. On 24 June 2008, CRH3-001C reached a top speed of Script error: No such module "convert". during a test on the Beijing to Tianjin high speed line.[7]

On 9 December 2009, a pair of CRH3 EMUs (CRH3-013C + CRH3-017C) reached a top speed of Script error: No such module "convert". during a test on the Zhengzhou to Xi'an high speed line,[8] setting a world record for double-link EMUs.Script error: No such module "Unsubst".

On 28 September 2009, an additional 20 CRH3C sets was ordered by the Chinese MOR.[9]

CRH380B/BL

File:CRH380B-6401L at Shanghai Hongqiao Railway Station.jpg
CRH380BL at Shanghai Hongqiao railway station

In March 2009, a new contract was signed with China Northern Railways (CNR) to supply 100 16-car trainsets for 39.2B RMB with delivery from October 2010 onwards. This order for a total of 1600 railway cars is greater than the total production of all Velaro and ICE trains that have ever been manufactured in the past. It is planned that the trains will be produced by CNR subsidiaries, Tangshan Railway Vehicle and Changchun Railway Vehicles, using technology from the previous technology transfer agreement. In this contract, Siemens acts as a component supplier, with over 80% of the contract supplied by CNR.[10][11] An additional order for 40 16-car sets and 40 8-car sets was made on 28 September 2009 for 25.32B RMB.[12]

Top travel speed for this variant is Script error: No such module "convert"., though it is capable of attaining even higher speeds.[13] These trains have been designated as CRH380B (8-car set) and CRH380BL (16-car set) in September 2010.[14] The first CRH380BL set with series number CRH380B-6401L rolled off the production line and was unveiled to the public in September 2010. it was manufactured by Tangshan Railway Vehicle.[15] In October 2010, the 16-car train was sent to Beijing loop line for test. In November 2010, the train was sent to Beijing-Shanghai High-Speed Railway for trial run. The trainset reached the maximum speed of Script error: No such module "convert". on 5 December 2010.[16] More recently, during a subsequent test on 10 January 2011, a CRH380BL set reached a new record speed of Script error: No such module "convert"., breaking the previous record held by the CRH380A.[17]

Since 13 January 2011, the CRH380BL enter regular service at the Shanghai–Hangzhou High-Speed Railway and Shanghai–Nanjing High-Speed Railway.[18]

All 54 CRH380BL trainsets were recalled in mid-August 2011 due to operational problems on the new Beijing–Shanghai High-Speed Railway. The new trains were reported as being "too sensitive" and the subject of frequent breakdowns in stormy weather. They were temporarily replaced by the CRH380A and CRH380AL. The recalled trainsets returned to service in December 2011, .

CRH380CL

File:CRH380CL-5618@BJN (20160408104425).jpg
CRH380CL

CRH380CL is a modified CRH380BL with a redesigned nose and electrical equipment from Hitachi. 25 16-car trainsets have been ordered by the MOR, replacing 25 previously ordered CRH380BL units.[19] The first trainset was delivered and underwent testing in 2011.[20] The trains entered regular service in the Spring of 2013.[21]

CRH3A

File:China Railways CRH3A-5253 20180427.jpg
CRH3A

The CRH3A is based on CJ1 (which in itself is derived from the CRH380B/BL/CL) and CRH5. It was designed for operation on passenger dedicated lines and intercity railways at speeds between Script error: No such module "convert". and Script error: No such module "convert"..[22][23] The first sets where unveiled for public service on 6 December 2017 on the Xi'an–Chengdu HSR which opened a few days later.[24]

CRH3X

A prototype highspeed train being developed at CRRC Tangshan capable of cars in a trainset to be swapped out according to demand. Two platforms are being developed for Script error: No such module "convert". and Script error: No such module "convert". operation. Trains can be adjusted to be between 2 and 16 cars long with capability to swap in double deck passenger cars, restaurant and freight cars according to demand.[25][26][27]

