China Railway CRH2
Template:Short description Template:Expand Chinese Script error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".Template:Ensure AAA contrast ratio
The CRH2 Hexie (Template:Zh) is one of the high-speed train models in China. The CRH2 is based on the E2-1000 Series Shinkansen design from Japan with the license purchased from a consortium formed of Kawasaki Heavy Industries, Mitsubishi Electric, and Hitachi, and represents the second Shinkansen train model to be exported.
In 2004, the Ministry of Railway in China purchased an initial 60 sets of the train from Kawasaki Heavy Industries with a maximum speed of Script error: No such module "convert".. However, the newer versions of the CRH2 are not related to the E2-1000 Series despite having the same exterior shell.[1]
Variants
CRH2A
On October 20, 2004, the Ministry of Railway in China ordered 60 sets of CRH2A trains from Kawasaki Heavy Industries in Japan. Along with 60 sets of Bombardier's Regina-based CRH1A, and 40 sets of Alstom's Pendolino-based CRH5A, these train sets are consider as first batch of CRH trains.
Each of the CRH2A set consists of 8 cars. The first 3 sets (CRH2-001A - CRH2-003A) were built in Japan, the next 6 sets (CRH2-004A - CRH2-009A) were delivered in complete knock down form and assembled by CSR Sifang Locomotive and Rolling Stock. The remaining 51 sets (CRH2-010A - CRH2-060A) were built by Sifang through technology transfer from Japan.
The first train arrived at Qingdao port on March 8, 2006, with little fanfare, and was not even publicized in China. These trains have a maximum operation speed of Script error: No such module "convert". and started providing high-speed train service from April 18, 2007, the date of the sixth national railway speed-up.
According to Chinese and Japanese media, CRH2A trains started test trials ahead of commercial operation on the Shanghai-Hangzhou and Shanghai-Nanjing lines on January 28, 2007.
On September 14, 2010, the Chinese MOR ordered additional 40 sets of CRH2A trains (CRH2-151A - CRH2-190A) from CSR Sifang.
Additionally, from CRH2A-2212 to CRH2A-4131 2012 to 2017 were introduced.
CRH2B
In November 2007, the Ministry of Railway in China ordered 10 CRH2 sets with 16 cars per set (8M8T). These trains have been given designations CRH2B (CRH2-111B - CRH2-120B). Each CRH2B has three 1st seating cars (ZY), twelve 2nd seating cars (ZE), and one dining car (CA). Designed maximum operation speed is Script error: No such module "convert". with a power of Script error: No such module "convert"..
The first units were delivered on June 29, 2008,[2][3] and came into service on the Hefei–Nanjing Passenger Railway on August 1, 2008.[4]
CRH2C (CRH2-350)
After the introduction of the modified E2-1000 Series, Sifang built its own CRH2 with a maximum safe operating speed of Script error: No such module "convert".. The original train sets imported from Kawasaki had a maximum safe operating speed of Script error: No such module "convert"..
During June 2005 and September 2005, The Chinese Ministry of Railways launched bidding for High speed trains with a top speed over Script error: No such module "convert".. Along with Siemens's Velaro-based CRH3C, CSR Sifang bid 60 sets of CRH2C, includes 30 sets of CRH2C stage one with a top speed of Script error: No such module "convert"., and 30 sets of CRH2C stage two with a top speed of Script error: No such module "convert"..
In development and research of the Script error: No such module "convert". high speed train, The CRH2-300 project was launched by Chinese MOR and CSR. In 2006 the China Development Bank provided CNY 15 billion developmental financial loans to CSR Group for the projects of Script error: No such module "convert". high speed trains.[5] Over 50 academics, 150,000 technicians, 600 contractors were involved in the project.[6] This train's livery is not like the CRH2A, which the blue stripe does not end at the fronts of trainsets.
