Frankston line: Difference between revisions
imported>Fork99 "signaling" (American spelling) -> "signalling" (Australian/British spelling) per MOS:TIES |
imported>Kaltenmeyer m WP:AWB clean up |
||
| Line 1: | Line 1: | ||
{{Short description|Passenger rail service in metropolitan Melbourne, Victoria, Australia}} | |||
{{good article}} | {{good article}} | ||
{{Use dmy dates|date=December 2020}} | {{Use dmy dates|date=December 2020}} | ||
{{Use Australian English|date=January 2012}} | {{Use Australian English|date=January 2012}} | ||
| Line 76: | Line 76: | ||
{{Main|Frankston railway line#Future}} | {{Main|Frankston railway line#Future}} | ||
A 2007, restructure of train ticketing in Melbourne involved the removal of Zone 3, with Zone 3 stations being re-classified to Zone 2.<ref>{{Cite web |last=Moynihan |first=Stephen |date=3 March 2007 |title=No more Zone 3 lifts load on commuters |url=https://www.theage.com.au/national/no-more-zone-3-lifts-load-on-commuters-20070303-ge4cc2.html |url-status=live |archive-url=https://web.archive.org/web/20221229011957/https://www.theage.com.au/national/no-more-zone-3-lifts-load-on-commuters-20070303-ge4cc2.html |archive-date=29 December 2022 |access-date=29 December 2022 |website=The Age}}</ref> This brought the cost of train fares down, improving system accessibility to the public. All stations between [[Patterson railway station|Patterson]] and Frankston were rezoned to Zone 2.<ref>{{Citation | A 2007, restructure of train ticketing in Melbourne involved the removal of Zone 3, with Zone 3 stations being re-classified to Zone 2.<ref>{{Cite web |last=Moynihan |first=Stephen |date=3 March 2007 |title=No more Zone 3 lifts load on commuters |url=https://www.theage.com.au/national/no-more-zone-3-lifts-load-on-commuters-20070303-ge4cc2.html |url-status=live |archive-url=https://web.archive.org/web/20221229011957/https://www.theage.com.au/national/no-more-zone-3-lifts-load-on-commuters-20070303-ge4cc2.html |archive-date=29 December 2022 |access-date=29 December 2022 |website=The Age}}</ref> This brought the cost of train fares down, improving system accessibility to the public. All stations between [[Patterson railway station|Patterson]] and Frankston were rezoned to Zone 2.<ref>{{Citation |title=Melbourne's Train Network Map 2006 |date=2014-07-16 |url=https://www.flickr.com/photos/mptgextras/14948201377/ |access-date=2023-08-05 |publisher=Melbourne's Public Transport Gallery}}</ref> | ||
[[File:Southland Railway Station.jpg|thumb|[[Southland railway station|Southland station]] was opened in November 2017|alt=The new side platforms at the modern southland station, with a shelter in the foreground]] | [[File:Southland Railway Station.jpg|thumb|[[Southland railway station|Southland station]] was opened in November 2017|alt=The new side platforms at the modern southland station, with a shelter in the foreground]] | ||
At the [[2010 Victorian state election|2010 state election]], both the [[Australian Labor Party (Victorian Branch)|Labor Party]] and the [[Liberal Party of Australia|Liberal Party]] promised to provide a new [[Premium station]] between [[Highett railway station|Highett]] and [[Cheltenham railway station, Melbourne|Cheltenham]], to serve the [[Westfield Southland]] shopping centre.<ref>{{cite web |title=City of Kingston Historical Website – 'Railway Station at Bay Road' |url=http://localhistory.kingston.vic.gov.au/htm/article/72.htm |url-status=live |archive-url=https://web.archive.org/web/20110927095850/http://localhistory.kingston.vic.gov.au/htm/article/72.htm |archive-date=27 September 2011 |access-date=2007-07-30}}</ref> The station was projected to cost $13 million, and would have two [[railway platform|platforms]], an information booth, and shelters with a projected usage of 1,400 passengers daily. The project was scheduled to be completed by 2014, however, no progress was made till after the [[2014 Victorian state election|2014 state election]].<ref>{{cite news |last1=Andrews |first1=Jon |date=2010-11-18 |title=Both parties promise Southland train station |work=Bayside Leader |url=http://bayside-leader.whereilive.com.au/news/story/mordialloc-both-parties-promise-southland-train-station/ |access-date=2017-11-13 |archive-url=https://web.archive.org/web/20110123170538/http://bayside-leader.whereilive.com.au/news/story/mordialloc-both-parties-promise-southland-train-station/ |archive-date=2011-01-23}}</ref> The new station opened on 26 November 2017 as [[Southland railway station|Southland station]].<ref>{{cite web |title=New station at Southland |url=https://www.ptv.vic.gov.au/projects/railway-stations/new-station-at-southland/ |url-status=dead |archive-url=https://web.archive.org/web/20131126020859/https://www.ptv.vic.gov.au/projects/railway-stations/new-station-at-southland/ |archive-date=26 November 2013 |access-date=19 October 2019 |publisher=Public Transport Victoria}}</ref> In 2013, the line, along with the [[Werribee railway line|Werribee]] and [[Williamstown railway line|Williamstown]] lines, were upgraded as part of the Bayside Rail Project. The upgrade included station refurbishments, track, signal, and electrical upgrades to allow [[X'Trapolis 100|X'Trapolis]] trains to operate on these lines.<ref>{{cite web |title=Bayside Rail Project |url=http://ptv.vic.gov.au/projects/rail-projects/bayside-rail-project/ |archive-url=https://web.archive.org/web/20140429223236/http://ptv.vic.gov.au/projects/rail-projects/bayside-rail-project/ |archive-date=2014-04-29 |access-date=2017-11-13 |publisher=Public Transport Victoria}}</ref> | At the [[2010 Victorian state election|2010 state election]], both the [[Australian Labor Party (Victorian Branch)|Labor Party]] and the [[Liberal Party of Australia|Liberal Party]] promised to provide a new [[Premium station]] between [[Highett railway station|Highett]] and [[Cheltenham railway station, Melbourne|Cheltenham]], to serve the [[Westfield Southland]] shopping centre.<ref>{{cite web |title=City of Kingston Historical Website – 'Railway Station at Bay Road' |url=http://localhistory.kingston.vic.gov.au/htm/article/72.htm |url-status=live |archive-url=https://web.archive.org/web/20110927095850/http://localhistory.kingston.vic.gov.au/htm/article/72.htm |archive-date=27 September 2011 |access-date=2007-07-30}}</ref> The station was projected to cost $13 million, and would have two [[railway platform|platforms]], an information booth, and shelters with a projected usage of 1,400 passengers daily. The project was scheduled to be completed by 2014, however, no progress was made till after the [[2014 Victorian state election|2014 state election]].<ref>{{cite news |last1=Andrews |first1=Jon |date=2010-11-18 |title=Both parties promise Southland train station |work=Bayside Leader |url=http://bayside-leader.whereilive.com.au/news/story/mordialloc-both-parties-promise-southland-train-station/ |access-date=2017-11-13 |archive-url=https://web.archive.org/web/20110123170538/http://bayside-leader.whereilive.com.au/news/story/mordialloc-both-parties-promise-southland-train-station/ |archive-date=2011-01-23}}</ref> The new station opened on 26 November 2017 as [[Southland railway station|Southland station]].<ref>{{cite web |title=New station at Southland |url=https://www.ptv.vic.gov.au/projects/railway-stations/new-station-at-southland/ |url-status=dead |archive-url=https://web.archive.org/web/20131126020859/https://www.ptv.vic.gov.au/projects/railway-stations/new-station-at-southland/ |archive-date=26 November 2013 |access-date=19 October 2019 |publisher=Public Transport Victoria}}</ref> In 2013, the line, along with the [[Werribee railway line|Werribee]] and [[Williamstown railway line|Williamstown]] lines, were upgraded as part of the Bayside Rail Project. The upgrade included station refurbishments, track, signal, and electrical upgrades to allow [[X'Trapolis 100|X'Trapolis]] trains to operate on these lines.<ref>{{cite web |title=Bayside Rail Project |url=http://ptv.vic.gov.au/projects/rail-projects/bayside-rail-project/ |archive-url=https://web.archive.org/web/20140429223236/http://ptv.vic.gov.au/projects/rail-projects/bayside-rail-project/ |archive-date=2014-04-29 |access-date=2017-11-13 |publisher=Public Transport Victoria}}</ref> | ||
