Chernobyl Nuclear Power Plant: Difference between revisions
imported>Citation bot Alter: pages, title. Add: pmid, date. Removed URL that duplicated identifier. Removed access-date with no URL. Formatted dashes. | Use this bot. Report bugs. | Suggested by Jay8g | #UCB_toolbar |
imported>TiMike |
||
| Line 9: | Line 9: | ||
| location = near [[Pripyat]], [[Kyiv Oblast]] | | location = near [[Pripyat]], [[Kyiv Oblast]] | ||
| coordinates = {{coord|51|23|21|N|30|05|58|E|region:UA_type:landmark|display=title,inline}} | | coordinates = {{coord|51|23|21|N|30|05|58|E|region:UA_type:landmark|display=title,inline}} | ||
| status = Undergoing | | status = Undergoing decommissioning since 2015 | ||
| construction_began = 15 August 1972 | | construction_began = 15 August 1972 | ||
| commissioned = {{start date|1977|09|26|df=yes}} | | commissioned = {{start date|1977|09|26|df=yes}} | ||
| Line 22: | Line 22: | ||
}} | }} | ||
The '''Chernobyl Nuclear Power Plant'''{{efn|{{Langx|uk|Чорнобильська атомна електростанція|translit=Chornobylska atomna elektrostantsiia}}; {{Langx|ru|Чернобыльская атомная электростанция|translit=Chernobylskaya atomnaya elektrostantsiya}}}} ('''ChNPP''') is a [[nuclear power plant]] undergoing [[Nuclear decommissioning|decommissioning]]. ChNPP is located near the abandoned city of [[Pripyat]] in northern [[Ukraine]], {{convert|16.5|km|mi|0|}} northwest of the city of [[Chernobyl]], {{convert|16|km|mi|0|}} from the [[Belarus–Ukraine border]], and about {{convert|100|km|mi|0|}} north of [[Kyiv]]. The plant was cooled by an engineered pond, fed by the [[Pripyat (river)|Pripyat River]] about {{convert|5|km|mi|0|}} northwest from its juncture with the [[Dnieper]] River. | The '''Chernobyl Nuclear Power Plant'''{{efn|{{Langx|uk|Чорнобильська атомна електростанція|translit=Chornobylska atomna elektrostantsiia}}; {{Langx|ru|Чернобыльская атомная электростанция|translit=Chernobylskaya atomnaya elektrostantsiya}}}} ('''ChNPP''') is a [[nuclear power plant]] undergoing [[Nuclear decommissioning|decommissioning]]. ChNPP is located near the abandoned city of [[Pripyat]] in northern [[Ukraine]], {{convert|16.5|km|mi|0|}} northwest of the city of [[Chernobyl]], {{convert|16|km|mi|0|}} from the [[Belarus–Ukraine border]], and about {{convert|100|km|mi|0|}} north of [[Kyiv]]. The plant was cooled by an engineered pond, fed by the [[Pripyat (river)|Pripyat River]] about {{convert|5|km|mi|0|}} northwest from its juncture with the [[Dnieper]] River. On 26 April 1986, during a safety test, unit 4 reactor exploded, exposing the core and releasing radiation. This marked the beginning of the [[Chernobyl disaster]]. | ||
Originally named the '''Chernobyl Nuclear Power Plant of V. I. Lenin'''{{efn|{{Langx|uk|Чорнобильська атомна електростанція ім. В.І. Леніна}}<br />{{Langx|ru|Чернобыльская АЭС имени В. И. Ленина}}<ref>{{Cite web|url=https://guides.loc.gov/chernobyl-nuclear-accident/introduction|title=Research Guides: Chernobyl Nuclear Accident, Chornobyl, Ukraine: A Resource Guide: Introduction|first=Matt|last=Young|website=guides.loc.gov}}</ref><ref>{{Cite web|url=https://www.chernobyl.one/lenin-nuclear-power-plant/|title=Chernobyl - Vladimir Ilyich Lenin Nuclear Power Plant|date=May 3, 2020|website=Chernobyl}}</ref><ref>{{Cite web|url=https://nationalinterest.org/feature/untold-story-vladimir-lenin-nuclear-power-plant-disaster-190506|title=The Untold Story of the Vladimir Lenin Nuclear Power Plant Disaster|first=Rainer|last=Zitelmann|website=The National Interest}}</ref><ref>{{Cite web|url=https://www.subbrit.org.uk/sites/chernobyl-power-station/|title=Chernobyl Power Station – Subterranea Britannica|website=www.subbrit.org.uk}}</ref><ref>{{Cite journal|title=Nuclear power in the USSR|journal=IAEA Bulletin| volume=22|issue=2|pages=34–45|author1-first=I.S. |author1-last=Zheludev|author2-first=L.V. |author2-last=Konstantinov |url=https://www.iaea.org/sites/default/files/publications/magazines/bulletin/bull22-2/22204763445.pdf |access-date=2025-06-01}}</ref>|group=lower-alpha}} after the [[Vladimir Lenin|founding leader]] of the Soviet Union, the plant was commissioned in phases with the four reactors entering commercial operation between 1978 and 1984. In 1986, in what became known as the [[Chernobyl disaster]], reactor No. 4 suffered a catastrophic explosion and meltdown; as a result of this, the power plant is now within a large restricted area known as the [[Chernobyl Exclusion Zone]]. Both the zone and the power plant are administered by the [[Chernobyl Exclusion Zone#Administration|State Agency of Ukraine on Exclusion Zone Management]]. The three other reactors remained operational post-accident maintaining a capacity factor between 60 and 70%. In total, units 1 and 3 had supplied 98 terawatt-hours of electricity each, with unit 2 slightly less at 75 TWh.<ref>{{Cite web|url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=575|title=PRIS - Reactor Details|website=pris.iaea.org}}</ref> In 1991, unit 2 was placed into a permanent shutdown state by the plant's operator due to complications resulting from a turbine fire. This was followed by Unit 1 in 1996 and Unit 3 in 2000. Their closures were largely attributed to foreign pressures. In 2013, the plant's operator announced that units 1–3 were fully defueled, and in 2015 entered the decommissioning phase, during which equipment contaminated during the operational period of the power station will be removed. This process is expected to take until 2065 according to the plant's operator.<ref>{{cite web|url=http://www.kyivpost.com/news/nation/detail/56391/|title=Chernobyl nuclear power plant site to be cleared by 2065|publisher=Kyiv Post|date=3 January 2010|archive-url=https://web.archive.org/web/20121005150746/http://www.kyivpost.com/content/ukraine/chornobyl-nuclear-power-plant-site-to-be-cleared-b-56391.html|archive-date=October 5, 2012 }}</ref> Although the reactors have all ceased generation, Chernobyl maintains a large workforce as the ongoing decommissioning process requires constant management.<ref name="Chernoby60945666">{{Cite news |date=2022-03-31 |title=Ukraine war: Russian troops leave Chernobyl, Ukraine says |url=https://www.bbc.com/news/world-europe-60945666 |access-date=2024-05-22 |language=en-GB}}</ref> | Originally named the '''Chernobyl Nuclear Power Plant of V. I. Lenin'''{{efn|{{Langx|uk|Чорнобильська атомна електростанція ім. В.І. Леніна}}<br />{{Langx|ru|Чернобыльская АЭС имени В. И. Ленина}}<ref>{{Cite web|url=https://guides.loc.gov/chernobyl-nuclear-accident/introduction|title=Research Guides: Chernobyl Nuclear Accident, Chornobyl, Ukraine: A Resource Guide: Introduction|first=Matt|last=Young|website=guides.loc.gov}}</ref><ref>{{Cite web|url=https://www.chernobyl.one/lenin-nuclear-power-plant/|title=Chernobyl - Vladimir Ilyich Lenin Nuclear Power Plant|date=May 3, 2020|website=Chernobyl}}</ref><ref>{{Cite web|url=https://nationalinterest.org/feature/untold-story-vladimir-lenin-nuclear-power-plant-disaster-190506|title=The Untold Story of the Vladimir Lenin Nuclear Power Plant Disaster|first=Rainer|last=Zitelmann|website=The National Interest}}</ref><ref>{{Cite web|url=https://www.subbrit.org.uk/sites/chernobyl-power-station/|title=Chernobyl Power Station – Subterranea Britannica|website=www.subbrit.org.uk}}</ref><ref>{{Cite journal|title=Nuclear power in the USSR|journal=IAEA Bulletin| volume=22|issue=2|pages=34–45|author1-first=I.S. |author1-last=Zheludev|author2-first=L.V. |author2-last=Konstantinov |url=https://www.iaea.org/sites/default/files/publications/magazines/bulletin/bull22-2/22204763445.pdf |access-date=2025-06-01}}</ref>|group=lower-alpha}} after the [[Vladimir Lenin|founding leader]] of the Soviet Union, the plant was commissioned in phases with the four reactors entering commercial operation between 1978 and 1984. In 1986, in what became known as the [[Chernobyl disaster]], reactor No. 4 suffered a catastrophic explosion and meltdown; as a result of this, the power plant is now within a large restricted area known as the [[Chernobyl Exclusion Zone]]. Both the zone and the power plant are administered by the [[Chernobyl Exclusion Zone#Administration|State Agency of Ukraine on Exclusion Zone Management]]. The three other reactors remained operational post-accident maintaining a capacity factor between 60 and 70%. In total, units 1 and 3 had supplied 98 terawatt-hours of electricity each, with unit 2 slightly less at 75 TWh.