CRH2C stage one
CRH2C Stage one is a modified version of CRH2A. It has a maximum operating speed up to Script error: No such module "convert". by replacing two intermediate trailer cars with motorized cars. Equipped with an array of the state-of-the-art technologies, including aluminum alloy body with a reduced weight, high speed turntable, high speed pantograph, and optic-fiber based integrated control system.[7]
Chinese MOR ordered 30 sets of CRH2C stage one, name code CRH2-061C - CRH2-090C. The first set, CRH2-061C was unveiled on December 22, 2007.[8][9]
During the test on April 22, 2008, CRH2-061C reached a top speed of over Script error: No such module "convert". on Beijing-Tianjin high-speed rail.[10]
During the test on December 11, 2009, CRH2-061C reached a top speed of Script error: No such module "convert". on Zhengzhou-Xi'an high-speed rail.[11]
Together with CRH3C, the CRH2C stage one first came into service on Beijing-Tianjin Intercity high-speed rail on August 1, 2008, and all CRH2C stage one trains have been replaced by CRH3C in April, 2009. Currently, most of these trains are serving on the Shanghai-Nanjing high speed rail.
CRH2C stage two
CRH2C Stage two is the "re-design" version of the CRH2. Some of the details, like the aluminum body structure, noise reduction technology & reduction technique, draw on the CRH3C.And cancelled the driver's door. According to CSR Sifang, the improvements include the following aspects:
- The axle weight of the bogie increased from Script error: No such module "convert"., to prevent tremble of the train body at a higher speed,[6] the gear ratio has been optimized from 3.036 to 2.379, the critical instability speed is Script error: No such module "convert"..
- The thermal capacity of the bogie has been increased, which satisfied the continuous operation at Script error: No such module "convert".
- With the YQ-365 type AC traction motor. It has a maximum operating speed up to Script error: No such module "convert". with a power of Script error: No such module "convert"..
- The rigidity of the car body has been increased to lower the noise and vibration.
- Optimized car body and window design for better air tightness and strength.
- Added pressure protection system to avoid pressure fluctuation in the compartment and improvement of comfort.
- Optimized design of the roof antenna, exterior windscreen and windows for a lower air resistance.[12]
Chinese MOR ordered 30 sets of CRH2C stage two, name code CRH2-091C - CRH2-110C and CRH2-141C - CRH2-150C. The first set, CRH2-091C was unveiled in January 2010 and came into service on Zhengzhou-Xi'an high-speed rail in February, 2010.[13]
CRH2E
In November and December 2007, the Ministry of Railway in China ordered 20 CRH2 sleeper trains with 16 cars per set (8M8T). These trains are modified CRH2Bs, outfitted with traditional railway sleeping berths (couchette car) and have been given designations CRH2E (numbered CRH2-121E - CRH2-140E). Each CRH2E has thirteen 1st class sleeping cars (WR), two 2nd class seating cars (ZE), and one buffet car (CA) or one second class/dining car (ZEC). Designed maximum operation speed is Script error: No such module "convert". with Script error: No such module "convert". of power output.
The first batch of CRH2E, CRH2-121E - CRH2-126E, came into service on Beijing-Shanghai railway on December 21, 2008.[2][14] On 23 July 2011, one sleeper coach on CRH2-139E trainset has been derailed in the 2011 Wenzhou train collision, together with CRH1-046B.
The rest of CRH2Es were deployed on Beijing–Guangzhou–Shenzhen–Hong Kong High-Speed Railway since January 2015, operating overnight sleeper trains between Beijing and Guangzhou (including some trains to Shenzhen).