| Line 97: | Line 97: | ||
=== Baxter Extension === | === Baxter Extension === | ||
[[File:Baxter railway station, Melbourne b.jpg|thumb|[[Baxter railway station|Baxter station]] on the [[Stony Point railway line|Stony Point line]], April 2008|alt=The tired single platform of Baxter station in a rural environment ]] | [[File:Baxter railway station, Melbourne b.jpg|thumb|[[Baxter railway station|Baxter station]] on the [[Stony Point railway line|Stony Point line]], April 2008|alt=The tired single platform of Baxter station in a rural environment ]] | ||
In 2013, as part of Public Transport Victoria's [[Melbourne Network Development Plan|Network Development Plan]] for metropolitan rail, an extension of the Frankston line to Baxter was earmarked to begin in the "long-term", which would equate to at least 2033. The proposal would link Frankston to Baxter through an electrified dual-line following the Stony Point line.<ref name=":1" /> In 2018, the [[Liberal Party of Australia (Victorian Division)|Liberal Party]] announced a project to extend electrified services to Baxter during the [[2018 Victorian state election|2018 state election]].<ref>[https://www.heraldsun.com.au/leader/south-east/state-liberal-leader-matthew-guy-supports-duplication-electrification-of-rail-line-to-baxter/news-story/bfafeeea15be68889b16bf725027a6fe State Liberal leader Matthew Guy supports duplication, electrification of rail line to Baxter] {{Webarchive|url=https://web.archive.org/web/20210216095435/https://www.heraldsun.com.au/leader/south-east/state-liberal-leader-matthew-guy-supports-duplication-electrification-of-rail-line-to-baxter/news-story/bfafeeea15be68889b16bf725027a6fe|date=16 February 2021}} Herald Sun 26 January 2018</ref> The project would have included the removal of all crossings between Frankston and Baxter, duplication and electrification works, the reconstruction and redevelopment of the stations at Leawarra and Langwarrin respectively to facilitate electrification.<ref name=":4">{{Cite web |last=Towell |first=Noel |date=2018-07-16 |title=Guy, Turnbull all aboard the $450 million Baxter rail link |url=https://www.theage.com.au/politics/victoria/guy-turnbull-all-aboard-the-450-million-baxter-rail-link-20180716-p4zrsw.html |access-date=2023-02-06 |website=The Age |language=en}}</ref><ref>{{Cite web |last=Walker |first=Neil |date=2018-07-23 |title=Liberals' electric plan ends at Baxter |url=https://www.mpnews.com.au/2018/07/24/liberals-electric-plan-ends-at-baxter/ |access-date=2023-02-06 |website=MPNEWS |language=en-US}}</ref> | In 2013, as part of Public Transport Victoria's [[Melbourne Network Development Plan|Network Development Plan]] for metropolitan rail, an extension of the Frankston line to Baxter was earmarked to begin in the "long-term", which would equate to at least 2033. The proposal would link Frankston to Baxter through an electrified dual-line following the Stony Point line.<ref name=":1" /> In 2018, the [[Liberal Party of Australia (Victorian Division)|Liberal Party]] announced a project to extend electrified services to Baxter during the [[2018 Victorian state election|2018 state election]].<ref>[https://www.heraldsun.com.au/leader/south-east/state-liberal-leader-matthew-guy-supports-duplication-electrification-of-rail-line-to-baxter/news-story/bfafeeea15be68889b16bf725027a6fe State Liberal leader Matthew Guy supports duplication, electrification of rail line to Baxter] {{Webarchive|url=https://web.archive.org/web/20210216095435/https://www.heraldsun.com.au/leader/south-east/state-liberal-leader-matthew-guy-supports-duplication-electrification-of-rail-line-to-baxter/news-story/bfafeeea15be68889b16bf725027a6fe|date=16 February 2021}} Herald Sun 26 January 2018</ref> The project would have included the removal of all crossings between Frankston and Baxter, duplication and electrification works, the reconstruction and redevelopment of the stations at Leawarra and Langwarrin respectively to facilitate electrification.<ref name=":4">{{Cite web |last=Towell |first=Noel |date=2018-07-16 |title=Guy, Turnbull all aboard the $450 million Baxter rail link |url=https://www.theage.com.au/politics/victoria/guy-turnbull-all-aboard-the-450-million-baxter-rail-link-20180716-p4zrsw.html |access-date=2023-02-06 |website=The Age |language=en}}</ref><ref>{{Cite web |last=Walker |first=Neil |date=2018-07-23 |title=Liberals' electric plan ends at Baxter |url=https://www.mpnews.com.au/2018/07/24/liberals-electric-plan-ends-at-baxter/ |access-date=2023-02-06 |website=MPNEWS |language=en-US}}</ref> | ||
The [[Liberal Party of Australia|Federal Liberals]] announced $450 million of joint funding for the project promised between the state and federal governments.<ref name=":4" /> The incumbent [[Daniel Andrews|Andrews]] [[Australian Labor Party (Victorian Branch)|Labor]] government argued that the project was not needed, instead prioritising funding to other projects across the state.<ref name=":4" /> A business case commissioned by the government was completed in 2019 with no further progress being made.<ref name=":19">{{cite web |title=Baxter electrification business case |url=https://transport.vic.gov.au/getting-around/public-transport/baxter-electrification-business-case |url-status=dead |archive-url=https://web.archive.org/web/20190106065315/https://transport.vic.gov.au/getting-around/public-transport/baxter-electrification-business-case |archive-date=6 January 2019 |website=Transport for Victoria}}</ref> | The [[Liberal Party of Australia|Federal Liberals]] announced $450 million of joint funding for the project promised between the state and federal governments.<ref name=":4" /> The incumbent [[Daniel Andrews|Andrews]] [[Australian Labor Party (Victorian Branch)|Labor]] government argued that the project was not needed, instead prioritising funding to other projects across the state.<ref name=":4" /> A business case commissioned by the government was completed in 2019 with no further progress being made.<ref name=":19">{{cite web |title=Baxter electrification business case |url=https://transport.vic.gov.au/getting-around/public-transport/baxter-electrification-business-case |url-status=dead |archive-url=https://web.archive.org/web/20190106065315/https://transport.vic.gov.au/getting-around/public-transport/baxter-electrification-business-case |archive-date=6 January 2019 |website=Transport for Victoria}}</ref> | ||