<ref>{{Cite web|url=https://pris.iaea.org/PRIS/CountryStatistics/ReactorDetails.aspx?current=575|title=PRIS - Reactor Details|website=pris.iaea.org}}</ref> In 1991, unit 2 was placed into a permanent shutdown state by the plant's operator due to complications resulting from a turbine fire. This was followed by Unit 1 in 1996 and Unit 3 in 2000. Their closures were largely attributed to foreign pressures. In 2013, the plant's operator announced that units 1–3 were fully defueled, and in 2015 entered the decommissioning phase, during which equipment contaminated during the operational period of the power station will be removed. This process is expected to take until 2065 according to the plant's operator.<ref>{{cite web|url=http://www.kyivpost.com/news/nation/detail/56391/|title=Chernobyl nuclear power plant site to be cleared by 2065|publisher=Kyiv Post|date=3 January 2010|archive-url=https://web.archive.org/web/20121005150746/http://www.kyivpost.com/content/ukraine/chornobyl-nuclear-power-plant-site-to-be-cleared-b-56391.html|archive-date=October 5, 2012 }}</ref> Although the reactors have all ceased generation, Chernobyl maintains a large workforce as the ongoing decommissioning process requires constant management.<ref name="Chernoby60945666">{{Cite news |date=2022-03-31 |title=Ukraine war: Russian troops leave Chernobyl, Ukraine says |url=https://www.bbc.com/news/world-europe-60945666 |access-date=2024-05-22 |language=en-GB}}</ref> | ||
From 24 February to 31 March 2022, Russian troops occupied the plant as part of their [[Russian invasion of Ukraine|invasion of Ukraine]].<ref name="AAUfZWmChernobyl"/><ref name="11648764981Chernobyl"/> | From 24 February to 31 March 2022, Russian troops occupied the plant as part of their [[2022 Russian invasion of Ukraine|invasion of Ukraine]].<ref name="AAUfZWmChernobyl"/><ref name="11648764981Chernobyl"/> | ||
== Construction == | == Construction == | ||
Construction of the Chernobyl Nuclear Power Plant began in 1972. The plant was meant to have 12 units, made up of six construction phases, and if completed would have been the largest nuclear power plant in the world. The plant would eventually consist of four [[RBMK-1000]] reactors, each capable of producing 1,000 [[megawatt]]s (MW) of electric power (3,200 MW of thermal power), and the four together produced about 10% of [[Ukrainian Soviet Socialist Republic|Ukraine]]'s electricity.<ref>[http://library.thinkquest.org/3426/data/introduction/location.html library.thinkquest.org] {{webarchive|url=https://web.archive.org/web/20090504090902/http://library.thinkquest.org/3426/data/introduction/location.html|date=May 4, 2009}} – All four of the reactors at the Chernobyl nuclear power station were of the RBMK-type.</ref> Like other sites which housed multiple RBMK reactors such as Kursk, the construction of the plant was also accompanied by the construction of a nearby city to house workers and their families. In the case of the ChNPP, the new city was [[Pripyat]]. | In 1966, plans to construct Chernobyl Nuclear Power Plant were first conceived, during the development of nuclear production of energy in the Soviet Union. Construction of the Chernobyl Nuclear Power Plant began in 1972.<ref>{{cite web|title=“Chernobyl: Chapter VIII. Shutdown of the Chernobyl Plant” |url=https://www.oecd-nea.org/jcms/pl_28379/chernobyl-chapter-viii-shutdown-of-the-chernobyl-plant | ||
|publisher=OECD Nuclear Energy Agency |access-date=22 November 2025}}</ref> The plant was meant to have 12 units, made up of six construction phases, and if completed would have been the largest nuclear power plant in the world. The plant would eventually consist of four [[RBMK-1000]] reactors, each capable of producing 1,000 [[megawatt]]s (MW) of electric power (3,200 MW of thermal power), and the four together produced about 10% of [[Ukrainian Soviet Socialist Republic|Ukraine]]'s electricity.<ref>[http://library.thinkquest.org/3426/data/introduction/location.html library.thinkquest.org] {{webarchive|url=https://web.archive.org/web/20090504090902/http://library.thinkquest.org/3426/data/introduction/location.html|date=May 4, 2009}} – All four of the reactors at the Chernobyl nuclear power station were of the RBMK-type.</ref> Like other sites which housed multiple RBMK reactors such as Kursk, the construction of the plant was also accompanied by the construction of a nearby city to house workers and their families. In the case of the ChNPP, the new city was [[Pripyat]]. During construction, a mobile crane was deployed and was used to lift pre-fabricated builds weighing up to 640 tons. It was the only crane of such design in the country, and was also used to install the nuclear reactor. Over 20 specialized organizations involved with the construction were working simultaneously , specializing in [[Electrical wiring|electric wiring]], [[heat insulation]], [[Hydraulic engineering|hydraulic engineer]]s, chemical protection, etc. The work would be coordinated and directed by the headquarters, which was managed by site manager Vasilii Trofimovich Kizima. Most welders formerly served in the tank forces, which gave them endurance training prior to becoming construction workers at Chernobyl. Concrete pouring was done as high as 50 meters above ground level, and the Komsomol-and-youth brigade of Viacheslav Volkov completed carcassing the reactor shaft by 1974.<ref>Chornobyl Nuclear Station, Ukrainian News and Documentary Film Studio (Ukrtelefilm), 1974</ref> | |||
The completion of the first reactor in 1977 was followed by reactor No. 2 in 1978, No. 3 in 1981, and No. 4 in 1983. Two more blocks, numbered five and six, of more or less the same reactor design, were planned at a site roughly a kilometre from the contiguous buildings of the four older blocks. This is similar to the layout of units 5 and 6 at Kursk and shows the similarity in design between the RBMK sites. Reactor No. 5 was around 70% complete at the time of Reactor 4's explosion and was scheduled to come online approximately seven months later, in November 1986. In the aftermath of the disaster, construction on No. 5 and 6 was suspended, and eventually cancelled on April 20, 1989, days before the third anniversary of the 1986 explosion.<ref>{{cite news |date=21 April 1989 |title=Soviets Cancel Plans for 2 New Reactors at Chernobyl |url=https://www.latimes.com/archives/la-xpm-1989-04-21-mn-2182-story.html |url-status=live |archive-url=https://web.archive.org/web/20190627004507/https://www.latimes.com/archives/la-xpm-1989-04-21-mn-2182-story.html |archive-date=27 June 2019 |access-date=26 August 2019 |newspaper=Los Angeles Times |location=Moscow, USSR |quote="The Soviet Union has canceled plans to construct two more reactors at the stricken Chernobyl nuclear power station...The decision was announced six days before the third anniversary of the accident at Chernobyl..." |agency=Times Wire Services}}</ref> At one point six other reactors were planned on the other side of the river, bringing the total to twelve.<ref>{{cite web|url=https://medium.com/discourse/a-physicists-visit-to-chernobyl-digging-a-little-deeper-9961a906b3c1|title=A Physicist's Visit to Chernobyl: Digging a Little Deeper|date=27 June 2019 }}</ref> | === Operations === | ||
