Brenner Railway
Template:Short description Script error: No such module "infobox".Script error: No such module "Check for unknown parameters".
The Brenner Railway (Template:Langx; Template:Langx) is a major line connecting the Austrian and Italian railways from Innsbruck to Verona, climbing up the Wipptal (German for "Wipp Valley"), passing over the Brenner Pass, descending down the Eisacktal (German for "Eisack Valley") to Bolzano/Bozen, then further down the Adige Valley to Rovereto/Rofreit, and along the section of the Adige Valley, called in Italian the "Vallagarina", to Verona. This railway line is part of the Line 1 of Trans-European Transport Networks (TEN-T). It is considered a "fundamental" line by the state railways Ferrovie dello Stato (FS).[1]
History
The railway line was designed under the Austro-Hungarian Empire in the mid-19th century to ensure rapid and safe transport between Tyrol and northern Italy, especially Lombardy–Venetia. It was thus strategically important not only for economic but also for military reasons, as Austria was strongly committed to maintaining its borders south of the Alps.
The first section to be built was the lower section between Verona and Bolzano/Bozen. The design of this section was approved on 10 July 1853 by the engineer Alois Negrelli, an employee of the Südbahn, known for having built other Alpine railway lines and for developing a project of the Suez Canal. The section was opened in two different parts: on 23 March 1859 between Verona to Trento/Trient and 16 May 1859 from Trento/Trient to Bolzano/Bozen. This construction was handled by the k.k. Nord- und SüdTiroler Staatsbahn (German: "North and South Tyrol State Railways"), but the company was taken over by the new Austrian Southern Railway (German: Südbahn) at the beginning of 1859.[2]
Despite the loss of Veneto in the Third Italian War of Independence and its consequent shift of the border between Italy and Austria to Borghetto on the current boundary of Trentino and Verona in October 1866, the upper section from Bolzano/Bozen to Innsbruck was incomplete. The Script error: No such module "convert". route from Innsbruck to Bolzano/Bozen took only three years to build. This section had been under construction and was finally opened on 24 August 1867. The main designer and engineer, Karl von Etzel, died in 1865; he was not able to witness the completion of his work. After the Semmering railway, this Brenner Line was the second mountain railway built within the Austro-Hungarian Empire. It was also the first through line to cross over the Alps.
The section south of Borghetto became part of the Società per le strade ferrate dell'Alta Italia (Italian for Upper (Northern) Italian Railways, SFAI) in 1866.[3] In the 1885 reorganisation it was absorbed by the Società per le Strade Ferrate Meridionali (Adriatic Network).[4] The line came under the control of Ferrovie dello Stato upon its establishment in 1905.
In 1919, Italy acquired Trentino-South Tyrol under the Treaty of Saint-Germain-en-Laye and the Austro-Italian border moved to Brenner. The section from Trento/Trient to Brenner was subsequently electrified at 3,700 V at three-phase 16.7 Hz between 1929 and 1934.[5] Electrification was converted to 3,000 V DC on 30 May 1965.
In preparation for the proposed Brenner Base Tunnel, the Innsbruck bypass was completed in 1994 to improve access to the Lower Inn Valley railway. The bypass consists of a Script error: No such module "convert". tunnel (Austria's longest) and aims to remove the bulk of the freight train traffic from Innsbruck. In Italy, several new sections have been built, removing sections of line with several short tunnels with small cross sections. These include the Script error: No such module "convert". Sciliar tunnel opened in 1994, the Script error: No such module "convert". Pflersch tunnel opened in 1999 and the Script error: No such module "convert". Cardano tunnel opened in 1998.
Future
Following a sharp increase in freight traffic through the Brenner Pass (largely on road), the railway is currently considered to have insufficient capacity. Moreover, its steep grades, tight radius bends and the need to change locomotive engines at Brenner due to two different electrical systems as used in Austria and Italy mean that the average travel speed is low. For these reasons, the creation of a new line is planned from Verona to Munich via Innsbruck. At the heart of this project lies a Script error: No such module "convert". tunnel between Franzensfeste and Innsbruck, known as the Brenner Base Tunnel.[6]
Route
The maximum grade on the track is 31 per thousand (3.1%). The minimum curve radius is Script error: No such module "convert".. The highest point of the track is Brenner station at Script error: No such module "convert"., which is also the highest point reached on the standard gauge networks of the Austrian Federal Railways (ÖBB) and the Italian Ferrovie dello Stato (FS) networks.
To overcome the steep climb (Script error: No such module "convert". between Innsbruck and Brenner) two spiral tunnels were built, using the sides of a valley at St. Jodok on the Austrian side and the sides of the Pflerschtal (German for "Pflersch Valley") on the Italian side.
At Brenner station, located on the Brenner Pass (Script error: No such module "convert".), there is a monument to the designer, Karl von Etzel. This station is situated at the border between Italy and Austria and also the operational border between the ÖBB and FS networks. The two companies operate different electrical systems, (15,000 V AC at 16.7 Hz in Austria, and 3,000 V DC in Italy), which requires a stop to change electric locomotives. For this reason, for a long time the operation of express trains from Munich to Verona and Milan was carried out with diesel railcars. Until 30 May 1965 was also needed a second engine change in Bolzano station, as the Bolzano–Brenner section still operated under three-phase AC electrification.
In recent years the introduction of multicurrent rolling stock, which can be run on both the Austrian and Italian networks, has made it possible, at least in principle, to avoid locomotive changes. However, the need for locomotives to carry equipment for different signalling systems and to have safety approvals for different networks and lines, and the need for staff to know operating rules and routes has limited multicurrent operations in practice.
- Trains on the Brenner Railway
-
An ÖBB EuroSprinter on the Brenner railway.
-
An FS Class E.652 with a train on the Brenner railway.
-
An ÖBB Class 1044 with a train on the Brenner railway.
-
FS Class E.412 on the Brenner railway.
References
Notes
<templatestyles src="Reflist/styles.css" />
Script error: No such module "Check for unknown parameters".
Footnotes
<templatestyles src="Reflist/styles.css" />
Script error: No such module "Check for unknown parameters".
Sources
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".
- Script error: No such module "citation/CS1".}
See also
Script error: No such module "Navbox". Template:Major railway lines in Italy
Script error: No such module "Coordinates". Script error: No such module "Authority control".
- Pages with script errors
- Pages with broken file links
- Railway lines in Austria
- Railway lines in Veneto
- Railway lines in Trentino-Alto Adige/Südtirol
- Transport in South Tyrol
- Standard-gauge railways in Austria
- Standard-gauge railways in Italy
- Cross-border railway lines in Austria
- Cross-border railway lines in Italy
- Transport in the Alps