| Line 106: | Line 106: | ||
=== Services === | === Services === | ||
Services on the Frankston line operates from approximately 4:00 am to around 11:30 daily.<ref name=":92"/> In general, during peak hours, train frequency is 10 minutes during the peak period while services during non-peak hours drops to 10–20 minutes throughout the entire route.<ref name=":3">{{Cite web |date=1 March 2021 |title=New timetable train line information – Public Transport Victoria |url=https://www.ptv.vic.gov.au/more/the-new-timetable-for-victorias-train-network/new-timetable-train-line-information/?line=cranbourne-and-pakenham |url-status=dead |archive-url=https://web.archive.org/web/20210301102536/https://www.ptv.vic.gov.au/more/the-new-timetable-for-victorias-train-network/new-timetable-train-line-information/?line=cranbourne-and-pakenham |archive-date=1 March 2021 |access-date=18 December 2022 | Services on the Frankston line operates from approximately 4:00 am to around 11:30 daily.<ref name=":92"/> In general, during peak hours, train frequency is 10 minutes during the peak period while services during non-peak hours drops to 10–20 minutes throughout the entire route.<ref name=":3">{{Cite web |date=1 March 2021 |title=New timetable train line information – Public Transport Victoria |url=https://www.ptv.vic.gov.au/more/the-new-timetable-for-victorias-train-network/new-timetable-train-line-information/?line=cranbourne-and-pakenham |url-status=dead |archive-url=https://web.archive.org/web/20210301102536/https://www.ptv.vic.gov.au/more/the-new-timetable-for-victorias-train-network/new-timetable-train-line-information/?line=cranbourne-and-pakenham |archive-date=1 March 2021 |access-date=18 December 2022 }}</ref> Rather than running through the [[City Loop]], services continue onto the [[Werribee railway line|Werribee]] (express or via the Altona Loop) or [[Williamstown railway line|Williamstown]] lines (with varying frequencies).<ref name=":1">{{Cite web |title=Growing Our Rail Network 2018–2025 |url=https://www.ptv.vic.gov.au/footer/legal-and-policies/growing-our-rail-network-2018-2025/ |access-date=2023-02-06 |website=Public Transport Victoria |language=en-GB}}</ref> On Friday nights and weekends, services run 24 hours a day, with 60 minute frequencies available outside of normal operating hours.<ref>{{Cite web |date=2022 |title=Melbourne Weekend Night Network Train Map |url=https://www.ptv.vic.gov.au/assets/PTV-default-site/Maps-and-Timetables-PDFs/Maps/Night-Network-maps/Night-Train-Map-SEPT-2021.pdf |url-status=live |archive-url=https://web.archive.org/web/20230112114049/https://www.ptv.vic.gov.au/assets/PTV-default-site/Maps-and-Timetables-PDFs/Maps/Night-Network-maps/Night-Train-Map-SEPT-2021.pdf |archive-date=12 January 2023 |access-date=18 December 2022 |website=Public Transport Victoria}}</ref> | ||
[[File:G521 Leads G532 on Qube's Long Island Steel at Flinders Street.jpg|thumb|Qube Holdings's [[BlueScope]] steel train towards Long Island in May 2022]] | [[File:G521 Leads G532 on Qube's Long Island Steel at Flinders Street.jpg|thumb|Qube Holdings's [[BlueScope]] steel train towards Long Island in May 2022]] | ||
Freight operations occur (usually) twice-daily, with [[Qube Holdings]] operating services to the Long Island [[steel mill]]s and the Port of Hastings. Trains to Melbourne run approximately at 4 am and during the mid-afternoon, while trains from Melbourne run approximately at midnight and noon.<ref>{{Cite web |last=Wong |first=Marcus |date=2019-10-14 |title=Shipping steel on the Frankston line |url=https://wongm.com/2019/10/hastings-bluescope-steel-train-frankston-line/ |access-date=2023-02-11 |website=Waking up in Geelong |language=en-US}}</ref> | Freight operations occur (usually) twice-daily, with [[Qube Holdings]] operating services to the Long Island [[steel mill]]s and the Port of Hastings. Trains to Melbourne run approximately at 4 am and during the mid-afternoon, while trains from Melbourne run approximately at midnight and noon.<ref>{{Cite web |last=Wong |first=Marcus |date=2019-10-14 |title=Shipping steel on the Frankston line |url=https://wongm.com/2019/10/hastings-bluescope-steel-train-frankston-line/ |access-date=2023-02-11 |website=Waking up in Geelong |language=en-US}}</ref> | ||
| Line 199: | Line 199: | ||
The Frankston line has had a total of 7 operators since its opening in 1881. The majority of operations throughout its history have been government run: from its first service in 1881 until the 1999 privatisation of Melbourne's rail network, four different government operators have run the line.<ref name=":10">"Melbourne's Rail Network to be Split" ''[[Railway Digest]]'' November 1997 page 12</ref> These operators, [[Victorian Railways]], the [[Metropolitan Transit Authority (Victoria)|Metropolitan Transit Authority]], the [[Public Transport Corporation]], and Bayside Trains have a combined operational length of 118 years.<ref name=":10" /> | The Frankston line has had a total of 7 operators since its opening in 1881. The majority of operations throughout its history have been government run: from its first service in 1881 until the 1999 privatisation of Melbourne's rail network, four different government operators have run the line.<ref name=":10">"Melbourne's Rail Network to be Split" ''[[Railway Digest]]'' November 1997 page 12</ref> These operators, [[Victorian Railways]], the [[Metropolitan Transit Authority (Victoria)|Metropolitan Transit Authority]], the [[Public Transport Corporation]], and Bayside Trains have a combined operational length of 118 years.<ref name=":10" /> | ||
Bayside Trains was privatised in August 1999 and later rebranded [[M-Train|M>Train]]. In 2002, M>Train was placed into receivership and the state government regained ownership of the line, with [[KPMG]] appointed as receivers to operate M>Train on behalf of the state government.<ref>{{Cite web |last=Osborne |first=Alistair |date=17 December 2002 |title=National Express walks out of Australian rail service |url=https://www.telegraph.co.uk/finance/2836793/National-Express-walks-out-of-Australian-rail-service.html |access-date=2023-08-05 |website=www.telegraph.co.uk}}</ref><ref>[http://www.theage.com.au/articles/2002/12/23/1040511007915.html Receivers take over train, tram group] ''[[The Age]]'' 24 December 2002</ref><ref>{{Cite web | | Bayside Trains was privatised in August 1999 and later rebranded [[M-Train|M>Train]]. In 2002, M>Train was placed into receivership and the state government regained ownership of the line, with [[KPMG]] appointed as receivers to operate M>Train on behalf of the state government.<ref>{{Cite web |last=Osborne |first=Alistair |date=17 December 2002 |title=National Express walks out of Australian rail service |url=https://www.telegraph.co.uk/finance/2836793/National-Express-walks-out-of-Australian-rail-service.html |access-date=2023-08-05 |website=www.telegraph.co.uk}}</ref><ref>[http://www.theage.com.au/articles/2002/12/23/1040511007915.html Receivers take over train, tram group] ''[[The Age]]'' 24 December 2002</ref><ref>{{Cite web |author=<!