Alpine Tunnel: Difference between revisions

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
imported>Lepricavark
m top: prepended 'Use mdy dates' tag
 
imported>Robby
link to Commons is now defined on Wikidata
 
Line 1: Line 1:
{{Short description|Tunnel in Colorado}}
{{Short description|Tunnel in Colorado}}
{{For|tunnels under the Alps in Europe|List of tunnels in the Alps}}
{{For|tunnels under the Alps in Europe|List of tunnels in the Alps}}
{{more citations needed|date=September 2024}}
{{Use mdy dates|date=March 2025}}
{{Use mdy dates|date=March 2025}}
{{more citations needed|date=September 2024}}
{{infobox tunnel
{{infobox tunnel
|name= Alpine Tunnel
|name= Alpine Tunnel
Line 25: Line 25:
}}
}}


'''Alpine Tunnel''' is a {{convert|1772|ft|abbr=on}} [[narrow gauge railroad]] [[tunnel]] located east of [[Pitkin, Colorado]], on the former [[Denver, South Park and Pacific Railroad]] route from [[Denver]] to [[Gunnison, Colorado|Gunnison]].  At an elevation of {{convert|11523|ft}}, it was the first tunnel constructed across the [[Continental Divide]] in Colorado and was the highest railroad tunnel in North America at the time of its construction in 1882.<ref>{{cite web |title=Alpine Tunnel - A Path Through History |url=https://www.fs.usda.gov/detail/gmug/landmanagement/resourcemanagement/?cid=stelprdb5431658 |website=Forest Service |publisher=USDA |access-date=27 December 2023}}</ref> The line was abandoned less than 30 years later, in 1910, after a series of accidents and problems in and around the tunnel.  Now the tunnel is sealed, and the remaining trackbed serves as a trail for hikers and bicyclists.
'''Alpine Tunnel''' is a {{convert|1772|ft|abbr=on}} [[narrow gauge railroad]] [[tunnel]] located east of [[Pitkin, Colorado]], on the former [[Denver, South Park and Pacific Railroad]] route from [[Denver]] to [[Gunnison, Colorado|Gunnison]].  At an elevation of {{convert|11523|ft}}, it was the first tunnel constructed across the [[Continental Divide]] in Colorado and was the highest railroad tunnel in North America at the time of its construction in 1882.<ref>{{cite web |title=Alpine Tunnel - A Path Through History |url=http://www.fs.usda.gov/r02/gmug |website=Forest Service |publisher=USDA |access-date=27 December 2023}}</ref> The line was abandoned less than 30 years later, in 1910, after a series of accidents and problems in and around the tunnel.  Now the tunnel is sealed, and the remaining trackbed serves as a trail for hikers and bicyclists.


==History==
==History==
Line 35: Line 35:


==Present day==
==Present day==
The east portal of the tunnel has collapsed and the west portal has been covered by [[landslide]]s. The former railbed is now a [[hiking trail]] on the east side, and a rough road over the former railbed on the west side leads to a restored [[train station]]. The road to the west portal was damaged in 2016 and was reopened on August 1, 2022, until August 31, 2022.{{cn|date=February 2024}}
The east portal of the tunnel has collapsed and the west portal has been covered by [[landslide]]s. The former railbed is now a [[hiking trail]] on the east side, and a rough road over the former railbed on the west side leads to a restored [[train station]]. The road to the west portal was damaged in 2016 and was reopened on August 1, 2022, until August 31, 2022.{{citation needed|date=February 2024}}


Little remains of the station complex built by the railroad to service its trains and workers at this remote and inhospitable location.  Volunteers have restored the railroad's 1883 Alpine Tunnel [[Electrical telegraph|telegraph office]] and reconstructed the station platform, {{convert|120|ft}} of rail track, a turntable, and an outhouse.  Only ruins remain of the section house and engine house, and other buildings and railroad infrastructure have disappeared. In 2023, work began to reinforce the Palisade Wall with the intent of reopening public access to the Alpine Tunnel Road.<ref>{{cite web |last1=Rehn |first1=Maddie |title=Restoring Colorado's Rocky Mountain Alpine Tunnel Historic District |url=https://www.nationalforests.org/blog/restoring-colorados-rocky-mountain-alpine-tunnel-historic-district |website=National Forests Blog |publisher=National Forest Foundation |access-date=27 December 2023}}</ref>
Little remains of the station complex built by the railroad to service its trains and workers at this remote and inhospitable location.  Volunteers have restored the railroad's 1883 Alpine Tunnel [[Electrical telegraph|telegraph office]] and reconstructed the station platform, {{convert|120|ft}} of rail track, a turntable, and an outhouse.  Only ruins remain of the section house and engine house, and other buildings and railroad infrastructure have disappeared. In 2023, work began to reinforce the Palisade Wall with the intent of reopening public access to the Alpine Tunnel Road.<ref>{{cite web |last1=Rehn |first1=Maddie |title=Restoring Colorado's Rocky Mountain Alpine Tunnel Historic District |url=https://www.nationalforests.org/blog/restoring-colorados-rocky-mountain-alpine-tunnel-historic-district |website=National Forests Blog |publisher=National Forest Foundation |access-date=27 December 2023}}</ref>
Line 60: Line 60:


==External links==
==External links==
{{commonscat-inline|Alpine Tunnel}}
{{commons category-inline}}
* [https://web.archive.org/web/20210609000814/http://colomar.com/ColoradoPlaces/alpine.html Western Portal of the Alpine Tunnel - Pitkin Area]
* [https://web.archive.org/web/20210609000814/http://colomar.com/ColoradoPlaces/alpine.html Western Portal of the Alpine Tunnel - Pitkin Area]
* [http://www.narrowgauge.org/alpine-tunnel/html/auto_tour.html Guide to the Alpine Tunnel Historical District]
* [http://www.narrowgauge.org/alpine-tunnel/html/auto_tour.html Guide to the Alpine Tunnel Historical District]

Latest revision as of 23:05, 28 June 2025

Template:Short description Script error: No such module "For". Template:More citations needed Template:Use mdy dates Template:Infobox tunnel

Alpine Tunnel is a Template:Convert narrow gauge railroad tunnel located east of Pitkin, Colorado, on the former Denver, South Park and Pacific Railroad route from Denver to Gunnison. At an elevation of Template:Convert, it was the first tunnel constructed across the Continental Divide in Colorado and was the highest railroad tunnel in North America at the time of its construction in 1882.[1] The line was abandoned less than 30 years later, in 1910, after a series of accidents and problems in and around the tunnel. Now the tunnel is sealed, and the remaining trackbed serves as a trail for hikers and bicyclists.

History

Location of the tunnel portals and establishing a center line of the bore were completed in December 1879. Construction took place from 1880–1881, by Cummings & Co. Construction company, and the tunnel was "holed through" on July 26, 1881. This was the highest and most expensive tunnel built up until that time. It is more than two miles (3 km) above sea level, with its highest point at 11,523.7 feet (3,512.4 m). It is 500 feet (150 m) under Altman Pass, later to be renamed Alpine Pass to prevent confusion, with a 1,825-foot (556 m) bore. It took 18 months to complete, with most of the construction done during the winter months.Script error: No such module "Unsubst".

The DSP&P had anticipated boring the Alpine tunnel through solid rock, taking about 6 months to complete. In the event, the line of the tunnel was found to run primarily through loose rock and clay; this very unstable ground required substantial timbering. The additional work necessitated by the unexpected ground conditions was a major contributor to the 18 month construction time.[2]

The tunnel was abandoned in 1910 by the Colorado & Southern due to minor damage in the interior. This was not considered to be worth repairing due to a lack of traffic, as the line failed to get much beyond Gunnison on the west side. The Gunnison Division of the Colorado & Southern was abandoned from St. Elmo on the east side of the pass to Quartz on the west side. The line from Quartz to Baldwin was given to the Denver & Rio Grande Western in exchange for some little used lines around Leadville.

Present day

The east portal of the tunnel has collapsed and the west portal has been covered by landslides. The former railbed is now a hiking trail on the east side, and a rough road over the former railbed on the west side leads to a restored train station. The road to the west portal was damaged in 2016 and was reopened on August 1, 2022, until August 31, 2022.Script error: No such module "Unsubst".

Little remains of the station complex built by the railroad to service its trains and workers at this remote and inhospitable location. Volunteers have restored the railroad's 1883 Alpine Tunnel telegraph office and reconstructed the station platform, Template:Convert of rail track, a turntable, and an outhouse. Only ruins remain of the section house and engine house, and other buildings and railroad infrastructure have disappeared. In 2023, work began to reinforce the Palisade Wall with the intent of reopening public access to the Alpine Tunnel Road.[3]

The Alpine Tunnel Historic District was placed on the National Register of Historic Places in April 1996. It is typically open from July to September.

Gallery

See also

References

Template:Reflist

External links

Template:Commons category-inline

  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Script error: No such module "citation/CS1".