Construction of the station concluded in the late 1970s, with reactor No. 1 being commissioned in 1977. It was the third Soviet RBMK nuclear power plant, after the [[Leningrad Nuclear Power Plant|Leningrad]] and [[Kursk Nuclear Power Plant|Kursk]] power plants, and the first plant on Ukrainian soil.<ref>{{Cite web|url=https://www.history.com/news/chernobyl-disaster-timeline|title=Chernobyl Disaster: The Meltdown by the Minute|first=Jesse|last=Greenspan|website=History|date=15 April 2019 |access-date=2019-09-18|archive-date=2019-09-24|archive-url=https://web.archive.org/web/20190924030437/https://www.history.com/news/chernobyl-disaster-timeline|url-status=live}}</ref> The completion of the first reactor in 1977 was followed by reactor No. 2 in 1978, No. 3 in 1981, and No. 4 in 1983. Two more blocks, numbered five and six, of more or less the same reactor design, were planned at a site roughly a kilometre from the contiguous buildings of the four older blocks. This is similar to the layout of units 5 and 6 at Kursk and shows the similarity in design between the RBMK sites. Reactor No. 5 was around 70% complete at the time of Reactor 4's explosion and was scheduled to come online approximately seven months later, in November 1986. In the aftermath of the disaster, construction on No. 5 and 6 was suspended, and eventually cancelled on April 20, 1989, days before the third anniversary of the 1986 explosion.<ref>{{cite news |date=21 April 1989 |title=Soviets Cancel Plans for 2 New Reactors at Chernobyl |url=https://www.latimes.com/archives/la-xpm-1989-04-21-mn-2182-story.html |url-status=live |archive-url=https://web.archive.org/web/20190627004507/https://www.latimes.com/archives/la-xpm-1989-04-21-mn-2182-story.html |archive-date=27 June 2019 |access-date=26 August 2019 |newspaper=Los Angeles Times |location=Moscow, USSR |quote="The Soviet Union has canceled plans to construct two more reactors at the stricken Chernobyl nuclear power station...The decision was announced six days before the third anniversary of the accident at Chernobyl..." |agency=Times Wire Services}}</ref> At one point six other reactors were planned on the other side of the river, bringing the total to twelve.<ref>{{cite web|url=https://medium.com/discourse/a-physicists-visit-to-chernobyl-digging-a-little-deeper-9961a906b3c1|title=A Physicist's Visit to Chernobyl: Digging a Little Deeper|date=27 June 2019 }}</ref> | |||
Reactors No. 3 and 4 were [[Generation II reactor|second-generation units]], whereas No. 1 and 2 were [[Generation I reactor|first-generation units]], like those in operation at the Kursk power plant. Second-generation RBMK designs were fitted with a more secure containment structure, visible in photos of the facility.<ref>{{cite web|url=http://www.world-nuclear.org/info/Safety-and-Security/Safety-of-Plants/Appendices/Early-Soviet-Reactors-and-EU-Accession/|title=Early Soviet Reactors and EU Accession|date=June 2019|website=[[World Nuclear Association]]|archive-url=https://web.archive.org/web/20190626213457/http://www.world-nuclear.org/information-library/safety-and-security/safety-of-plants/appendices/early-soviet-reactors-and-eu-accession.aspx|archive-date=June 26, 2019|url-status=live|access-date=March 10, 2016}}</ref> | Reactors No. 3 and 4 were [[Generation II reactor|second-generation units]], whereas No. 1 and 2 were [[Generation I reactor|first-generation units]], like those in operation at the Kursk power plant. Second-generation RBMK designs were fitted with a more secure containment structure, visible in photos of the facility.<ref>{{cite web|url=http://www.world-nuclear.org/info/Safety-and-Security/Safety-of-Plants/Appendices/Early-Soviet-Reactors-and-EU-Accession/|title=Early Soviet Reactors and EU Accession|date=June 2019|website=[[World Nuclear Association]]|archive-url=https://web.archive.org/web/20190626213457/http://www.world-nuclear.org/information-library/safety-and-security/safety-of-plants/appendices/early-soviet-reactors-and-eu-accession.aspx|archive-date=June 26, 2019|url-status=live|access-date=March 10, 2016}}</ref> | ||
== Units == | |||
{{mw-datatable}} | |||
{| class="wikitable sortable mw-datatable" | |||
! rowspan="2" |Phase | |||
! rowspan="2" |Unit<br/>No. | |||
! colspan="2" |Reactor | |||
! rowspan="2" |Status | |||
! colspan="2" |Capacity in MWe | |||
! rowspan="2" |Construction began | |||
! rowspan="2" |First [[Criticality (status)|criticality]] | |||
! rowspan="2" |Grid Connection | |||
! rowspan="2" |Commercial operation | |||
! rowspan="2" |Closure | |||
! rowspan="2" |Notes | |||
|- | |||
! Type ||Model ||Net ||Gross | |||
|- | |||
|rowspan="4" |I | |||
|1 | |||
| [[RBMK|Light water graphite reactor(LWGR)]] || [[RBMK]] | |||
| {{no|Permanent shutdown}} | |||
|725 | |||
|800 | |||
|1972 | |||
|1977 | |||
|1977 | |||
|1977 | |||
|1996 | |||
|Derated to 800MWe following the 1982 partial meltdown incident | |||
|- | |||
|2 | |||
| [[RBMK|Light water graphite reactor(LWGR)]] || [[RBMK]] | |||
| {{no|Permanent shutdown}} | |||
|925 | |||
|1000 | |||
|1972 | |||
|1978 | |||
|1978 | |||
|1978 | |||
|1991 | |||
|Shutdown following turbine fire | |||
|- | |||
|3 | |||
| [[RBMK|Light water graphite reactor(LWGR)]] || [[RBMK]] | |||
| {{no|Permanent shutdown}} | |||
|925 | |||
|1000 | |||
|1975 | |||
|1981 | |||
|1981 | |||
|1981 | |||
|2000 | |||
|The last unit to operate at ChNPP | |||
|- | |||
|4 | |||
| [[RBMK|Light water graphite reactor(LWGR)]] || [[RBMK]] | |||
| {{no|Permanent shutdown}} | |||
|925 | |||
|1000 | |||
|1975 | |||
|1983 | |||
|1983 | |||
|1983 | |||
|26th April 1986 | |||
|Shutdown following [[Chernobyl Disaster]] | |||
|- | |||
|rowspan="2" |II | |||
|5 | |||
| [[RBMK|Light water graphite reactor(LWGR)]] || [[RBMK]] | |||
| {{BLACK|Unfinished (construction cancelled)}} | |||
|925 | |||
|1000 | |||
|1982 | |||
|{{N/A}} | |||
|{{N/A}} | |||
|{{N/A}} | |||
|1989 | |||
|Construction cancelled following the disaster | |||
|- | |||
|6 | |||
| [[RBMK|Light water graphite reactor(LWGR)]] || [[RBMK]] | |||
| {{BLACK|Unfinished (construction cancelled)}} | |||
|925 | |||
|1000 | |||
|1982 | |||
|{{N/A}} | |||
|{{N/A}} | |||
|{{N/A}} | |||
|1989 | |||
|Construction cancelled following the disaster | |||
|} | |||
== Design == | == Design == | ||
| Line 70: | Line 164: | ||
=== 1982 reactor #1 partial meltdown === | === 1982 reactor #1 partial meltdown === | ||
On 9 September 1982, a partial [[nuclear meltdown|core meltdown]] occurred in reactor No. 1 due to a faulty cooling valve remaining closed following maintenance. Once the reactor came online, the uranium in the channel 13-44 overheated and ruptured. The extent of the damage was comparatively minor, and no one was killed during the accident. However, due to the negligence of the operators, the accident was not noticed until several hours later, resulting in significant release of radiation in the form of fragments of uranium oxide and several other radioactive isotopes escaping with steam from the reactor via the ventilation stack. This accident was somewhat similar to the 1975 Leningrad unit 1 accident. The accident was not made public until several years later, despite cleanups taking place in and around the power station and Pripyat. The reactor was repaired and put back into operation after eight months.<ref>{{Cite book|url=https://books.google.com/books?id=WwPJDwAAQBAJ&q=rbmk+serpentinite&pg=PA61|title=Midnight in Chernobyl: The Untold Story of the World's Greatest Nuclear Disaster|first=Adam|last=Higginbotham|date=February 4, 2020|publisher=Simon and Schuster|isbn=9781501134630|via=Google Books|access-date=May 3, 2021|archive-date=September 1, 2021|archive-url=https://web.archive.org/web/20210901025133/https://books.google.com/books?id=WwPJDwAAQBAJ&q=rbmk+serpentinite&pg=PA61|url-status=live}}</ref> | On 9 September 1982, a partial [[nuclear meltdown|core meltdown]] occurred in reactor No. 1 due to a faulty cooling valve remaining closed following maintenance. Once the reactor came online, the uranium in the channel 13-44 overheated and ruptured. The extent of the damage was comparatively minor, and no one was killed during the accident. However, due to the negligence of the operators, the accident was not noticed until several hours later, resulting in significant release of radiation in the form of fragments of uranium oxide and several other radioactive isotopes escaping with steam from the reactor via the ventilation stack. This accident was somewhat similar to the 1975 Leningrad unit 1 accident. The accident was not made public until several years later, despite cleanups taking place in and around the power station and Pripyat. The reactor was repaired and put back into operation after eight months with its capacity reduced by 20% to 800MWe.<ref>{{Cite book|url=https://books.google.com/books?id=WwPJDwAAQBAJ&q=rbmk+serpentinite&pg=PA61|title=Midnight in Chernobyl: The Untold Story of the World's Greatest Nuclear Disaster|first=Adam|last=Higginbotham|date=February 4, 2020|publisher=Simon and Schuster|isbn=9781501134630|via=Google Books|access-date=May 3, 2021|archive-date=September 1, 2021|archive-url=https://web.archive.org/web/20210901025133/https://books.google.com/books?id=WwPJDwAAQBAJ&q=rbmk+serpentinite&pg=PA61|url-status=live}}</ref> | ||
=== 1984 reactor #3 and #4 incident === | === 1984 reactor #3 and #4 incident === | ||