Formation

Power Destination

  • M – Motor car
  • T – Trailer car
  • C – Driver cabin
  • P – Pantograph

Coach Type

  • SW – Business Class Coach
  • ZY – First Class Coach
  • ZE – Second Class Coach
  • CA – Dining Car
  • ZEC – Second Class Coach/Buffet Car
  • ZES – Second Class/Business Coach
  • ZYS – First Class/Business Coach
  • ZYG – First Class Coach/Sightseeing Car
  • ZET – Second Class Coach/Premier Coach
  • ZYT – First Class Coach/Premier Coach

CRH3C

Coach No. 1 2 3 4 5 6 7 8
Type ZET ZE ZEC ZY ZE ZET
Power Configuration MC TP M T M TP MC
Power Units Unit 1 Unit 2
Capacity 60+8 80 50 80 60+8
  • Train No. 3001–3080

CRH380B

Coach No. 1 2 3 4 5 6 7 8
Type ZYS ZE ZEC ZE ZES
Power Configuration MC TP M T M TP MC
Power Units Unit 1 Unit 2
Capacity 28+5 85 75 63 85 40+5
  • Train No. 3571-3731, 3738–3754, 5637–5681, 5730–5761, 5787–5802, 5829–5888

CRH380BG

Coach No. 1 2 3 4 5 6 7 8
Type ZYT ZE ZEC ZE ZET
Power Configuration MC TP M T M TP MC
Power Units Unit 1 Unit 2
Capacity 1 44+8 80 71 40 80 60+8
Capacity 2 28+5 85 75 63 85 40+5
  • <templatestyles src="Citation/styles.css"/>^1 Train No. 5546–5585
  • <templatestyles src="Citation/styles.css"/>^2 Train No. 5586-5600, 5626–5636, 5684–5729, 5762–5786, 5803–5822

CRH380BL

Coach No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Type 1 ZYS ZY SW ZY ZE ZEC ZE ZYS
Type 2 ZYS ZY ZE CA ZE ZYS
Power Configuration MC TP M T M TP M TP M T M TP MC
Power Units Unit 1 Unit 2 Unit 3 Unit 4
Capacity1 2+37 56 24 56 71 80 / 80 2+37
Capacity2 3+13 56 80 71 80 / 80 3+13
  • <templatestyles src="Citation/styles.css"/>^1 Train No. 3501-3543, 5501–5545
  • <templatestyles src="Citation/styles.css"/>^2 Train No. 3544-3570, 3732–3737, 5823–5828

CRH380CL

Coach No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Type 1 ZYG ZY SW ZY ZE CA ZE ZYG
Type 2 ZYS ZY ZE CA ZE ZYS
Power Configuration MC TP M T M TP M TP M T M TP MC
Power Units Unit 1 Unit 2 Unit 3 Unit 4
Capacity1 2+37 56 24 56 71 80 / 80 2+37
Capacity2 3+13 56 80 71 80 / 80 3+13
  • <templatestyles src="Citation/styles.css"/>^1 Train No. 5601
  • <templatestyles src="Citation/styles.css"/>^2 Train No. 5602–5625

Distribution

As of August 2017, there are 80 CRH3C series EMU, 661 CRH380B series EMU and 25 CRH380C series EMU in service.