--Staff writer(s); no by-line.--> Writer |date=2003-01-27 |title=Victorian passenger services get new managers |url=https://www.railexpress.com.au/victorian-passenger-services-get-new-managers/ |access-date=2023-08-05 |website=Rail Express |language=en-AU}}</ref> Two years later, rival train operator [[Connex Melbourne]] took over the M>Train operations including the Frankston line. [[Metro Trains Melbourne]], the current private operator, then took over the operations in 2009. The private operators have had a combined operational period of {{Age|1999|08|29}} years.<ref>{{Cite web |last=Cooper |first=Mex |date=25 June 2009 |title=New train, tram operators for Melbourne |url=https://www.theage.com.au/national/new-train-tram-operators-for-melbourne-20090625-cxgx.html |url-status=live |archive-url=https://web.archive.org/web/20230101122206/https://www.theage.com.au/national/new-train-tram-operators-for-melbourne-20090625-cxgx.html |archive-date=1 January 2023 |access-date=1 January 2023 |website=The Age}}</ref> | ||
{| class="wikitable" | {| class="wikitable" | ||
|+Past and present operators of the Frankston line: | |+Past and present operators of the Frankston line: | ||
| Line 649: | Line 649: | ||
=== Rolling stock === | === Rolling stock === | ||
{{Main|X'Trapolis 100|Siemens Nexas|Comeng (train)|l3 = Comeng}}[[File:Metro Trains Comeng at McKinnon.jpg|thumb|A Comeng train arriving into the old [[McKinnon railway station|McKinnon station]] prior to its 2016 rebuild|alt=An old train (comeng) travelling along tracks in McKinnon|left]]The Frankston line uses three different types of [[electric multiple unit]] (EMU) trains that are operated in a split six-car configuration, with three doors per side on each carriage. The primary rolling stock featured on the line is the [[Comeng (train)|Comeng]] EMUs, built by [[Commonwealth Engineering]] between 1981 and 1988.<ref>{{Cite web |last=Johnston |first=Matt |date=March 13, 2009 |title=Commuters get to try new look Connex trains |url=http://www.heraldsun.com.au/commuters-take-pole-position/story-fna7dq6e-1111119116347 |url-status=dead |archive-url=https://archive.today/20120908211425/http://www.heraldsun.com.au/commuters-take-pole-position/story-fna7dq6e-1111119116347 |archive-date=8 Sep 2012 |access-date=2023-02-06 |website= | {{Main|X'Trapolis 100|Siemens Nexas|Comeng (train)|l3 = Comeng}}[[File:Metro Trains Comeng at McKinnon.jpg|thumb|A Comeng train arriving into the old [[McKinnon railway station|McKinnon station]] prior to its 2016 rebuild|alt=An old train (comeng) travelling along tracks in McKinnon|left]]The Frankston line uses three different types of [[electric multiple unit]] (EMU) trains that are operated in a split six-car configuration, with three doors per side on each carriage. The primary rolling stock featured on the line is the [[Comeng (train)|Comeng]] EMUs, built by [[Commonwealth Engineering]] between 1981 and 1988.<ref>{{Cite web |last=Johnston |first=Matt |date=March 13, 2009 |title=Commuters get to try new look Connex trains |url=http://www.heraldsun.com.au/commuters-take-pole-position/story-fna7dq6e-1111119116347 |url-status=dead |archive-url=https://archive.today/20120908211425/http://www.heraldsun.com.au/commuters-take-pole-position/story-fna7dq6e-1111119116347 |archive-date=8 Sep 2012 |access-date=2023-02-06 |website=Herald Sun}}</ref> These train sets are the oldest on the Melbourne rail network and subsequently will be replaced by the mid-2030s.<ref>{{Cite web |last=Jacks |first=Timna |date=2021-05-18 |title=Ballarat plant bags $1b contract for 25 new Melbourne trains |url=https://www.theage.com.au/national/victoria/ballarat-plant-bags-1b-contract-for-25-new-melbourne-trains-20210518-p57svs.html |access-date=2023-02-06 |website=The Age |language=en}}</ref> [[Siemens Nexas]] EMUs are also widely featured on the line, originally built between 2002 and 2005 these train sets feature more modern technology than the Comeng trains.<ref>{{Cite web |date=2005-11-22 |title=Siemens AG – Siemens Transportation Systems wins major contract in Australia |url=http://www.siemens.com/page/1,3771,226112-1-18_0_0-0,00.html |access-date=2023-02-06 |archive-url=https://web.archive.org/web/20051122043434/http://www.siemens.com/page/1,3771,226112-1-18_0_0-0,00.html |archive-date=22 November 2005 }}</ref> The final type of rolling stock featured on the line is the [[X'Trapolis 100]] built by [[Alstom]] between 2002 and 2004, and 2009 and 2020.<ref name=":18">{{Cite web |last=Carey |first=Adam |date=2014-11-07 |title=Trains are working better but seating not guaranteed |url=https://www.smh.com.au/national/trains-are-working-better-but-seating-not-guaranteed-20141107-11ifm4.html |access-date=2023-02-06 |website=The Sydney Morning Herald |language=en}}</ref> All of these rolling stock models are widely used on other lines across the metropolitan network and work as the backbone of the network. | ||
Alongside the passenger trains, Frankston line tracks and equipment are maintained by a fleet of engineering trains. The four types of engineering trains are: the shunting train; designed for moving trains along non-electrified corridors and for transporting other maintenance locomotives, for track evaluation; designed for evaluating track and its condition, the overhead inspection train; designed for overhead wiring inspection, and the infrastructure evaluation carriage designed for general infrastructure evaluation.<ref name=":17">{{Cite web |date=1 February 2011 |title=NETWORK SERVICE PLAN {{!}} Addenda |url=https://www.vline.com.au/pdf/networkaccess/networkserviceplan/addenda.pdf/addenda |url-status=dead |archive-url=https://web.archive.org/web/20110307165249/https://www.vline.com.au/pdf/networkaccess/networkserviceplan/addenda.pdf/addenda |archive-date=7 March 2011 |website=V/Line}}</ref> Most of these trains are repurposed locomotives previously used by [[V/Line]], Metro Trains, and the [[Southern Shorthaul Railroad]].<ref name=":17" /> | Alongside the passenger trains, Frankston line tracks and equipment are maintained by a fleet of engineering trains. The four types of engineering trains are: the shunting train; designed for moving trains along non-electrified corridors and for transporting other maintenance locomotives, for track evaluation; designed for evaluating track and its condition, the overhead inspection train; designed for overhead wiring inspection, and the infrastructure evaluation carriage designed for general infrastructure evaluation.<ref name=":17">{{Cite web |date=1 February 2011 |title=NETWORK SERVICE PLAN {{!}} Addenda |url=https://www.vline.com.au/pdf/networkaccess/networkserviceplan/addenda.pdf/addenda |url-status=dead |archive-url=https://web.archive.org/web/20110307165249/https://www.vline.com.au/pdf/networkaccess/networkserviceplan/addenda.pdf/addenda |archive-date=7 March 2011 |website=V/Line}}</ref> Most of these trains are repurposed locomotives previously used by [[V/Line]], Metro Trains, and the [[Southern Shorthaul Railroad]].<ref name=":17" /> | ||
