STS-92: Difference between revisions
imported>Tigerdude9 →Mission highlights: Scrub 2 was due to weather. |
imported>RGKMA |
||
| Line 21: | Line 21: | ||
| landing_site = [[Edwards Air Force Base|Edwards]], Runway{{nbsp}}22 | | landing_site = [[Edwards Air Force Base|Edwards]], Runway{{nbsp}}22 | ||
| crew_size = 7 | | crew_size = 7 | ||
| crew_members = {{Unbulleted list|[[Brian Duffy (astronaut)|Brian Duffy]]|[[Pamela A. Melroy]]|[[Koichi Wakata]]|[[William S. McArthur]]|[[Peter J.K. Wisoff]]|[[Michael López-Alegría]]|[[Leroy Chiao]]}} | | crew_members = {{Unbulleted list|[[Brian Duffy (astronaut)|Brian Duffy]]|[[Pamela A. Melroy]]|[[Koichi Wakata]]|[[William S. McArthur]]|[[Peter J. K. Wisoff]]|[[Michael López-Alegría]]|[[Leroy Chiao]]}} | ||
| crew_EVAs = 4 | | crew_EVAs = 4 | ||
| crew_EVA_duration = {{Unbulleted list | | crew_EVA_duration = {{Unbulleted list | ||
| Line 31: | Line 31: | ||
}} | }} | ||
| crew_photo = STS-92 crew.jpg | | crew_photo = STS-92 crew.jpg | ||
| crew_photo_caption = From left: [[Leroy Chiao|Chiao]], [[Pamela A. Melroy|Melroy]], [[Michael López-Alegría|Lopez-Alegria]], [[William S. McArthur|McArthur]], [[Peter J.K. Wisoff|Wisoff]], [[Brian Duffy (astronaut)|Duffy]] and [[Koichi Wakata|Wakata]] | | crew_photo_caption = From left: [[Leroy Chiao|Chiao]], [[Pamela A. Melroy|Melroy]], [[Michael López-Alegría|Lopez-Alegria]], [[William S. McArthur|McArthur]], [[Peter J. K. Wisoff|Wisoff]], [[Brian Duffy (astronaut)|Duffy]] and [[Koichi Wakata|Wakata]] | ||
| docking = {{Infobox spaceflight/Dock | | docking = {{Infobox spaceflight/Dock | ||
| docking_target = [[International Space Station|ISS]] | | docking_target = [[International Space Station|ISS]] | ||
| Line 70: | Line 70: | ||
|flights4_up = Third | |flights4_up = Third | ||
|position5 = Mission Specialist 3 | |position5 = Mission Specialist 3 | ||
|crew5_up = {{flagicon|USA}} [[Peter J.K. Wisoff]]<ref name="ap-20001019" /> | |crew5_up = {{flagicon|USA}} [[Peter J. K. Wisoff]]<ref name="ap-20001019" /> | ||
|flights5_up = Fourth and last | |flights5_up = Fourth and last | ||
|position6 = Mission Specialist 4 | |position6 = Mission Specialist 4 | ||
Latest revision as of 02:13, 2 June 2025
Template:Short description Template:Use dmy dates Template:Infobox spaceflight STS-92 was a Space Shuttle mission to the International Space Station[1] (ISS) flown by Space Shuttle Discovery. STS-92 marked the 100th mission of the Space Shuttle and Discovery's 28th flight. It was launched from Kennedy Space Center, Florida, 11 October 2000.[2]
Crew
Spacewalks
- EVA 1
- Personnel: Chiao and McArthur
- Start: 15 October 2000 – 14:27 UTC
- End: 15 October 2000 – 20:55 UTC
- Duration: 6 hours, 28 minutes[3]
- EVA 2
- Personnel: López-Alegría and Wisoff
- Start: 16 October 2000 – 14:15 UTC
- End: 16 October 2000 – 21:22 UTC
- Duration: 7 hours, 7 minutes[4]
- EVA 3
- Personnel: Chiao and McArthur
- Start: 17 October 2000 – 14:30 UTC
- EVA 3 End: 17 October 2000 – 21:18 UTC
- Duration: 6 hours, 48 minutes[5]
- EVA 4
- Personnel: López-Alegría and Wisoff
- Start: 18 October 2000 – 15:00 UTC
- End: 18 October 2000 – 21:56 UTC
- Duration: 6 hours, 56 minutes[6]
Crew seat assignments
| Seat[7] | Launch | Landing | File:Space Shuttle seating plan.svg Seats 1–4 are on the flight deck. Seats 5–7 are on the mid-deck. |
|---|---|---|---|
| 1 | Duffy | ||
| 2 | Melroy | ||
| 3 | Wakata | Lopez-Alegria | |
| 4 | McArthur | ||
| 5 | Wisoff | ||
| 6 | Lopez-Alegria | Wakata | |
| 7 | Chiao | ||
Mission highlights
STS-92 was an ISS assembly flight that brought the Z1 truss, Control Moment Gyros, Pressurized Mating Adapter-3 (PMA-3) (mounted on a Spacelab pallet) and two DDCU (Heat pipes) to the space station.[1][8] The Z1 truss was the first exterior framework installed on the ISS and allowed the first U.S. solar arrays to be temporarily installed on Unity for early power during flight 4A. The Ku-band communication system supported early science capabilities and U.S. television on flight 6A. The CMGs (Control Moment Gyros) weigh about Template:Convert and provide non-propulsive (electrically powered) attitude control when activated on flight 5A, and PMA-3 provides shuttle docking port for solar array installation on flight 4A and Destiny Lab installation on flight 5A.
The mission included seven days of docked operations with the space station, four EVAs, and two ingress opportunities.
Over the course of four scheduled spacewalks, two teams of space walkers and an experienced robot arm operator collaborated to install the Z1 (Z for zenith port) truss structure on top of the U.S. Unity connecting node on the growing station and to deliver the third Pressurized Mating Adapter (PMA 3) to the ISS for the future berthing of new station components and to accommodate shuttle dockings.
The Z1 truss was the first permanent lattice-work structure for the ISS, very much like a girder, setting the stage for the future addition of the station's major trusses or backbones. The Z1 fixture also served as the platform on which the huge U.S. solar arrays were mounted on the next shuttle assembly flight, STS-97. The Z1 truss included many elements of the Communications and Tracking subsystem. The hardware included a Transmitter/Receiver/Controller (SGTRC) built by L3 Communications Systems-East in Camden, NJ. John Schina was the Chief Engineer of the ISS Program at L3.
The Z1 contains four large gyroscopic devices, called Control Moment Gyroscope (CMGs), which are used to maneuver the space station into the proper orientation on orbit once they were activated following the installation of the U.S. laboratory.
During the fourth spacewalk, astronauts Wisoff and López-Alegría tested the SAFER jet backpack, flying up to 50 feet while remaining tethered to the spacecraft.[6]
Media
See also
Script error: No such module "Portal".
- List of human spaceflights
- List of International Space Station spacewalks
- List of Space Shuttle missions
- List of spacewalks 2000–2014
- Outline of space science
References
External links
Script error: No such module "Navbox". Script error: No such module "Navbox".
Template:All U.S. Space Shuttle Missions Template:Orbital launches in 2000
- ↑ a b Cite error: Invalid
<ref>tag; no text was provided for refs namedsts92 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedmcc01 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedmcc09 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedmcc11 - ↑ Cite error: Invalid
<ref>tag; no text was provided for refs namedmcc13 - ↑ a b Cite error: Invalid
<ref>tag; no text was provided for refs namedmcc15 - ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1". Template:PD-notice