Operator Quantity Serial number Depot Notes
<templatestyles src="Template:Color/styles.css" />CRH3A
Chengdu Railway Bureau 59 3081-3111,
5230-5257
Chengdu East
<templatestyles src="Template:Color/styles.css" />CRH3A-A
Template:NA 1 0510 Template:NA
<templatestyles src="Template:Color/styles.css" />CRH3A-A
Chengdu Railway Bureau 11 0512-0522 Guiyang North
<templatestyles src="Template:Color/styles.css" />CRH3C
Guangzhou Railway Group 21 3024, 3029, 3030, 3034, 3036, 3039, 3040, 3042, 3043, 3047, 3059–3061, 3063, 3065, 3066, 3068, 3069, 3072, 3076, 3080 Changsha
12 3023, 3025, 3027, 3028, 3045, 3052, 3064, 3067, 3070, 3071, 3073, 3074 Changsha West
Chengdu Railway Bureau 15 3005, 3006, 3022, 3026, 3031–3033, 3035, 3038, 3041, 3046, 3050, 3051, 3062, 3075 Chongqing North
32 3001-3004, 3007–3021, 3037, 3044, 3048, 3049, 3053–3058, 3077-3079 Chongqing West
<templatestyles src="Template:Color/styles.css" />CRH380BG
Shenyang Railway Bureau 36 5548-5555, 5558, 5559, 5562–5564, 5567–5569, 5572–5577, 5580, 5583–5587, 5595, 5596, 5684, 5685, 5689, 5713, 5774, 5815 Changchun
28 5686-5688, 5699, 5700, 5703, 5704, 5706–5709, 5724, 5725, 5728, 5729, 5763–5766, 5803, 5808–5812, 5817-5819 Dalian
24 5697, 5698, 5701, 5702, 5705, 5710, 5712, 5715, 5716, 5719, 5720, 5723, 5762, 5767–5771, 5775, 5777, 5806, 5813, 5814, 5816 Shenyang North
9 5690, 5772, 5773, 5776, 5783, 5784, 5804, 5805, 5807 Shenyang South
Harbin Railway Bureau 60 5546, 5547, 5556, 5557, 5560, 5561, 5565, 5566, 5570, 5571, 5578, 5579, 5581, 5582, 5588–5594, 5597–5600, 5626–5636, 5691–5696, 5711, 5714, 5717, 5718, 5721, 5722, 5726, 5727, 5778–5782, 5785, 5786, 5820-5822 Harbin West
<templatestyles src="Template:Color/styles.css" />CRH380B
Shanghai Railway Bureau 45 3573, 3581, 3585, 3589, 3593, 3594, 3600, 3603, 3604, 3606, 3609, 3611, 3618, 3619, 3623, 3626, 3629, 3634, 3640–3645, 3652, 3653, 3655, 3663, 3673, 3674, 3678, 3682, 3704, 3713–3719, 3721, 3728, 3739, 3741, 3743, 3752 Hefei South
31 3572, 3575, 3580, 3583, 3586, 3590, 3591, 3595, 3598, 3600–3602, 3605, 3607, 3612–3615, 3620, 3633, 3639, 3676, 3677, 3705, 3720, 3724, 3729, 3738, 3745, 3753 Xuzhou East
Guangzhou Railway Group 57 3577-3579, 3596, 3597, 3599, 3608, 3616, 3621, 3622, 3625, 3628, 3630, 3631, 3635, 3636, 3638, 3646–3648, 3650, 3651, 3654, 3656, 3658–3661, 3670, 3671, 3675, 3681, 3683–3690, 3698–3701, 3706–3708, 3710, 3722, 3725, 3727, 3744, 3746–3749, 3760 Changsha
Beijing Railway Bureau 19 5657-5669, 5671, 5738-5742 Beijing South
Jinan Railway Bureau 29 5643, 5644, 5646, 5650, 5672, 5673, 5679, 5681–5683, 5744, 5747, 5751, 5761, 5794, 5797, 5847, 5852, 5855, 5859, 5860, 5867–5870, 5881-5884 Qingdao North
28 5638, 5651, 5655, 5674, 5677, 5678, 5745, 5746, 5748, 5749, 5752, 5753, 5758–5760, 5789, 5796, 5799, 5800, 5830–5833, 5843, 5853, 5854, 5857, 5858 Jinan
Zhengzhou Railway Bureau 47 5649, 5653, 5654, 5670, 5676, 5680, 5733, 5735, 5736, 5756, 5757, 5787, 5788, 5790, 5791, 5795, 5801, 5802, 5835, 5837–5842, 5850, 5851, 5856, 5861–5866, 5872–5880, 5885-5888 Zhengzhou East
Xi'an Railway Bureau 55 3571, 3574, 3576, 3582, 3584, 3588, 3592, 3610, 3617, 3627, 3632, 3637, 3649, 3657, 3662, 3664, 3665, 3667–3669, 3672, 3680, 3691, 3692, 3694, 3697, 3709, 3712, 3723, 3726, 3730, 3731, 3740, 3742, 3750, 3751, 3754–3759, 3761–3771, 3773, 3774 Xi'an North
Lanzhou Railway Bureau 30 5637, 5639–5642, 5645, 5647, 5648, 5656, 5675, 5730–5732, 5734, 5737, 5743, 5750, 5652, 5754, 5792, 5793, 5798, 5834, 5836, 5844–5846, 5848, 5849, 5871 Lanzhou West
12 3624, 3666, 3679, 3693, 3695, 3696, 3702, 3703, 3711, 3772, 5755, 5829 Yinchuan
<templatestyles src="Template:Color/styles.css" />CRH380BL
Shanghai Railway Bureau 20 3504, 3505, 3510, 3516, 3517, 3519–3522, 3525, 3527, 3529, 3531, 3533, 3535, 3536, 3538–3540, 3542 Shanghai Hongqiao
9 3547, 3550, 3555, 3560, 3564, 3567, 3570, 3736, 3776 Shanghai Nanxiang
22 3501-3503, 3506–3509, 3511–3515, 3518, 3523, 3524, 3526, 3528, 3530, 3532, 3534, 3537, 3541 Hangzhou
18 3546, 3551, 3554, 3556, 3561, 3562, 3568, 3569, 3732–3734, 3775, 3777, 3778, 3781–3783, 3785 Hefei South
9 3545, 3553, 3565, 3735, 3737, 3779, 3780, 3784, 3786 Xuzhou East
Beijing Railway Bureau 11 5506, 5515, 5516, 5518, 5523, 5529, 5530, 5532, 5533, 5536, 5537 Caozhuang
Jinan Railway Bureau 14 5501, 5503, 5504, 5508, 5509, 5511, 5512, 5525–5528, 5534, 5539, 5540 Jinan
15 5502, 5505, 5507, 5510, 5513, 5514, 5517, 5519–5522, 5524, 5531, 5535, 5538 Qingdao North
Zhengzhou Railway Bureau 21 5541-5545, 5823–5828, 5889-5898 Zhengzhou East
Xi'an Railway Bureau 10 3543, 3544, 3548, 3549, 3552, 3557–3559, 3563, 3566 Xi'an North
<templatestyles src="Template:Color/styles.css" />CRH380BJ (formerly CIT400B)
China Railway 2 0301, A-0504 Comprehensive inspection trains in orange livery
<templatestyles src="Template:Color/styles.css" />CRH380CL
Beijing Railway Bureau 11 5601, 5603–5605, 5607–5609, 5617, 5618, 5620, 5621 Beijing South
Shanghai Railway Bureau 14 5602, 5606, 5610–5616, 5619, 5622-5625 Xuzhou East