| Line 660: | Line 660: | ||
In compliance with the [[Disability Discrimination Act 1992|Disability Discrimination Act of 1992]], all stations that are new-built or rebuilt are fully accessible and comply with these guidelines.<ref>{{Cite web |title=Accessibility – Public Transport Ombudsman Victoria |url=https://www.ptovic.com.au/improving-pt/accessibility |url-status=live |archive-url=https://web.archive.org/web/20230103084345/https://www.ptovic.com.au/improving-pt/accessibility |archive-date=3 January 2023 |access-date=3 January 2023 |website=www.ptovic.com.au}}</ref> The majority of stations on the corridor are fully accessible, however, some stations have not been upgraded.<ref name=":12">{{Cite web |date=2023 |title=Station accessibility features |url=https://www.metrotrains.com.au/station-accessibility-features/ |url-status=live |archive-url=https://web.archive.org/web/20221208020143/https://www.metrotrains.com.au/station-accessibility-features/ |archive-date=8 December 2022 |access-date=3 January 2023 |website=Metro Trains Melbourne}}</ref> These stations do feature ramps, however, they have a gradient greater than 1 in 14.<ref name=":12" /> Stations that are fully accessible feature ramps that have a gradient less than 1 in 14, have at-grade paths, or feature lifts.<ref name=":12" /> These stations typically also feature [[Tactile paving|tactile boarding indicators]], independent boarding ramps, wheelchair accessible [[myki]] barriers, [[Audio induction loop|hearing loops]], and widened paths.<ref name=":12" /><ref>{{Cite web |date=n.d. |title=Accessing public transport |url=https://www.melbourne.vic.gov.au/community/health-support-services/accessing-melbourne/Pages/public-transport.aspx |url-status=live |archive-url=https://web.archive.org/web/20221206144538/https://www.melbourne.vic.gov.au/community/health-support-services/accessing-melbourne/Pages/public-transport.aspx |archive-date=6 December 2022 |access-date=3 January 2023 |website=City of Melbourne}}</ref> | In compliance with the [[Disability Discrimination Act 1992|Disability Discrimination Act of 1992]], all stations that are new-built or rebuilt are fully accessible and comply with these guidelines.<ref>{{Cite web |title=Accessibility – Public Transport Ombudsman Victoria |url=https://www.ptovic.com.au/improving-pt/accessibility |url-status=live |archive-url=https://web.archive.org/web/20230103084345/https://www.ptovic.com.au/improving-pt/accessibility |archive-date=3 January 2023 |access-date=3 January 2023 |website=www.ptovic.com.au}}</ref> The majority of stations on the corridor are fully accessible, however, some stations have not been upgraded.<ref name=":12">{{Cite web |date=2023 |title=Station accessibility features |url=https://www.metrotrains.com.au/station-accessibility-features/ |url-status=live |archive-url=https://web.archive.org/web/20221208020143/https://www.metrotrains.com.au/station-accessibility-features/ |archive-date=8 December 2022 |access-date=3 January 2023 |website=Metro Trains Melbourne}}</ref> These stations do feature ramps, however, they have a gradient greater than 1 in 14.<ref name=":12" /> Stations that are fully accessible feature ramps that have a gradient less than 1 in 14, have at-grade paths, or feature lifts.<ref name=":12" /> These stations typically also feature [[Tactile paving|tactile boarding indicators]], independent boarding ramps, wheelchair accessible [[myki]] barriers, [[Audio induction loop|hearing loops]], and widened paths.<ref name=":12" /><ref>{{Cite web |date=n.d. |title=Accessing public transport |url=https://www.melbourne.vic.gov.au/community/health-support-services/accessing-melbourne/Pages/public-transport.aspx |url-status=live |archive-url=https://web.archive.org/web/20221206144538/https://www.melbourne.vic.gov.au/community/health-support-services/accessing-melbourne/Pages/public-transport.aspx |archive-date=6 December 2022 |access-date=3 January 2023 |website=City of Melbourne}}</ref> | ||
Projects improving station accessibility have included the Level Crossing Removal Project, which involves station rebuilds and upgrades and other individual station upgrade projects.<ref>{{Cite web |date=12 June 2022 |title=Left behind: the fight for accessible public transport in Victoria |url=https://www.theguardian.com/australia-news/2022/jun/13/left-behind-the-fight-for-accessible-public-transport-in-victoria |url-status=live |archive-url=https://web.archive.org/web/20230103084335/https://www.theguardian.com/australia-news/2022/jun/13/left-behind-the-fight-for-accessible-public-transport-in-victoria |archive-date=3 January 2023 |access-date=3 January 2023 |website= | Projects improving station accessibility have included the Level Crossing Removal Project, which involves station rebuilds and upgrades and other individual station upgrade projects.<ref>{{Cite web |date=12 June 2022 |title=Left behind: the fight for accessible public transport in Victoria |url=https://www.theguardian.com/australia-news/2022/jun/13/left-behind-the-fight-for-accessible-public-transport-in-victoria |url-status=live |archive-url=https://web.archive.org/web/20230103084335/https://www.theguardian.com/australia-news/2022/jun/13/left-behind-the-fight-for-accessible-public-transport-in-victoria |archive-date=3 January 2023 |access-date=3 January 2023 |website=The Guardian}}</ref><ref>{{Cite web |date=17 October 2022 |title=Urban design framework |url=https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/about/urban-design-framework |url-status=live |archive-url=https://web.archive.org/web/20230103084334/https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/about/urban-design-framework |archive-date=3 January 2023 |access-date=3 January 2023 |website=Victoria’s Big Build}}</ref> These works have made significant strides in improving network accessibility, with more than 68% of Frankston line stations classed as fully accessible. This number is expected to grow within the coming years with the completion of level crossing removal works on the corridor by 2029.<ref>{{Cite web |title=Growing Our Rail Network 2018–2025 |url=https://www.ptv.vic.gov.au/footer/legal-and-policies/growing-our-rail-network-2018-2025/ |url-status=live |archive-url=https://web.archive.org/web/20190812025052/https://www.ptv.vic.gov.au/footer/legal-and-policies/growing-our-rail-network-2018-2025/ |archive-date=12 August 2019 |access-date=3 January 2023 |website=Public Transport Victoria}}</ref> | ||
=== Signalling === | === Signalling === | ||
Latest revision as of 22:26, 19 June 2025
Template:Short description Template:Good article Template:Use dmy dates Template:Use Australian English Template:Infobox rail service The Frankston line is a commuter railway line in the city of Melbourne, Victoria, Australia.[1] Operated by Metro Trains Melbourne, it is the city's third-longest metropolitan railway line, at Template:Convert. The line runs from Flinders Street station in central Melbourne to Frankston station in the south-east, serving 28 stations via South Yarra, Caulfield, Moorabbin, and Mordialloc.[2] The line continues to Stony Point on the non-electrified Stony Point line. The line operates for approximately 20 hours a day (from approximately 4:00 am to around 11:30 pm) with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 5 to 10 minutes are operated with services every 10–20 minutes during off-peak hours.[3] Trains on the Frankston line run with a two three-car formations of Comeng, Siemens Nexas, and X'Trapolis 100 trainsets.[4]