| Line 77: | Line 171: | ||
=== 1986 reactor #4 catastrophe (Chernobyl disaster) === | === 1986 reactor #4 catastrophe (Chernobyl disaster) === | ||
{{Main article|Chernobyl disaster}} | {{Main article|Chernobyl disaster}} | ||
On 26 April 1986, reactor No. 4 suffered catastrophic [[Nuclear meltdown|meltdown]] resulting in a core explosion and open-air fires. This caused large quantities of radioactive materials to be dispersed in the atmosphere and surrounding land. The disaster is regarded as the worst accident in the history of nuclear power.<ref>{{cite journal |last1=Cardis |first1=E. |last2=Hatch |first2=M. |title=The Chernobyl Accident — An Epidemiological Perspective |journal=Clinical Oncology |date=May 2011 |volume=23 |issue=4 |pages=251–260 |doi=10.1016/j.clon.2011.01.510 |pmid=21396807 |pmc=3107017 }}</ref> | On 26 April 1986, reactor No. 4 suffered a catastrophic [[Nuclear meltdown|meltdown]] during a safety test resulting in a core explosion and open-air fires. This caused large quantities of radioactive materials to be dispersed in the atmosphere and surrounding land. The disaster is regarded as the worst accident in the history of nuclear power.<ref>{{cite journal |last1=Cardis |first1=E. |last2=Hatch |first2=M. |title=The Chernobyl Accident — An Epidemiological Perspective |journal=Clinical Oncology |date=May 2011 |volume=23 |issue=4 |pages=251–260 |doi=10.1016/j.clon.2011.01.510 |pmid=21396807 |pmc=3107017 }}</ref> | ||
The destroyed reactor was encased in [[Chernobyl Nuclear Power Plant sarcophagus|a concrete and lead sarcophagus]], followed more recently by [[Chernobyl New Safe Confinement|a large steel confinement shelter]] to prevent further escape of radioactivity. The radioactive cloud spread as far away as Norway.<ref name="MedvedevZ">{{Cite book|last=Medvedev|first=Zhores A.|title=The Legacy of Chernobyl|publisher=W. W. Norton & Company|year=1990|isbn=978-0-393-30814-3|edition=Paperback. First American edition published in 1990|author-link=Zhores A. Medvedev}}</ref> | The destroyed reactor was encased in [[Chernobyl Nuclear Power Plant sarcophagus|a concrete and lead sarcophagus]], followed more recently by [[Chernobyl New Safe Confinement|a large steel confinement shelter]] to prevent further escape of radioactivity. The radioactive cloud spread as far away as Norway.<ref name="MedvedevZ">{{Cite book|last=Medvedev|first=Zhores A.|title=The Legacy of Chernobyl|publisher=W. W. Norton & Company|year=1990|isbn=978-0-393-30814-3|edition=Paperback. First American edition published in 1990|author-link=Zhores A. Medvedev}}</ref> | ||
| Line 90: | Line 184: | ||
The [[2017 Petya cyberattack]] affected the [[radiation monitoring]] system and took down the power plant's official website, which hosts information about the incident and the area.<ref>{{cite news|url=https://www.independent.co.uk/news/world/europe/chernobyl-ukraine-petya-cyber-attack-hack-nuclear-power-plant-danger-latest-a7810941.html|title='Petya' cyber attack: Chernobyl's radiation monitoring system hit by worldwide hack|first=Andrew|last=Griffin|date=June 27, 2017|work=The Independent|access-date=April 1, 2018|archive-date=August 18, 2019|archive-url=https://web.archive.org/web/20190818234657/https://www.independent.co.uk/news/world/europe/chernobyl-ukraine-petya-cyber-attack-hack-nuclear-power-plant-danger-latest-a7810941.html|url-status=live}}</ref> | The [[2017 Petya cyberattack]] affected the [[radiation monitoring]] system and took down the power plant's official website, which hosts information about the incident and the area.<ref>{{cite news|url=https://www.independent.co.uk/news/world/europe/chernobyl-ukraine-petya-cyber-attack-hack-nuclear-power-plant-danger-latest-a7810941.html|title='Petya' cyber attack: Chernobyl's radiation monitoring system hit by worldwide hack|first=Andrew|last=Griffin|date=June 27, 2017|work=The Independent|access-date=April 1, 2018|archive-date=August 18, 2019|archive-url=https://web.archive.org/web/20190818234657/https://www.independent.co.uk/news/world/europe/chernobyl-ukraine-petya-cyber-attack-hack-nuclear-power-plant-danger-latest-a7810941.html|url-status=live}}</ref> | ||
=== | === Russian invasion of Ukraine === | ||
{{main|Capture of Chernobyl|l1 = Battle of Chernobyl}} | {{main|Capture of Chernobyl|l1 = Battle of Chernobyl}} | ||
| Line 104: | Line 198: | ||
== Decommissioning == | == Decommissioning == | ||
After the explosion at reactor No. 4 and construction of the sarcophagus, the remaining three reactors were de-contaminated and re-launched (reactor No. 1 on 1 October 1986, reactor No. 2 on 5 November 1986, | After the explosion at reactor No. 4 and construction of the sarcophagus, the remaining three reactors were de-contaminated and re-launched (reactor No. 1 on 1 October 1986, reactor No. 2 on 5 November 1986, and reactor No. 3 on 4 December 1987) and continued to operate until the post-Soviet period.<ref>{{Cite web|url=https://www.businessinsider.com/chernobyl-reactors-14-years-disaster-2016-4|title=Here's why Russia didn't shut down Chernobyl until 14 years after the disaster|first=Sarah|last=Kramer|date=April 26, 2016|website=Business Insider|archive-url=https://web.archive.org/web/20190629030644/https://www.businessinsider.com/chernobyl-reactors-14-years-disaster-2016-4?r=US&IR=T|archive-date=June 29, 2019}}</ref> The [[Chernobyl New Safe Confinement]] is equipped with two overhead main cranes, which will be used to remove unstable parts of the original sarcophagus.<ref>{{Cite web|date=|title=EBRD New Safe Confinement Technical Presentation|url=http://www.ebrd.com/documents/nuclear-safety/pdf-new-safe-confinement-technical-presentation.pdf|access-date=2022-02-25|archive-date=2021-10-02|archive-url=https://web.archive.org/web/20211002231100/https://www.ebrd.com/documents/nuclear-safety/pdf-new-safe-confinement-technical-presentation.pdf|url-status=live}}</ref><ref>{{cite web | url=https://chnpp.gov.ua/en/about/history-of-the-chnpp/chnpp-shutdown | title=Post-accident operation and shutdown |access-date=2025-06-01|website=Chornobyl NPP}}</ref> The majority of the external [[Gamma ray|gamma radiation]] emissions at the site are from the [[isotope]] [[caesium-137]], which has a [[half-life]] of 30.17 years. {{As of|2016}}, the radiation exposure from that radionuclide has declined by half since the 1986 accident. | ||
On 11 October 1991, reactor No. 2 caught fire, and was subsequently shut down.<ref name="nrc"/> Ukraine's 1991 independence from the Soviet Union generated further discussion on the Chernobyl topic, because the [[Verkhovna Rada]], Ukraine's new parliament, was composed largely of young reformers. Discussions about the future of nuclear energy in Ukraine ultimately moved the government toward a decision to decommission reactor No. 2. | On 11 October 1991, reactor No. 2's turbine caught fire, and was subsequently shut down.<ref name="nrc"/> Ukraine's 1991 independence from the Soviet Union generated further discussion on the Chernobyl topic, because the [[Verkhovna Rada]], Ukraine's new parliament, was composed largely of young reformers. Discussions about the future of nuclear energy in Ukraine ultimately moved the government toward a decision to decommission reactor No. 2. | ||