Double Deck CRH2E
A brand new variant of the CRH2E entered service in 2017 numbered beyond CRH2E-2463.[15][16] Instead of a traditional railway sleeping berth the sleeper train is organized with the corridor running down the middle of the train car with double deck "capsules" on each side.[17] Each capsule is similar in layout to airplane first class, and passengers are no longer sharing the room. Each capsule comes with independent tables, outlets, lamps, hangers and curtains. The body of the train is redesigned to reduce noise levels during travel. The trains have been dubbed "moving hotels".[18]
-
Front
-
Exterior
-
Interior
-
Leaving Beijing West railway station
CRH2G
CRH2G is a specialized cold and sand/windstorm resistant version of the CRH2 manufactured by CRRC Qingdao Sifang. The trains were tested on the Lanzhou–Xinjiang HSR and Harbin–Dalian HSR.[19] Tests where completed on November 10, 2015, and the first sets were assigned to Lanzhou–Xinjiang HSR.[20]
CRH2-380
Template:Main article In 2008, the Chinese MOR & CSR launched CRH2-380 project, the main purpose is to develop new-generation of high speed trains with maximum operation speed of Script error: No such module "convert".. CRH2 is one of the fundamental platforms of the new trains, which is designated as CRH380A.
Gallery
-
First Class Coach
-
Second Class Coach
-
Buffet Car
-
The buffet car of the CRH2E
-
Compartment Connection
Formation
At the time of the sixth national railway speed-up, at least 37 CRH2A sets had been delivered by Kawasaki and Sifang.[21] In 2008, all 60 CRH2A sets had been delivered by Kawasaki. The post-2008 production model of the CRH2 are designed and made solely by Sifang with a maximum safe operation speed of Script error: No such module "convert"..[1]
<templatestyles src="Col-begin/styles.css"/>
|
Power Destination
|
Coach Type
|
CRH2A (Previous)
| Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|---|---|---|---|---|---|---|---|---|
| Type1 | ZE | ZEC | ZE | ZY | ZE | |||
| Type2 | ZE | ZY | ZE | ZEC | ZE | ZY | ZE | |
| Type3 | ZE | ZET | ZE | ZEC | ZE | ZY | ZE | |
| Type4 | ZYS | ZE | ZE | ZEC | ZE | ZYT | ||
| Type5 | ZY | ZE | ZEC | ZE | ZY | |||
| Type6 | ZE | ZEC | ZY | ZE | ||||
| Type7 | ZE | ZYE | ZE | ZEC | ZE | ZY | ZE | |
| Type8 | ZY | ZE | ZEC | ZE | ||||
| Power Configuration | TC | M | TP | T | MP | M | TC | |
| Power Units | Unit 1 | Unit 2 | ||||||
| Capacity1 | 55 | 100 | 85 | 100 | 55 (+16) | 100 | 51 | 64 |
| Capacity2 | 55 | 100 | 46 | 100 | 55 (+16) | 100 | 51 | 64 |
| Capacity3 | 55 | 100 | 43+16 | 100 | 55 (+16) | 100 | 51 | 64 |
| Capacity4 | 15+4 | 51+4 | 85 | 100 | 55 (+16) | 100 | 24+4 | |
| Capacity5 | 42 | 78 | 85 | 100 | 55 (+16) | 100 | 51 | |
| Capacity6 | 55 | 100 | 85 | 100 | 55 (+16) | 78 | 51 | 64 |
| Capacity7 | 55 | 100 | 16+43 | 100 | 71 | 100 | 51 | 64 |
| Capacity8 | 48 | 90 | 90 | 77 | 63 | 90 | 90 | 65 |
- <templatestyles src="Citation/styles.css"/>^1 Other train sets
- <templatestyles src="Citation/styles.css"/>^2 Set Nº. 2006, 2011 and 2021
- <templatestyles src="Citation/styles.css"/>^3 Set Nº. 2015, 2027 and 2030
- <templatestyles src="Citation/styles.css"/>^4 Set Nº. 2042
- <templatestyles src="Citation/styles.css"/>^5 Set Nº. 2043
- <templatestyles src="Citation/styles.css"/>^6 Set Nº. 2044–2060