Sections of the Frankston line opened as early as 1881, with the line fully extended to Frankston in 1882. A limited number of stations were first opened, with infill stations progressively opened between 1881 and 2017.[5] The line was built to connect Melbourne with the rural towns of Caulfield, Moorabbin, and Frankston, amongst others. Significant growth has occurred since opening, with a plan to extend the Frankston line along part of the Stony Point line to Baxter.[6]
Since the 2010s, due to the heavily utilised infrastructure of the Frankston line, significant improvements and upgrades have been made. Different packages of works have upgraded the corridor to replace sleepers, upgrading signalling technology, the introduction of new rolling stock, and the removal of all level crossings.[7]
History
19th century
In 1881, the Frankston line began operations by the Victorian Railways on a single tracked line from Caulfield to Mordialloc.[8] Mordialloc station was officially opened on 19 December 1881 by Sir Thomas Bent, who was the Minister of Railways, and later becoming the Premier of Victoria between 1904 and 1909.[8][9] The first train to arrive at Mordialloc was a special service from Princes Bridge, which collected school children from the Brighton area. Further specials occurred during the day, with proper timetabled services commencing the following day. Six services were provided upon opening and, apart from two services, all were shuttle services operating between Caulfield and Mordialloc.[8]
In August 1882, operations were extended from Mordialloc to Frankston.[10] The section of track from Caulfield to Mordialloc was duplicated in 1888.[11] In 1883 the line between Richmond station and South Yarra was quadrupled to accommodate an increase in train services due to the opening of Frankston and Sandringham lines.[12]
In 1885, a number of level crossing removal works occurred between Flinders Street station and South Yarra due to an increase in freight and passenger operations.[13] These crossings were removed through a combination of lowering and raising the corridor.[13]
20th century
In 1910, the remaining track from Mordialloc to Frankston was duplicated. In 1915, the line between South Yarra and Caulfield was quadrupled, as part of level crossing removal works. This section of the line was lowered into a cutting to eliminate numerous level crossings.[14] Power signalling was provided between Richmond and Hawksburn at the same time, then on to Caulfield in 1921.[15]
Electrification of the line to Frankston occurred in three stages during 1922. In March 1922, the section from South Yarra to Glen Huntly station was electrified, with the section to Mordialloc being electrified in June 1922, and the final section to Frankston being completed by August 1922.[16][17] The electrification of the line allowed for the introduction of Swing Door electric multiple unit trains for the first time.[16][18]
The introduction of power signalling on the line begun in 1933 with the section from Caulfield to Glen Huntly, with the remainder of the line converted in stages from 1958 to 1986.[15] The current bridge over the Patterson River was provided in 1974, replacing the previous trestle bridge.[19] Triplication of the line from Caulfield to Moorabbin from two to three tracks was announced by Transport Minister Steve Crabb in 1984, at a cost of A$10 million. Construction of the additional track was designed to increase peak hour capacity and to provide express services on the corridor, with time savings of more than 10 minutes from Frankston. Work begun in July that year with a completion by the end of 1985.[20] The introduction of services on the new track was delayed by two years till June 1987.[21] Further plans announced in the 1970s included the extension of the third track to Mordialloc, however, these plans failed to materialise.[22]
In 1981, Frankston line services commenced operations through the City Loop, after previously terminating at Flinders or Spencer Street stations.[23] The commencement of operations involved the service stopping at three new stations—Parliament, Melbourne Central (formally Museum), and Flagstaff.[24] The Loop follows La Trobe and Spring Streets along the northern and eastern edges of the Hoddle Grid.[25] The Loop connects with Melbourne's two busiest stations, Flinders Street and Southern Cross, via the elevated Flinders Street Viaduct.[25]
21st century
Script error: No such module "Labelled list hatnote".
A 2007, restructure of train ticketing in Melbourne involved the removal of Zone 3, with Zone 3 stations being re-classified to Zone 2.[26] This brought the cost of train fares down, improving system accessibility to the public. All stations between Patterson and Frankston were rezoned to Zone 2.[27]
At the 2010 state election, both the Labor Party and the Liberal Party promised to provide a new Premium station between Highett and Cheltenham, to serve the Westfield Southland shopping centre.[28] The station was projected to cost $13 million, and would have two platforms, an information booth, and shelters with a projected usage of 1,400 passengers daily. The project was scheduled to be completed by 2014, however, no progress was made till after the 2014 state election.[29] The new station opened on 26 November 2017 as Southland station.[30] In 2013, the line, along with the Werribee and Williamstown lines, were upgraded as part of the Bayside Rail Project. The upgrade included station refurbishments, track, signal, and electrical upgrades to allow X'Trapolis trains to operate on these lines.[31]
In 2021, the metropolitan timetable underwent a major rewrite, resulting in all Frankston line trains operating direct between Richmond and Flinders Street before continuing onto the Werribee and Williamstown lines. Under these changes, Frankston services no longer operate via the City Loop, with an additional 45 new services each week.[32] The additional services upgraded frequencies to a train every 5 minutes in peak hour, every 10 minutes throughout the day, and every 20 minutes until midnight.[32]
Future
Level Crossing Removals
The Level Crossing Removal Project has announced the removal of all 23 remaining level crossings on the Frankston line, to be completed in stages from 2016 to 2029.[7] Different removal packages have been announced in 2014, 2018, and 2022 to coincide with different state elections and to be delivered in stages up until 2029.[33][34][7] All of the various removals have involved the rail under or rail over methods, with some crossing closures also undertaken by the Project. At the conclusion of the project, all level crossings between the city and Frankston station will be full grade operated through a variety of methods.[7]
Return to City Loop
Script error: No such module "Labelled list hatnote".
