Beijing–Kowloon railway

From Wikipedia, the free encyclopedia
(Redirected from Beijing-Jiulong Railway)
Jump to navigation Jump to search

Template:Short description Template:Use dmy dates Script error: No such module "Unsubst".

<templatestyles src="Stack/styles.css"/>

Script error: No such module "infobox".Script error: No such module "Check for unknown parameters". Template:Chinese

Script error: No such module "Check for unknown parameters".

The Beijing–Kowloon railway, also known as the Jingjiu railway (Template:Zh) is a dual track railway connecting Beijing West railway station in Beijing to Shenzhen railway station in Shenzhen, Guangdong Province.

It was previously connected with Hong Kong's East Rail line across the border. All services south of Shenzhen were discontinued in July 2020, citing high-speed rail as a result.

History

File:Beijingwest.jpg
Beijing West station
File:KCR Hung Hom station exterior (1).jpg
The façade of Hung Hom station (Hong Kong Coliseum in the background)

Construction of the railway began in February 1993. It was opened on 1 September 1996, connecting Beijing and Shenzhen (and thereupon with Kowloon through the KCR East Rail) through Tianjin, Hebei, Shandong, Henan, Anhui, Hubei, Jiangxi and Guangdong, with a length of Script error: No such module "convert".. It has 790 bridges and 160 tunnels. The Jiujiang Yangtze River Bridge, at a length of Script error: No such module "convert"., is the longest across the Yangtze River.[1] Located between Jinghu railway (Beijing–Shanghai) and Jingguang railway (Beijing–Guangzhou) with a designed annual traffic volume of 70 million tonne,[2] it was built to alleviate the congested Jingguang railway, and to foster development in the areas to the east of Jingguang railway.

The idea had been proposed for a long time, and some of the sections, such as the Jiujiang Yangtze River Bridge, were built before construction of the whole line officially began. Some were converted from existing sections, such as between Jiujiang and Nanchang, and Fuyang and Shangqiu.

The railway uses the same line as Guangmeishan railway (Guangzhou–Meizhou–Shantou railway) between Longchuan and Dongguan. It joins the Guangshen railway (Guangzhou–Shenzhen railway, formerly the Chinese section of the Kowloon–Canton railway) at Dongguan, and follows the same route. Within Hong Kong, it shares the same pair of tracks with the East Rail line (formerly British section of the Kowloon–Canton railway).

Beijing–Kowloon through train services was previously provided on the Jingguang railway and Guangshen railway, instead of the Jingjiu railway, because Beijing-Kowloon line emphasizes freight traffic and pass through less major cities. Passengers using such service are required to go through customs and immigration checks for the cross-border service. However, the conventional cross-border services have been discontinued.

Electrification of the line between Beijing West and Lehua was completed in May 2010 allowing operating speeds to increase from Template:Cvt with provisions for operation of double-stack container trains.[3][4][5][6]

Places served

<templatestyles src="Div col/styles.css"/>

File:K91次列车通过上陵火车站.jpg
Beijing–Kowloon railway at the Shangling station in Heping County, Guangdong province

See also

Script error: No such module "Portal".

References

<templatestyles src="Reflist/styles.css" />

  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Template:Sister project

Template:Beijing–Kowloon railway Script error: No such module "Navbox". Template:Portal bar