- <templatestyles src="Citation/styles.css"/>^7 Set Nº. 2151–2211. Coach No. 3 has 16 First Class Seats and 43 Second Class seats
- <templatestyles src="Citation/styles.css"/>^8 Set Nº. 2212–2416, 2427–2460, 2473–2499, 2828, 4001–4071, 4082–4095 and 4114–4131
CRH2A (Renovated)
| Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|---|---|---|---|---|---|---|---|---|
| Type1 | ZE | ZEC | ZE | ZY | ZE | |||
| Type2 (EC) | ZY | ZE | ZEC | ZE | ||||
| Power Configuration | TC | M | MP | M | MP | M | TC | |
| Power Units | Unit 1 | Unit 2 | ||||||
| Capacity1 | 55 | 100 | 85 | 100 | 55 (+16) | 100 | 51 | 64 |
| Capacity2 (EC) | 48 | 90 | 90 | 77 | 63 | 90 | 90 | 65 |
- <templatestyles src="Citation/styles.css"/>^1 Set Nº. 2001–2009, 2011–2060 and 2151–2211
- <templatestyles src="Citation/styles.css"/>^2 Set Nº. 2212–2416, 2427–2460, 2473–2499, 2828, 4001–4071, 4082–4095 and 4114–4131
CRH2B
| Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | ZY | ZE | CA | ZE | ||||||||||||
| Power Configuration | TC | M | TP | T | M | T | M | T | TP | M | TC | |||||
| Power Units | Unit 1 | Unit 2 | Unit 3 | Unit 4 | ||||||||||||
| Capacity | 36 | 68 | 51 | 100 | 85 | 100 | 85 | (32) | 85 | 100 | 85 | 100 | 85 | 100 | 85 | 65 |
- Set Nº. 2111–2120, 2466–2472 and 4096–4105
CRH2C
| Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|---|---|---|---|---|---|---|---|---|
| Type | ZE | ZEC | ZE | ZY | ZE | |||
| Power Configuration | TC | M | MP | M | MP | M | TC | |
| Power Units | Unit 1 | Unit 2 | ||||||
| Capacity1 | 55 | 100 | 85 | 100 | 55+16 | 100 | 51 | 64 |
| Capacity2 | 55 | 100 | 85 | 100 | 54+16 | 100 | 51 | 65 |
- <templatestyles src="Citation/styles.css"/>^1 Set Nº. 2062–2067 and 2069–2090
- <templatestyles src="Citation/styles.css"/>^2 Set Nº. 2091–2110 and 2141–2149
CRH2E
| Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type1 | ZE | WR | CA | WR | ZE | |||||||||||
| Type2 | ZE | WR | WRC | WR | ZE | |||||||||||
| Type3 | WR | WRC | WR | |||||||||||||
| Power Configuration | TC | M | TP | T | M | T | M | T | TP | M | TC | |||||
| Power Units | Unit 1 | Unit 2 | Unit 3 | Unit 4 | ||||||||||||
| Capacity1 | 55 | 40 | (0) | 40 | 40 | 55 | ||||||||||
| Capacity2 | 55 | 40 | 20 | 55 | ||||||||||||
| Capacity3 | 40 | 60 | 20 | 60 | 40 | |||||||||||
- <templatestyles src="Citation/styles.css"/>^1 Set Nº. 2121–2138 and 2140
- <templatestyles src="Citation/styles.css"/>^2 Set Nº. 2461 and 2462
- <templatestyles src="Citation/styles.css"/>^3 Set Nº. 2463–2465
CRH2G
| Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|---|---|---|---|---|---|---|---|---|
| Type | ZY | ZE | ZEC | ZE | ||||
| Power Configuration | TC | M | MP | M | MP | M | TC | |
| Power Units | Unit 1 | Unit 2 | ||||||
| Capacity | 48 | 90 | 77 | 63 | 90 | 65 | ||
- Set Nº. 2417–2426, 4072–4081 and 4106–4113
Accidents
Script error: No such module "Labelled list hatnote".
On July 23, 2011, two bullet trains were traveling in the same direction and the train in front, the CRH 1-046B was stopped by a or a faulty signal hit by lightning. The light that the second train was supposed to stop at was hit by lightning, malfunctioned and showed a green signal while it was supposed to be red. The second train was a CRH 2-139E. The CRH2 front cars fell off the viaduct and one standing at a 90° angle between the viaduct and the ground. The cars that fell to the ground are cars 1-3 and the fourth one was the one standing.