When the new cross-city rail corridor being built by the Metro Tunnel opens in 2025 there will be a reorganisation of the Melbourne rail network.[35] The Victorian Department of Transport and Planning plans to return the Frankston line to the City Loop, with dedicated use of the Caulfield group tunnel track.[36] This will mean Frankston line trains will no longer through-run with Werribee and Williamstown line trains, and will again stop at City Loop stations Flagstaff, Melbourne Central and Parliament.[36] Werribee and Williamstown services would instead continue onto the Sandringham line.[36]
Stage 4 of the Network Development Plan – Metropolitan Rail proposed that the Craigieburn and Frankston lines be joined via a reconfigured City Loop sometime in the 2030s.[37]
Baxter Extension
In 2013, as part of Public Transport Victoria's Network Development Plan for metropolitan rail, an extension of the Frankston line to Baxter was earmarked to begin in the "long-term", which would equate to at least 2033. The proposal would link Frankston to Baxter through an electrified dual-line following the Stony Point line.[38] In 2018, the Liberal Party announced a project to extend electrified services to Baxter during the 2018 state election.[39] The project would have included the removal of all crossings between Frankston and Baxter, duplication and electrification works, the reconstruction and redevelopment of the stations at Leawarra and Langwarrin respectively to facilitate electrification.[40][41]
The Federal Liberals announced $450 million of joint funding for the project promised between the state and federal governments.[40] The incumbent Andrews Labor government argued that the project was not needed, instead prioritising funding to other projects across the state.[40] A business case commissioned by the government was completed in 2019 with no further progress being made.[6]
Again in the lead up to the 2022 state election, the Liberal opposition supported the electrification to Baxter.[42] The incumbent Andrews government made no commitments to the Baxter rail extension, instead continuing construction on level crossing removal works along the Frankston line.[42] The 2022 state election resulted in another Labor victory, with the Andrews government pushing ahead with these works, with the extension to Baxter remaining stagnant ever since.
Network and operations
Services
Services on the Frankston line operates from approximately 4:00 am to around 11:30 daily.[17] In general, during peak hours, train frequency is 10 minutes during the peak period while services during non-peak hours drops to 10–20 minutes throughout the entire route.[3] Rather than running through the City Loop, services continue onto the Werribee (express or via the Altona Loop) or Williamstown lines (with varying frequencies).[38] On Friday nights and weekends, services run 24 hours a day, with 60 minute frequencies available outside of normal operating hours.[43]
Freight operations occur (usually) twice-daily, with Qube Holdings operating services to the Long Island steel mills and the Port of Hastings. Trains to Melbourne run approximately at 4 am and during the mid-afternoon, while trains from Melbourne run approximately at midnight and noon.[44]
Train services on the Frankston line are also subjected to maintenance and renewal works, usually on selected Fridays and Saturdays. Shuttle bus services are provided throughout the duration of works for affected commuters.[45]
Stopping patterns
Legend — Station Status
- ◼ Premium Station – Station staffed from first to last train
- ◻ Host Station – Usually staffed during morning peak, however this can vary for different stations on the network.
Legend — Stopping Patterns
Services do not operate via the City Loop
- ● – All trains stop
- ◐ – Some services do not stop
- ▲ – Only inbound trains stop
- ▼ – Only outbound trains stop
- | – Trains pass and do not stop
| colspan="7" style="background:#Template:Rcr;" |Frankston Services[46] | ||||||
|---|---|---|---|---|---|---|
| Station | Zone | Local | Ltd Express | Carrum | Mordialloc | Cheltenham |
| ◼ Template:Rwsa | 1 | ◐ | ◐ | ◐ | ◐ | ◐ |
| ◼ Template:Rwsa | ● | ● | ● | ▼ | ● | |
| ◼ Template:Rwsa | ● | ● | ● | ▼ | ● | |
| ◼ Template:Rwsa | ● | ● | ● | ▼ | ● | |
| Template:Htxt Template:Rwsa | ● | ● | ▼ | ● | ||
| Template:Htxt Template:Rwsa | ● | ● | ▼ | ● | ||
| ◻ Template:Rwsa | ● | ● | ▼ | ● | ||
| ◻ Template:Rwsa | ● | ▲ | ● | ▼ | ● | |
| ◼ Template:Rwsa | ● | ● | ● | ▼ | ● | |
| ◻ Template:Rwsa | ● | ● | ▼ | ● | ||
| ◻ Template:Rwsa | 1/2 | ● | ● | ▼ | ● | |
| Template:Htxt Template:Rwsa | ● | ● | ▼ | ● | ||
| ◼ Template:Rwsa | ● | ● | ▼ | ● | ||
| Template:Htxt Template:Rwsa | 2 | ● | ● | ▼ | ● | |
| ◼ Template:Rwsa | ● | ● | ▼ | ● | ||
| Template:Htxt Template:Rwsa | ● | ● | ▼ | ● | ||
| ◻ Template:Rwsa | ● | ● | ▼ | ● | ||
| ◼ Template:Rwsa | ● | ● | ● | ▼ | ● | |
| ◼ Template:Rwsa | ● | ● | ● | ▼ | ||
| Template:Htxt Template:Rwsa | ● | ● | ● | ▼ | ||
| ◼ Template:Rwsa | ● | ● | ● | ▼ | ||
| Template:Htxt Template:Rwsa | ● | ● | ● | |||
| Template:Htxt Template:Rwsa | ● | ● | ● | |||
| Template:Htxt Template:Rwsa | ● | ● | ● | |||
| Template:Htxt Template:Rwsa | ● | ● | ● | |||
| ◼ Template:Rwsa | ● | ● | ● | |||
| Template:Htxt Template:Rwsa | ● | ● | ||||
| Template:Htxt Template:Rwsa | ● | ● | ||||
| ◼ Template:Rwsa | ● | ● |
Operators
The Frankston line has had a total of 7 operators since its opening in 1881. The majority of operations throughout its history have been government run: from its first service in 1881 until the 1999 privatisation of Melbourne's rail network, four different government operators have run the line.[47] These operators, Victorian Railways, the Metropolitan Transit Authority, the Public Transport Corporation, and Bayside Trains have a combined operational length of 118 years.[47]
Bayside Trains was privatised in August 1999 and later rebranded M>Train. In 2002, M>Train was placed into receivership and the state government regained ownership of the line, with KPMG appointed as receivers to operate M>Train on behalf of the state government.[48][49][50] Two years later, rival train operator Connex Melbourne took over the M>Train operations including the Frankston line. Metro Trains Melbourne, the current private operator, then took over the operations in 2009. The private operators have had a combined operational period of Script error: No such module "age". years.[51]
| Operator | Assumed operations | Ceased operations | Length of operations |
|---|---|---|---|
| Victorian Railways | 1881 | 1983 | 102 years |
| Metropolitan Transit Authority | 1983 | 1989 | 6 years |
| Public Transport Corporation | 1989 | 1998 | 9 years |
| Bayside Trains (government operator) | 1998 | 1999 | 1 years |
| M>Train | 1999 | 2004 | 5 years |
| Connex Melbourne | 2004 | 2009 | 5 years |
| Metro Trains Melbourne | 2009 | incumbent | Script error: No such module "age". years (ongoing) |
Route
Template:Frankston LineTemplate:Maplink Template:Infobox rail line
The Frankston line forms a somewhat linear route from the Melbourne central business district to its terminus in Frankston. The route is Template:Convert long and is predominantly doubled tracked, however between Flinders Street station and Richmond, the track is widened to 12 tracks, narrowing to 6 tracks between Richmond and South Yarra before again narrowing to 4 tracks between South Yarra and Caulfield.[52] After Caulfield station, the track again narrows to 3 tracks, which is remain till Moorabbin when the track narrows to two tracks. The centre track is signalled for bidirectional operation, allowing for express trains overtaking stopping trains in the peak direction. After changing from Werribee and Williamstown services at Flinders Street, Frankston line traverses mainly flat country with few curves and fairly minimal earthworks for most of the line. However, between South Yarra and Malvern, the rail corridor has been lowered into a cutting to eliminate level crossings, and between Malvern and Caulfield, the corridor has been raised on an embankment for the same reason.[53] After Caulfield, the line formerly had numerous level crossings, however, all have now been abolished through numerous rail trenches and rail bridges.[7] Remaining level crossings on the line will be removed by 2029 under other level crossing removal works.
