Aylesbury Vale Parkway railway station

From Wikipedia, the free encyclopedia
(Redirected from Aylesbury Vale Parkway)
Jump to navigation Jump to search

Template:Short description Template:Use dmy dates Template:Use British English Script error: No such module "Infobox".Template:Template otherScript error: No such module "Parameter validation".Script error: No such module "Check for unknown parameters".Script error: No such module "check for deprecated parameters".

Aylesbury Vale Parkway railway station is a railway station serving villages northwest of Aylesbury, England. It also serves the Berryfields and Weedon Hill housing developments north of the town. The station and all trains serving it are operated by Chiltern Railways.

Background

Aylesbury Vale Parkway is on the former Metropolitan and Great Central Joint Railway, which formed part of the Great Central Main Line route linking London and Aylesbury with the East Midlands and North. The Office of the Deputy Prime Minister announced in April 2006 that it would provide £8.17 million for track and signalling improvements to the existing line, which then was only used to carry freight. A further £2.8 million was invested by Chiltern Railways' owners Laing Rail and £1 million by Buckinghamshire County Council.[1]

Construction began in October 2007[2] and the rail works were completed by Carillion Rail.[3]

The station was originally not due to be completed until 2010,[1] but actually opened on 14 December 2008, although the station building itself did not open until 1 June 2009.[4] In the interim while the station buildings were being completed, tickets and facilities were provided from Portakabins.[5]

Services and facilities

Aylesbury Vale Parkway has links to existing public transport bus services along the A41 corridor. A bus service from the station to several villages north of Aylesbury began on 15 December 2008. Other bus journeys include the Green Route 4 of the Rainbow Routes served by Redline Buses and very infrequent services to and from Bicester on the route 18 run by Langston & Tasker. The station has a taxi rank, car park, a charging point for electric vehicles and parking bays for motorcycles and pedal cycles.

The off-peak train service is one departure per hour to Marylebone via Template:Rws. In peak periods there are up to three trains per hour to Marylebone.[6] The journey time to Aylesbury is about four minutes.

Preceding station National Rail National Rail Following station
Terminus style="background:#Template:Chiltern colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Chiltern Railways
London–Aylesbury line
style="background:#Template:Chiltern colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Template:Rws
  Future services  <templatestyles src="S-note/styles.css" />
Template:Rws style="background:#Template:Temporary rail colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   East West Rail
Aylesbury-Milton Keynes Central
style="background:#Template:Temporary rail colour; color:inherit; border-left: 0px none; border-right: 0px none; border-top:1px #aaa solid; border-bottom:0px none;" |   Template:Rws

Plans

Script error: No such module "Labelled list hatnote".

File:AVParkway BusStop.JPG
Bus stop and shelter for Arriva route 16
File:AVParkway EVPark.JPG
Motorcycle parking bay (left) and electric vehicle charging bay (right)
File:AVParkway CyclePark.JPG
Cycle shelter

In 2011, East West Rail planned to extend passenger services from Template:Rws north and east to Milton Keynes Central and Template:Rws by 2025, using parts of the former Varsity Line route.[7] However, in November 2020 it was reported that this service may be dropped from the first phase.[8]

since 2020Template:Dated maintenance category (articles)Script error: No such module "Check for unknown parameters"., trains between Aylesbury and Template:Rws cannot serve Aylesbury Vale Parkway as there is no platform on the through route. In the East West Rail consultation it was proposed that the station would have two new through platforms and a terminating platform for terminating services to and for trains to Marylebone.[9]

The track between Aylesbury and the new station was upgraded to continuous welded rail with a maximum line speed for DMU passenger trains of Script error: No such module "convert".. It was proposed that, if services are extended to the north, trains between Milton Keynes Central and Marylebone would run via Template:Rws and not Amersham.[7]

In March 2021, the East West Rail Company announced that its opening plans for East West Rail have changed, notably deferring indefinitely a connection to Aylesbury.[10]

See also

References

<templatestyles src="Reflist/styles.css" />

  1. a b Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1". Script error: No such module "Unsubst".
  3. Script error: No such module "citation/CS1". Script error: No such module "Unsubst".
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Script error: No such module "citation/CS1".
  7. a b Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".

Script error: No such module "Check for unknown parameters".

External links

Script error: No such module "Side box".

Template:Railway Stations served by Chiltern Railways Script error: No such module "Navbox".