On 30 November 1996, following pressure from foreign governments, reactor No. 1 was shut down.<ref name="Mara2010">{{cite book |author=Mara |first=Wil |url=https://archive.org/details/chernobyldisaste0000mara |title=The Chernobyl Disaster: Legacy and Impact on the Future of Nuclear Energy |date=1 September 2010 |publisher=Marshall Cavendish |isbn=978-0-7614-4984-3 |pages=[https://archive.org/details/chernobyldisaste0000mara/page/96 96]– |url-access=registration}}</ref> Dismantling and removal of equipment began at reactor No. 1 in 2007.<ref>{{cite web|url=http://www.world-nuclear-news.org/wasteRecycling/260407Decommissioning_at_Chernobyl.shtml|archive-url=https://web.archive.org/web/20090202041301/http://www.world-nuclear-news.org/wasteRecycling/260407Decommissioning_at_Chernobyl.shtml|title=Decommissioning at Chernobyl|archive-date=February 2, 2009|access-date=March 10, 2016|date=26 April 2007}}</ref> The work is expected to be completed by 2028.<ref>{{Cite news |title=Channel removal work trialled at Chernobyl |url=https://www.world-nuclear-news.org/Articles/Channel-removal-work-trialled-at-Chernobyl |archive-url=https://web.archive.org/web/20190608053925/https://www.world-nuclear-news.org/Articles/Channel-removal-work-trialled-at-Chernobyl |archive-date=2019-06-08 |work=World Nuclear News}}</ref> | On 30 November 1996, following pressure from foreign governments,{{clarify|date=December 2025}} reactor No. 1 was shut down.<ref name="Mara2010">{{cite book |author=Mara |first=Wil |url=https://archive.org/details/chernobyldisaste0000mara |title=The Chernobyl Disaster: Legacy and Impact on the Future of Nuclear Energy |date=1 September 2010 |publisher=Marshall Cavendish |isbn=978-0-7614-4984-3 |pages=[https://archive.org/details/chernobyldisaste0000mara/page/96 96]– |url-access=registration}}</ref> Dismantling and removal of equipment began at reactor No. 1 in 2007.<ref>{{cite web|url=http://www.world-nuclear-news.org/wasteRecycling/260407Decommissioning_at_Chernobyl.shtml|archive-url=https://web.archive.org/web/20090202041301/http://www.world-nuclear-news.org/wasteRecycling/260407Decommissioning_at_Chernobyl.shtml|title=Decommissioning at Chernobyl|archive-date=February 2, 2009|access-date=March 10, 2016|date=26 April 2007}}</ref> The work is expected to be completed by 2028.<ref>{{Cite news |title=Channel removal work trialled at Chernobyl |url=https://www.world-nuclear-news.org/Articles/Channel-removal-work-trialled-at-Chernobyl |archive-url=https://web.archive.org/web/20190608053925/https://www.world-nuclear-news.org/Articles/Channel-removal-work-trialled-at-Chernobyl |archive-date=2019-06-08 |work=World Nuclear News}}</ref> | ||
On 15 December 2000, reactor No. 3 was shut down after operating briefly since March 1999 following almost three months of repairs,<ref>{{Cite web|url= | On 15 December 2000, reactor No. 3 was shut down after operating briefly since March 1999 following almost three months of repairs,<ref>{{Cite web|url=https://news.bbc.co.uk/2/hi/europe/291549.stm|title=BBC News | Europe | Chernobyl reopens|website=news.bbc.co.uk|date=March 7, 1999|url-status=live|archive-url=https://web.archive.org/web/20110401130534/http://news.bbc.co.uk/2/hi/europe/291549.stm|archive-date=April 1, 2011}}</ref><ref>{{Cite news|url = https://www.nytimes.com/1999/11/27/world/last-working-chernobyl-reactor-is-restarted.html|title = Last Working Chernobyl Reactor is Restarted|newspaper = The New York Times|date = 27 November 1999|access-date = 9 August 2020|archive-date = 10 September 2020|archive-url = https://web.archive.org/web/20200910051336/https://www.nytimes.com/1999/11/27/world/last-working-chernobyl-reactor-is-restarted.html|url-status = live}}</ref> and the plant as a whole ceased producing electricity.<ref name="Mara2010" /> In April 2015, units 1 through 3 entered the decommissioning phase.<ref>{{cite web |title=Chernobyl 1–3 enter decommissioning phase |url=http://www.world-nuclear-news.org/RS-Chernobyl-1-3-enter-decommissioning-phase-13041501.html |url-status=live |archive-url=https://web.archive.org/web/20160310033247/http://www.world-nuclear-news.org/RS-Chernobyl-1-3-enter-decommissioning-phase-13041501.html |archive-date=March 10, 2016 |access-date=March 10, 2016}}</ref> Upon being shut down, the plant was re-classified as a 'State Special Enterprise', while 'V. I. Lenin' was removed from the name following Ukraine's independence. | ||
In 2013, the pump lifting river water into the cooling reservoir adjacent to the facility was powered down, with the thermal sink expected to slowly | In 2013, the pump lifting river water into the cooling reservoir adjacent to the facility was powered down, with the thermal sink expected to evaporate slowly.<ref>{{Cite web |title=Draining the pond of the Chernobyl nuclear power plant |url=https://www.chernobyl-tour.com/main/video_chernobyl_tours_en/107-draining-the-pond-of-the-chernobyl-nuclear-power-plant.html |url-status=live |archive-url=https://web.archive.org/web/20191219224136/https://www.chernobyl-tour.com/main/video_chernobyl_tours_en/107-draining-the-pond-of-the-chernobyl-nuclear-power-plant.html |archive-date=2019-12-19 |access-date=2019-12-19 |website=CHORNOBYL TOUR 2020 – trips to the Chornobyl exclusion zone, to the Pripyat town, ChNPP. (ex. CHERNOBYL TOUR)}}</ref> | ||
[[File:Chernobyl_New_Safe_Confinement_August_2016.jpg|thumb|New Safe Confinement in 2016]] | [[File:Chernobyl_New_Safe_Confinement_August_2016.jpg|thumb|New Safe Confinement in 2016]] | ||
Originally announced in June 2003, a new steel containment structure named the [[New Safe Confinement]] was built to replace the aging and hastily built sarcophagus that protected ruined reactor No. 4.<ref name="OnishiVoitsekhovich2007">{{cite book |last1=Onishi |first1=Yasuo |url=https://books.google.com/books?id=AKTjYeWO5E0C&pg=PA247 |title=Chernobyl – What Have We Learned?: The Successes and Failures to Mitigate Water Contamination Over 20 Years |last2=Voitsekhovich |first2=Oleg V. |last3=Zheleznyak |first3=Mark J. |date=3 June 2007 |publisher=Springer Science & Business Media |isbn=978-1-4020-5349-8 | | Originally announced in June 2003, a new steel containment structure named the [[New Safe Confinement]] was built to replace the aging and hastily built sarcophagus that protected ruined reactor No. 4.<ref name="OnishiVoitsekhovich2007">{{cite book |last1=Onishi |first1=Yasuo |url=https://books.google.com/books?id=AKTjYeWO5E0C&pg=PA247 |title=Chernobyl – What Have We Learned?: The Successes and Failures to Mitigate Water Contamination Over 20 Years |last2=Voitsekhovich |first2=Oleg V. |last3=Zheleznyak |first3=Mark J. |date=3 June 2007 |publisher=Springer Science & Business Media |isbn=978-1-4020-5349-8 |page=247 |access-date=1 January 2017 |archive-url=https://web.archive.org/web/20211106152038/https://books.google.com/books?id=AKTjYeWO5E0C&pg=PA247 |archive-date=6 November 2021 |url-status=live}}</ref> Though the project's development had been delayed several times, construction officially began in September 2010.<ref name="Pitta2015">{{cite book |author=Pitta |first=Terra |url=https://books.google.com/books?id=8raOCgAAQBAJ&pg=PT64 |title=Catastrophe: A Guide to World's Worst Industrial Disasters |date=5 August 2015 |publisher=Vij Books India |isbn=978-93-85505-17-1 |pages=64– |access-date=1 January 2017 |archive-url=https://web.archive.org/web/20190626213446/https://books.google.com/books?id=8raOCgAAQBAJ&pg=PT64 |archive-date=26 June 2019 |url-status=live}}</ref> The New Safe Confinement was financed by an international fund managed by the [[European Bank for Reconstruction and Development]] and was designed and built by the French-led consortium [[Novarka]].<ref name="Committee2011">{{cite book |author=House of Commons European Scrutiny Committee |url=https://books.google.com/books?id=RLnC9dJ7OpwC&pg=PA59 |title=Nineteenth report of session 2010–11: documents considered by the Committee on 16 February 2011, including the following recommendations for debate, reviewing the working time directive; global navigation satellite system; control of the Commission's implementing powers; recognition and enforcement of judgments in civil and commercial matters, report, together with formal minutes |date=1 March 2011 |publisher=The Stationery Office |isbn=978-0-215-55666-0 |page=59 |access-date=31 January 2017 |archive-url=https://web.archive.org/web/20190626213440/https://books.google.com/books?id=RLnC9dJ7OpwC&pg=PA59 |archive-date=26 June 2019 |url-status=live}}</ref> | ||