The line follows the same alignment as the Cranbourne and Pakenham lines with the three services splitting onto different routes at Caulfield. The Frankston line continues on its south eastern alignment, whereas the Cranbourne and Pakenham lines takes an eastern alignment towards their final destinations.[54] From Mentone, the line is never more than ~Template:Convert from the eastern shore of Port Phillip Bay, and runs alongside the Nepean Highway for much of its length. At Frankston station, electrified services terminate with Metro Trains operated diesel services continuing to Stony Point.[55] Most of the rail line goes through built-up suburbs and some industrial areas, with small sections of the line passing through more open countryside, passing by open fields and farms.[54]
Stations
The line serves 28 stations across the length of the line. The stations are a mix of elevated, lowered, underground, and ground level designs. Underground stations are present only in the City Loop, with the majority of elevated and lowered stations being constructed as part of level crossing removals.[56] From 2023, Glen Huntly station will be lowered as part of level crossing removal works. In 2025, Parkdale station will be elevated, with Highett, Mordialloc, and Seaford stations being elevated from 2029 for similar works. Aspendale station will also be lowered from 2029.[57]
Infrastructure
Rolling stock
Script error: No such module "Labelled list hatnote".
The Frankston line uses three different types of electric multiple unit (EMU) trains that are operated in a split six-car configuration, with three doors per side on each carriage. The primary rolling stock featured on the line is the Comeng EMUs, built by Commonwealth Engineering between 1981 and 1988.[59] These train sets are the oldest on the Melbourne rail network and subsequently will be replaced by the mid-2030s.[60] Siemens Nexas EMUs are also widely featured on the line, originally built between 2002 and 2005 these train sets feature more modern technology than the Comeng trains.[61] The final type of rolling stock featured on the line is the X'Trapolis 100 built by Alstom between 2002 and 2004, and 2009 and 2020.[4] All of these rolling stock models are widely used on other lines across the metropolitan network and work as the backbone of the network.
Alongside the passenger trains, Frankston line tracks and equipment are maintained by a fleet of engineering trains. The four types of engineering trains are: the shunting train; designed for moving trains along non-electrified corridors and for transporting other maintenance locomotives, for track evaluation; designed for evaluating track and its condition, the overhead inspection train; designed for overhead wiring inspection, and the infrastructure evaluation carriage designed for general infrastructure evaluation.[62] Most of these trains are repurposed locomotives previously used by V/Line, Metro Trains, and the Southern Shorthaul Railroad.[62]
Planned rolling stock
Script error: No such module "Labelled list hatnote".From the middle of 2020s, the next generation of the X'Trapolis family of electric EMUs—the X'Trapolis 2.0—will be introduced. This new model will fully replace the existing fleet of Comeng EMUs currently operating on the line currently with new, modern, and technologically advanced trains. The new trains will include features designed to increase passenger comfort like quicker doors, allowing for reduced boarding times, passenger information systems to display relevant information about the train and its journey, designated bicycle storage areas, and 6 cars that are fully walk through.[63] For reliability, the trains have a higher energy efficiency to work with a lower network voltage.[63] Finally, accessibility is improved through new interior designs featuring fold-up seating to allow additional space for wheelchair users and passenger operated automatic wheelchair ramps (located behind the two driver cabs).[63]
Accessibility
In compliance with the Disability Discrimination Act of 1992, all stations that are new-built or rebuilt are fully accessible and comply with these guidelines.[64] The majority of stations on the corridor are fully accessible, however, some stations have not been upgraded.[65] These stations do feature ramps, however, they have a gradient greater than 1 in 14.[65] Stations that are fully accessible feature ramps that have a gradient less than 1 in 14, have at-grade paths, or feature lifts.[65] These stations typically also feature tactile boarding indicators, independent boarding ramps, wheelchair accessible myki barriers, hearing loops, and widened paths.[65][66]
Projects improving station accessibility have included the Level Crossing Removal Project, which involves station rebuilds and upgrades and other individual station upgrade projects.[67][68] These works have made significant strides in improving network accessibility, with more than 68% of Frankston line stations classed as fully accessible. This number is expected to grow within the coming years with the completion of level crossing removal works on the corridor by 2029.[69]
Signalling
The Frankston line uses three position signalling which is widely used across the Melbourne train network.[70] Three position signalling was first introduced in 1915, with the final section of the line converted to the new type of signalling in 1976.[71]
References
External links
Template:Victorian Railway Lines
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ a b c d e f g h i j k l m n o p q r s t u v Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ a b c d e Script error: No such module "citation/CS1".
- ↑ a b c Template:Cite magazine
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Fisher, Peter (2007). Victorian Signalling: by Accident or Design?. Australian Railway Historical Society (Victorian Division). Template:Isbn
- ↑ a b Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ S.E. Dornan and R.G. Henderson: (1979) The Electric Railways of Victoria
- ↑ Template:Cite magazine
- ↑ Template:Cite magazine
- ↑ Template:Cite magazine
- ↑ Template:Cite magazine
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b c Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ State Liberal leader Matthew Guy supports duplication, electrification of rail line to Baxter Template:Webarchive Herald Sun 26 January 2018
- ↑ a b c Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b "Melbourne's Rail Network to be Split" Railway Digest November 1997 page 12
- ↑ Script error: No such module "citation/CS1".
- ↑ Receivers take over train, tram group The Age 24 December 2002
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b c Template:Anderson-All Stations
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ a b c Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b c d Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- Pages with script errors
- Pages with broken file links
- Railway lines in Melbourne
- Railway lines opened in 1882
- Frankston, Victoria
- 1882 establishments in Australia
- Transport in the City of Frankston
- Public transport routes in the City of Melbourne (LGA)
- Transport in the City of Bayside
- Transport in the City of Kingston (Victoria)
- Transport in the City of Glen Eira
- Transport in the City of Stonnington
- Transport in the City of Yarra
- 1500 V DC railway electrification