Accidents and incidents

On 25 January 2018 the train number G284/281 from Qingdao railway station to Hangzhou East railway station, served by CRH380BL-5522 (staffed by Jinan Railway Bureau) was forced to make an emergency stop at Dingyuan railway station due to a fire on one of the main transformers installed in Coach 2 (ZY 552202).[28] Some 1400 passengers were evacuated, while the car affected by the fire has been completely burnt out. No injuries or casualties were reported.[29]

CRH3 on display in museums

File:CRH3 999C at Shenyang Railway Museum.jpg
CRH3 999C at the Steam Locomotive Gallery

There is a CRH3 on display at the Steam Locomotive Gallery of Shenyang. It is CRH3 999C according to the sign in front of the train.

See also

References

<templatestyles src="Reflist/styles.css" />

  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. a b Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".Template:Cbignore
  16. Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. Script error: No such module "citation/CS1".
  19. http://attachment.ourail.com:9999/hgfd4g634v4v/day_101217/101217115492aeec2493fd5a15.jpgScript error: No such module "Unsubst".
  20. Script error: No such module "citation/CS1".Template:Cbignore
  21. Archived at GhostarchiveTemplate:Cbignore and the Wayback MachineTemplate:Cbignore: Script error: No such module "citation/CS1".Template:Cbignore
  22. Script error: No such module "citation/CS1".
  23. Script error: No such module "citation/CS1".
  24. Script error: No such module "citation/CS1".
  25. Script error: No such module "citation/CS1".
  26. Script error: No such module "citation/CS1".
  27. Script error: No such module "citation/CS1".
  28. Script error: No such module "citation/CS1".
  29. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Template:Sister project

Template:High-speed rail in the People's Republic of China Template:German ICE class Script error: No such module "Navbox".