Distribution
since April 2024[update]Template:Dated maintenance category (articles)Script error: No such module "Check for unknown parameters".:
| Operator | Quantity | Serial number | Depot | Notes |
|---|---|---|---|---|
| <templatestyles src="Template:Color/styles.css" />CRH2A | ||||
| Wuhan Railway Bureau | 22 | 2011、2013、2033、2034、2039、2043、2045~2048、2050、2051、2053、2055、2169、2179、2180、2200、2205、2206、2209、2210 | Hankou | |
| 26 | 2017、2019、2022、2023、2027、2029、2035、2049、2052、2054、2056、2059、2060、2151、2152、2162~2164、2173、2192、2193、2199、2201、2207、2208、2211 | Wuhan | ||
| Shanghai Railway Bureau | 37 | 2001、2003、2005~2007、2009、2012、2015、2020、2024、2028、2031、2044、2057、2058、2153、2154、2159、2161、2166~2168、2174~2177、2181~2184、2186、2187、2189、2194~2196、2203 | Shanghai South | |
| 35 | 2002、2004、2008、2014、2016、2018、2021、2025、2026、2030、2032、2036~2038、2040~2042、2155~2158、2160、2165、2170~2172、2178、2185、2188、2190、2191、2197、2198、2202、2204 | Nantong | ||
| Nanchang Railway Bureau | 19 | 2215~2218、2233、2236、2237、2246、2249、2250、2252、2257、2260、2261、2284、2285、2290、2429、2430 | Nanchang | |
| 20 | 2212~2214、2220~2224、2247、2248、2251、2253~2256、2259、2291~2293、2302 | Nanchang West | ||
| 18 | 2219、2235、2282、2283、2324、2427、2447、2452、2457、2458、4006、4012、4013、4045、4047~4050 | Xiamen North | ||
| 7 | 2234、2258、2451、2453、2454、4008、4046 | Fuzhou South | ||
| 22 | 2271、2275、2326、2434~2437、2440~2442、2446、2455、2456、2476、2477、2493、2494、4009、4014~4017 | Longyan | ||
| Chengdu Railway Bureau | 25 | 2230、2305、2321、2323、2335、2336、2338~2340、2385、2390、2438、2480~2482、2490、2491、4007、4022、4035~4040 | Chongqing North | |
| 8 | 2228、2231、2304、2325、2373、2492、4023、4042 | Chongqing West | ||
| 13 | 2272、2333、2337、2360、2363、2364、2374、2391、2392、2395~2397、4020 | Guiyang North | ||
| Nanning Railway Bureau | 55 | 2238、2240~2245、2262、2263、2269、2270、2276、2279、2281、2286、2287、2296、2297、2301、2303、2312~2314、2327、2328、2346~2348、2370、2371、2375、2377、2378、2383、2386、2387、2393、2394、2398、2399、2401、2404、2407、2443~2445、2450、4018、4027、4031、4032、4069、4071、4114、4115 | Nanning | |
| 35 | 2239、2266、2277、2278、2280、2288、2289、2300、2306、2307、2366~2369、2376、2384、2400、2402、2412、2413、2431~2433、2439、4034、4041、4043、4068、4070、4116~4121 | Guilin North | ||
| Taiyuan Railway Bureau | 20 | 2294、2295、2308~2311、2316~2319、4122~4131 | Taiyuan | |
| Guangzhou Railway Bureau | 21 | 2274、2298、2320、2330、2331、2341、2349、2350、2380、2381、2389、2403、2405、2416、2474、2488、4002、4004、4025、4056、4067 | Guangzhou South | |
| 26 | 2299、2329、2343、2344、2372、2379、2382、2388、2408、2409、2428、2448、2473、2475、2478、2479、2487、2495、2497、4003、4024、4060、4062~4064、4066 | Foshan West | ||
| 6 | 2449、2496、2498、4055、4061、4065 | Changsha | ||
| Jinan Railway Bureau | 22 | 2225~2227、2267、2268、2332、2334、2361、2362、2365、2410、2411、2414、2415、2459、2483、2485、2486、4010、4011、4051、4052 | Qingdao | |
| 10 | 2345、2352~2359、2484 | Jinan | ||