In February 2013, a {{convert|600|m2|0}} portion of the roof and wall adjacent to the covered part of the turbine hall collapsed into the entombed area of the turbine hall. The collapse did not affect any other part of the [[Chernobyl Nuclear Power Plant sarcophagus|Object Shelter]] (sarcophagus) or the [[New Safe Confinement]]. No variances in radiation levels as a result of the incident were detected.<ref>{{cite news|date=February 13, 2013|title=Chernobyl radiation unaffected after heavy snow causes partial roof collapse, Ukrainian officials say|newspaper=New York Daily | In February 2013, a {{convert|600|m2|0}} portion of the roof and wall adjacent to the covered part of the turbine hall collapsed into the entombed area of the turbine hall. The collapse did not affect any other part of the [[Chernobyl Nuclear Power Plant sarcophagus|Object Shelter]] (sarcophagus) or the [[New Safe Confinement]]. No variances in radiation levels as a result of the incident were detected.<ref>{{cite news|date=February 13, 2013|title=Chernobyl radiation unaffected after heavy snow causes partial roof collapse, Ukrainian officials say|newspaper=New York Daily News|agency=Associated Press|url=http://www.nydailynews.com/news/world/chernobyl-radiation-unaffected-roof-collapse-article-1.1263037|access-date=February 15, 2013|archive-date=February 16, 2013|archive-url=https://web.archive.org/web/20130216111509/http://www.nydailynews.com/news/world/chernobyl-radiation-unaffected-roof-collapse-article-1.1263037|url-status=live}}</ref> The collapsed roof was built after the Chernobyl disaster and was later repaired.<ref>{{cite news|date=February 14, 2013|title=Chernobyl roof collapses under snow|newspaper=New Zealand Herald|agency=AFP|url=http://m.nzherald.co.nz/world/news/article.cfm?c_id=2&objectid=10865344|url-status=dead|access-date=February 15, 2013|archive-url=https://archive.today/20130413233159/http://m.nzherald.co.nz/world/news/article.cfm?c_id=2&objectid=10865344|archive-date=April 13, 2013}}</ref> | ||
Novarka built a large arch-shaped structure out of steel {{convert|270|m|ft|0|}} wide, {{convert|100|m|ft|0|}} high, and {{convert|150|m|ft|0|}} long to cover the old crumbling concrete dome that was in use at the time.<ref name="Mara2010" /> The structure was built in two segments which were joined in August 2015.<ref>{{cite web |author1=Ford |first=Jason |date=3 August 2015 |title=Arches of Chernobyl's New Safe Confinement are joined together |url=https://www.theengineer.co.uk/arches-of-chernobyls-new-safe-confinement-are-joined-together/ |archive-url=https://web.archive.org/web/20160221172541/http://www.theengineer.co.uk/arches-of-chernobyls-new-safe-confinement-are-joined-together/ |archive-date=21 February 2016 |access-date=8 March 2021 |website=The Engineer |publisher=Mark Allen Engineering | Novarka built a large arch-shaped structure out of steel {{convert|270|m|ft|0|}} wide, {{convert|100|m|ft|0|}} high, and {{convert|150|m|ft|0|}} long to cover the old crumbling concrete dome that was in use at the time.<ref name="Mara2010" /> The structure was built in two segments which were joined in August 2015.<ref>{{cite web |author1=Ford |first=Jason |date=3 August 2015 |title=Arches of Chernobyl's New Safe Confinement are joined together |url=https://www.theengineer.co.uk/arches-of-chernobyls-new-safe-confinement-are-joined-together/ |archive-url=https://web.archive.org/web/20160221172541/http://www.theengineer.co.uk/arches-of-chernobyls-new-safe-confinement-are-joined-together/ |archive-date=21 February 2016 |access-date=8 March 2021 |website=The Engineer |publisher=Mark Allen Engineering }}</ref> In November 2016, the completed arch was placed over the existing sarcophagus.<ref>{{cite web|url=http://www.ebrd.com/news/2016/unique-engineering-feat-concluded-as-chernobyl-arch-has-reached-resting-place.html|title=Unique engineering feat concluded as Chernobyl arch has reached resting place|website=European Bank for Reconstruction and Development|access-date=April 1, 2018|archive-date=January 26, 2017|archive-url=https://web.archive.org/web/20170126195658/http://www.ebrd.com/news/2016/unique-engineering-feat-concluded-as-chernobyl-arch-has-reached-resting-place.html|url-status=live}}</ref> This steel casing project was expected to cost $1.4 billion, and was completed in 2017. The casing also meets the definition of a [[nuclear entombment]] device.<ref>{{cite web |url=http://m.theengineer.co.uk/1020859.article?mobilesite=enabled |title=NOVARKA and Chernobyl Project Management Unit confirm cost and time schedule for Chernobyl New Safe Confinement |publisher=European Bank |date=April 8, 2011 |access-date=April 22, 2012 }}{{Dead link|date=February 2022 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> | ||
Separately, an American firm [[Holtec International]] built a storage facility within the exclusion zone for nuclear waste produced by Chernobyl.<ref>{{cite web|url=http://chernobyltwentyfive.org/node/867|title=Chernobyl 25|access-date=March 10, 2016|url-status=dead|archive-url=https://web.archive.org/web/20130310010627/http://chernobyltwentyfive.org/node/867|archive-date=March 10, 2013|df=mdy-all}}</ref><ref>[http://www.holtecinternational.com/sites/default/files/pr/HH22_18.pdf Holtec International Press Release]{{dead link|date=November 2016|bot=InternetArchiveBot|fix-attempted=yes}} (December 31, 2007).</ref><ref>{{cite news|title=New licence for Chernobyl used fuel facility|url=http://www.world-nuclear-news.org/WR-New_licence_for_Chernobyl_spent_fuel_facility-2803137.html|access-date=April 2, 2013|newspaper=World Nuclear News|date=March 28, 2013|archive-date=April 12, 2013|archive-url=https://web.archive.org/web/20130412084142/http://www.world-nuclear-news.org/WR-New_licence_for_Chernobyl_spent_fuel_facility-2803137.html|url-status=live}}</ref> This facility, named the Interim Storage Facility 2, has dry storage for the 21,297 spent fuel assemblies formerly at the power plant, which are being loaded into approximately 231 waste canisters, and stored in the ISF-2 for 100 years.<ref>{{Cite web|title=EBRD Interim Spent Fuel Storage Facility Technical Report|url=https://www.ebrd.com/documents/nuclear-safety/pdf-interim-spent-fuel-storage-technical-presentation.pdf|access-date=2022-02-25|archive-date=2021-10-02|archive-url=https://web.archive.org/web/20211002230836/https://www.ebrd.com/documents/nuclear-safety/pdf-interim-spent-fuel-storage-technical-presentation.pdf|url-status=live}}</ref> In 2020, the storage facility was completed, and on November 18, 2020, the first canister of nuclear waste was loaded into the storage area.<ref>{{Cite web|title=Historic milestone at Chernobyl Nuclear Power Plant|url=https://www.ebrd.com/news/2020/historic-milestone-at-chernobyl-nuclear-power-plant.html|access-date=2022-01-03|website=www.ebrd.com|language=en|archive-date=2022-01-03|archive-url=https://web.archive.org/web/20220103205316/https://www.ebrd.com/news/2020/historic-milestone-at-chernobyl-nuclear-power-plant.html|url-status=live}}</ref> By January 2022, 1,698 spent fuel assemblies had been moved in.<ref>{{cite web |url=https://chnpp.gov.ua/en/decommissioning-projects/98-2013-05-22-13-32-06/434-2434 |title=Interim Spent Nuclear Fuel Dry Storage Facility (ISF-2) |date=2023-12-11 |publisher=Chornobyl NPP |archive-url=https://web.archive.org/web/20250420060043/https://chnpp.gov.ua/en/decommissioning-projects/98-2013-05-22-13-32-06/434-2434 |archive-date=2025-04-20}}</ref> | |||
== See also == | == See also == | ||
* [[ | * [[Outline of the Chernobyl disaster]] | ||
* [[List of nuclear reactors]] | * [[Nuclear_decommissioning#List_of_inactive_or_decommissioned_civil_nuclear_reactors|List of inactive or decommissioned civil nuclear reactors]] | ||
== Notes == | == Notes == | ||
| Line 147: | Line 241: | ||
[[Category:Photovoltaic power stations in Ukraine]] | [[Category:Photovoltaic power stations in Ukraine]] | ||
[[Category:Buildings and structures in Pripyat]] | [[Category:Buildings and structures in Pripyat]] | ||
[[Category:Energy infrastructure completed in 1977]] | [[Category:Energy infrastructure completed in 1977]] | ||
[[Category:Former nuclear power stations in Ukraine]] | [[Category:Former nuclear power stations in Ukraine]] | ||
[[Category:Energy infrastructure closed in the 1980s]] | [[Category:Energy infrastructure closed in the 1980s]] | ||
Latest revision as of 01:38, 29 December 2025
- REDIRECT Template:Protection padlock
Template:Rcat shell Template:Infobox power station
The Chernobyl Nuclear Power PlantTemplate:Efn (ChNPP) is a nuclear power plant undergoing decommissioning. ChNPP is located near the abandoned city of Pripyat in northern Ukraine, Script error: No such module "convert". northwest of the city of Chernobyl, Script error: No such module "convert". from the Belarus–Ukraine border, and about Script error: No such module "convert". north of Kyiv. The plant was cooled by an engineered pond, fed by the Pripyat River about Script error: No such module "convert". northwest from its juncture with the Dnieper River. On 26 April 1986, during a safety test, unit 4 reactor exploded, exposing the core and releasing radiation. This marked the beginning of the Chernobyl disaster.
Originally named the Chernobyl Nuclear Power Plant of V. I. LeninTemplate:Efn after the founding leader of the Soviet Union, the plant was commissioned in phases with the four reactors entering commercial operation between 1978 and 1984. In 1986, in what became known as the Chernobyl disaster, reactor No. 4 suffered a catastrophic explosion and meltdown; as a result of this, the power plant is now within a large restricted area known as the Chernobyl Exclusion Zone. Both the zone and the power plant are administered by the State Agency of Ukraine on Exclusion Zone Management. The three other reactors remained operational post-accident maintaining a capacity factor between 60 and 70%. In total, units 1 and 3 had supplied 98 terawatt-hours of electricity each, with unit 2 slightly less at 75 TWh.[1] In 1991, unit 2 was placed into a permanent shutdown state by the plant's operator due to complications resulting from a turbine fire. This was followed by Unit 1 in 1996 and Unit 3 in 2000. Their closures were largely attributed to foreign pressures. In 2013, the plant's operator announced that units 1–3 were fully defueled, and in 2015 entered the decommissioning phase, during which equipment contaminated during the operational period of the power station will be removed. This process is expected to take until 2065 according to the plant's operator.[2] Although the reactors have all ceased generation, Chernobyl maintains a large workforce as the ongoing decommissioning process requires constant management.[3]
From 24 February to 31 March 2022, Russian troops occupied the plant as part of their invasion of Ukraine.[4][5]
Construction
In 1966, plans to construct Chernobyl Nuclear Power Plant were first conceived, during the development of nuclear production of energy in the Soviet Union. Construction of the Chernobyl Nuclear Power Plant began in 1972.[6] The plant was meant to have 12 units, made up of six construction phases, and if completed would have been the largest nuclear power plant in the world. The plant would eventually consist of four RBMK-1000 reactors, each capable of producing 1,000 megawatts (MW) of electric power (3,200 MW of thermal power), and the four together produced about 10% of Ukraine's electricity.[7] Like other sites which housed multiple RBMK reactors such as Kursk, the construction of the plant was also accompanied by the construction of a nearby city to house workers and their families. In the case of the ChNPP, the new city was Pripyat. During construction, a mobile crane was deployed and was used to lift pre-fabricated builds weighing up to 640 tons. It was the only crane of such design in the country, and was also used to install the nuclear reactor. Over 20 specialized organizations involved with the construction were working simultaneously , specializing in electric wiring, heat insulation, hydraulic engineers, chemical protection, etc. The work would be coordinated and directed by the headquarters, which was managed by site manager Vasilii Trofimovich Kizima. Most welders formerly served in the tank forces, which gave them endurance training prior to becoming construction workers at Chernobyl. Concrete pouring was done as high as 50 meters above ground level, and the Komsomol-and-youth brigade of Viacheslav Volkov completed carcassing the reactor shaft by 1974.[8]
Operations
Construction of the station concluded in the late 1970s, with reactor No. 1 being commissioned in 1977. It was the third Soviet RBMK nuclear power plant, after the Leningrad and Kursk power plants, and the first plant on Ukrainian soil.[9] The completion of the first reactor in 1977 was followed by reactor No. 2 in 1978, No. 3 in 1981, and No. 4 in 1983. Two more blocks, numbered five and six, of more or less the same reactor design, were planned at a site roughly a kilometre from the contiguous buildings of the four older blocks. This is similar to the layout of units 5 and 6 at Kursk and shows the similarity in design between the RBMK sites. Reactor No. 5 was around 70% complete at the time of Reactor 4's explosion and was scheduled to come online approximately seven months later, in November 1986. In the aftermath of the disaster, construction on No. 5 and 6 was suspended, and eventually cancelled on April 20, 1989, days before the third anniversary of the 1986 explosion.[10] At one point six other reactors were planned on the other side of the river, bringing the total to twelve.[11]
Reactors No. 3 and 4 were second-generation units, whereas No. 1 and 2 were first-generation units, like those in operation at the Kursk power plant. Second-generation RBMK designs were fitted with a more secure containment structure, visible in photos of the facility.[12]
Units
| Phase | Unit No. |
Reactor | Status | Capacity in MWe | Construction began | First criticality | Grid Connection | Commercial operation | Closure | Notes | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Type | Model | Net | Gross | |||||||||
| I | 1 | Light water graphite reactor(LWGR) | RBMK | Permanent shutdown | 725 | 800 | 1972 | 1977 | 1977 | 1977 | 1996 | Derated to 800MWe following the 1982 partial meltdown incident |
| 2 | Light water graphite reactor(LWGR) | RBMK | Permanent shutdown | 925 | 1000 | 1972 | 1978 | 1978 | 1978 | 1991 | Shutdown following turbine fire | |
| 3 | Light water graphite reactor(LWGR) | RBMK | Permanent shutdown | 925 | 1000 | 1975 | 1981 | 1981 | 1981 | 2000 | The last unit to operate at ChNPP | |
| 4 | Light water graphite reactor(LWGR) | RBMK | Permanent shutdown | 925 | 1000 | 1975 | 1983 | 1983 | 1983 | 26th April 1986 | Shutdown following Chernobyl Disaster | |
| II | 5 | Light water graphite reactor(LWGR) | RBMK | Unfinished (construction cancelled) | 925 | 1000 | 1982 | — | — | — | 1989 | Construction cancelled following the disaster |
| 6 | Light water graphite reactor(LWGR) | RBMK | Unfinished (construction cancelled) | 925 | 1000 | 1982 | — | — | — | 1989 | Construction cancelled following the disaster | |
Design
Electrical systems
The power plant is connected to the 330 kV and 750 kV electrical grid. The block has two electrical generators connected to the 750 kV grid by a single generator transformer. The generators are connected to their common transformer by two switches in series. Between them, the unit transformers are connected to supply power to the power plant's own systems; each generator can therefore be connected to the unit transformer to power the plant, or to the unit transformer and the generator transformer to also feed power to the grid.[13]
The 330 kV line was normally not used, and served as an external power supply, connected to a station's transformer – meaning to the power plant's electrical systems. The plant was powered by its own generators, or at any event got power from the 750 kV national grid through the main grid backup feed in the transformer, or from the 330 kV level feed in grid transformer 2, or from the other power plant blocks via two reserve busbars. In case of total external power loss, the essential systems could be powered by diesel generators. Each unit's transformer is therefore connected to two 6 kV main power line switchboards, A and B (e.g., 7A, 7B, 8A, 8B for generators 7 and 8), powering principal essential systems and connected to even another transformer at 4 kV, which is backed up twice (4 kV reserve busbar).[13]
The 7A, 7B, and 8B boards are also connected to the three essential power lines (for the coolant pumps), each also having its own diesel generator. In case of a coolant circuit failure with simultaneous loss of external power, the essential power can be supplied by spinning down turbogenerators for about 45 to 50 seconds, during which time the diesel generators should start. The generators were started automatically within 15 seconds at loss of off-site power.[13]
Turbo generators
Electrical energy was generated by a pair of 2x500 MW hydrogen-cooled turbo generators per unit. These are located in the Script error: No such module "convert".-long machine hall, adjacent to the reactor building. The turbines—the venerable five-cylinder K-500-65/3000 steam turbine were supplied by the Kharkiv turbine plant; the electrical generators are the TBB-500. The turbine and the generator rotors are mounted on the same shaft; the combined weight of the rotors is almost Script error: No such module "convert". and their speed was 3,000 revolutions per minute.[14]Script error: No such module "Unsubst".
The turbo generator is Script error: No such module "convert". long and its total weight is Script error: No such module "convert".. The coolant flow for each turbine is 82,880 t/h. The generator produced 20 kV 50 Hz AC power. The generator's stator was cooled by water while its rotor was cooled by hydrogen. The hydrogen for the generators was manufactured on-site by electrolysis.[14] The design and reliability of the turbines earned them the State Prize of Ukraine for 1979.