| Kunming Railway Bureau | 43 | 2229、2232、2264、2265、2273、2315、2322、2342、2351、2406、2460、2489、2499、2828、4001、4005、4019、4021、4026、4028~4030、4033、4044、4053、4054、4057~4059、4082~4095 | Kunming South | |
| China Railway Corporation | 1 | 2010 | — | 200~250km/h comprehensive inspection train |
| CRH2B | ||||
| Shanghai Railway Bureau | 10 | 2111~2120 | Nanjing | |
| Wuhan Railway Bureau | 17 | 2466~2472、4096~4105 | Hankou | |
| CRH2C | ||||
| Shanghai Railway Bureau | 57 | 2062~2067、2069~2110、2141~2149 | Nanjing | |
| China Railway Corporation | 3 | 2061, 2068, 2150 | — | Track Inspection Train |
| CRH2E | ||||
| Beijing Railway Bureau | 17 | 2122~2126、2128、2130~2135、2137、2138、2463~2465 | Beijing | |
| Guangzhou Railway Bureau | 7 | 2121、2127、2129、2136、2140、2461、2462 | Shenzhen | |
| China Railway Corporation | 1 | 2139 | Retired | CRH2E-2139 was severely damaged after Wenzhou train collision on 23 July 2011. Carriages 1 to 5 scrapped after derailment, Carriages 6 to 10 dismantled by MOR, and Carriages 11 to 16 transformed into inspection trains. |
| CRH2J | ||||
| China Railway Corporation | 1 | 0205 | — | Comprehensive inspection trains in orange livery |
See also
- China Railway CRH6
- China Railway CRH380A
- China Railway CR400AF
- China Railway CIT trains
- E2 Series Shinkansen
- List of high-speed trains
- THSR 700T
References
<templatestyles src="Reflist/styles.css" />
- ↑ a b Japan Inc Shoots Itself on the Foot
- ↑ a b 关于动卧车票及CRH2系列列车的一些最新消息!
- ↑ 视频:我国首列具自主知识产权长大编组动车组下线
- ↑ 上海至合肥动车昨首发 全程3.5小时
- ↑ 南车集团高速列车项目获国家开发银行150亿贷款
- ↑ a b High Speed Rail (HSR) in China: 5 Years Equals 40 Years Template:Webarchive
- ↑ Proprietary High Speed Locomotives
- ↑ 我国自主研制的首列时速300公里动车组下线
- ↑ 国产首列时速300公里"和谐号"动车组成功下线 Template:Webarchive
- ↑ 京津城际列车跑出370公里时速 创国产动车组纪录 Template:Webarchive
- ↑ Script error: No such module "citation/CS1".
- ↑ CRH2C page on CSR Sifang official siteScript error: No such module "Unsubst".
- ↑ Script error: No such module "citation/CS1".
- ↑ 南车四方自主研制的世界首批长大编组卧车动车组投入运营 Template:Webarchive
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ 52列動車組將投入運營 37列為南車四方制造的和諧號CRH2型 Template:Webarchive, Science and Technology Daily
Script error: No such module "Check for unknown parameters".
External links
Template:High-speed rail in the People's Republic of China Script error: No such module "Navbox". Script error: No such module "Navbox". Template:Multiple units of China Railway
- Pages with script errors
- Pages with broken file links
- High-speed trains of China
- Electric multiple units of China
- Kawasaki multiple units
- CRRC multiple units
- Passenger trains running at least at 250 km/h in commercial operations
- CRRC Qingdao Sifang
- Passenger trains running at least at 200 km/h in commercial operations
- 25 kV AC multiple units
- Train-related introductions in 2007