The Kharkiv turbine plant later developed a new version of the turbine, K-500-65/3000-2, in an attempt to reduce use of valuable metal. The Chernobyl plant was equipped with both types of turbines; block 4 had the newer ones. The newer turbines, however, turned out to be more sensitive to their operating parameters, and their bearings had frequent problems with vibrations.[15]
Reactor fleet
The construction of two partially completed reactors, No. 5 and 6, were suspended immediately after the accident at reactor No. 4, and eventually cancelled in 1989.[16] Reactors No. 1 and 3 continued to operate after the disaster. Reactor No. 2 was permanently shut down in 1991 after a fire broke out due to a faulty switch in a turbine. Reactors No. 1 and 3 were to be eventually closed due to a 1995 agreement Ukraine made with the European Union.
Ukraine agreed to close the remaining units in exchange for EU assistance in modernizing the shelter over reactor No. 4 and improving the energy sector of the country, including the completion of two new nuclear reactors, Khmelnytskyi 2 and Rivne 4. Reactor No. 1 was shut down in 1996 with No. 3 following in 2000.[17]
Computer systems
SKALA (Russian: СКАЛА, система контроля аппарата Ленинградской Атомной; sistema kontrolya apparata Leningradskoj Atomnoj, "Control system of the device of the Leningrad Nuclear [Power Plant]", lit. "rock"[18]) was the process computer for the RBMK nuclear reactor at the Chernobyl nuclear power plant prior to October 1995.[19] Dating to the 1960s, it used magnetic-core memory, magnetic tape data storage, and punched tape for loading software.
SKALA monitored and recorded reactor conditions and control board inputs. It was wired to accept 7200 analog signals and 6500 digital signals.[20] The system continuously monitored the plant and displayed this information to operators. Additionally, a program called PRIZMA (Russian: ПРИЗМА, программа измерения мощности аппарата; programma izmereniya moshchnosti apparata, "Device power measurement program", lit. "prism"[18]) processed plant conditions and made recommendations to guide plant operators. This program took 5 to 10 minutes to run, and could not directly control the reactor.[21]
Known accidents and incidents
1982 reactor #1 partial meltdown
On 9 September 1982, a partial core meltdown occurred in reactor No. 1 due to a faulty cooling valve remaining closed following maintenance. Once the reactor came online, the uranium in the channel 13-44 overheated and ruptured. The extent of the damage was comparatively minor, and no one was killed during the accident. However, due to the negligence of the operators, the accident was not noticed until several hours later, resulting in significant release of radiation in the form of fragments of uranium oxide and several other radioactive isotopes escaping with steam from the reactor via the ventilation stack. This accident was somewhat similar to the 1975 Leningrad unit 1 accident. The accident was not made public until several years later, despite cleanups taking place in and around the power station and Pripyat. The reactor was repaired and put back into operation after eight months with its capacity reduced by 20% to 800MWe.[22]
1984 reactor #3 and #4 incident
According to KGB documents declassified in Ukraine on 26 April 2021,[23] serious incidents occurred in the third and fourth reactors in 1984. According to these documents, the central government in Moscow knew as early as 1983 that the powerplant was "one of the most dangerous nuclear powerplants in the USSR". The reasoning behind this had to do with the building's structural integrity. The room which housed the steam separators would reach temperatures as high as 270 degrees Celsius. This excess heat caused the concrete of the building to shift its position, which made the building unsafe and could potentially result in the collapse of the steam separators, which would cause it to collapse onto the reactor hall, causing a meltdown.
1986 reactor #4 catastrophe (Chernobyl disaster)
Template:Main article On 26 April 1986, reactor No. 4 suffered a catastrophic meltdown during a safety test resulting in a core explosion and open-air fires. This caused large quantities of radioactive materials to be dispersed in the atmosphere and surrounding land. The disaster is regarded as the worst accident in the history of nuclear power.[24]
The destroyed reactor was encased in a concrete and lead sarcophagus, followed more recently by a large steel confinement shelter to prevent further escape of radioactivity. The radioactive cloud spread as far away as Norway.[25]
1991 reactor #2 turbine fire
Reactor No. 2 was permanently shut down shortly after October 1991 when a fire broke out due to a faulty switch in a turbine.[26]
On 11 October 1991, a fire broke out in the turbine hall of reactor No. 2.[27] The fire began in reactor No. 2's fourth turbine, while the turbine was being idled for repairs. A faulty switch caused a surge of current to the generator, igniting insulating material on some electrical wiring.[28] This subsequently led to hydrogen, used as a coolant in the synchronous generator, being leaked into the turbine hall "which apparently created the conditions for fire to start in the roof and for one of the trusses supporting the roof to collapse."[29] The adjacent reactor hall and reactor were unaffected, but due to the political climate it was decided to shut down this reactor permanently after this incident.
2017 cyberattack
The 2017 Petya cyberattack affected the radiation monitoring system and took down the power plant's official website, which hosts information about the incident and the area.[30]
Russian invasion of Ukraine
Script error: No such module "Labelled list hatnote".
The Chernobyl Exclusion Zone was the site of fighting between Russian and Ukrainian forces during the Battle of Chernobyl as part of the Russian invasion of Ukraine. On 24 February 2022, Russian forces captured the plant.[4][31] The resulting activity reportedly led to a 20-fold increase of detected radiation levels in the area due to disturbance of contaminated soil.[32]
On 9 March 2022, there was a power cut at the plant itself. No radiation leaks were reported at the time. However, Ukrainian authorities reported that there was a risk of a radiation leak due to spent fuel coolant being unable to circulate properly.[33]
On 31 March 2022, Russian forces formally handed control of the plant back to its employees, and most occupying forces withdrew. Ukrainian National Guard personnel were moved to Belarus as prisoners of war.[34][5] On 2 April 2022, Ukrainian media reported that the flag of Ukraine was raised at the plant.[35]
Russian troops dug trenches and other fighting positions on the outskirts of the highly contaminated Red Forest, which attracted considerable media attention due to unconfirmed reports that soldiers were being treated for radiation sickness in Belarus.[3] The IAEA later clarified that only modest radiation doses (6.5 mSv/year) could have resulted from such activities, and a tour guide in the Zone later acknowledged to the Washington Post that he had helped start these rumors in a "huge exaggeration."
On 14 February 2025, Ukrainian president Volodymyr Zelenskyy said that a Russian drone attack significantly damaged the Chernobyl New Safe Confinement, which covers the sarcophagus and Unit No. 4.[36] The IAEA said that radiation levels at the site remained normal.[37]
Decommissioning
After the explosion at reactor No. 4 and construction of the sarcophagus, the remaining three reactors were de-contaminated and re-launched (reactor No. 1 on 1 October 1986, reactor No. 2 on 5 November 1986, and reactor No. 3 on 4 December 1987) and continued to operate until the post-Soviet period.[38] The Chernobyl New Safe Confinement is equipped with two overhead main cranes, which will be used to remove unstable parts of the original sarcophagus.[39][40] The majority of the external gamma radiation emissions at the site are from the isotope caesium-137, which has a half-life of 30.17 years. since 2016[update]Template:Dated maintenance category (articles)Script error: No such module "Check for unknown parameters"., the radiation exposure from that radionuclide has declined by half since the 1986 accident.
On 11 October 1991, reactor No. 2's turbine caught fire, and was subsequently shut down.[26] Ukraine's 1991 independence from the Soviet Union generated further discussion on the Chernobyl topic, because the Verkhovna Rada, Ukraine's new parliament, was composed largely of young reformers. Discussions about the future of nuclear energy in Ukraine ultimately moved the government toward a decision to decommission reactor No. 2.
On 30 November 1996, following pressure from foreign governments,Script error: No such module "Unsubst". reactor No. 1 was shut down.[41] Dismantling and removal of equipment began at reactor No. 1 in 2007.[42] The work is expected to be completed by 2028.[43]
On 15 December 2000, reactor No. 3 was shut down after operating briefly since March 1999 following almost three months of repairs,[44][45] and the plant as a whole ceased producing electricity.[41] In April 2015, units 1 through 3 entered the decommissioning phase.[46] Upon being shut down, the plant was re-classified as a 'State Special Enterprise', while 'V. I. Lenin' was removed from the name following Ukraine's independence.
In 2013, the pump lifting river water into the cooling reservoir adjacent to the facility was powered down, with the thermal sink expected to evaporate slowly.[47]
Originally announced in June 2003, a new steel containment structure named the New Safe Confinement was built to replace the aging and hastily built sarcophagus that protected ruined reactor No. 4.[48] Though the project's development had been delayed several times, construction officially began in September 2010.[49] The New Safe Confinement was financed by an international fund managed by the European Bank for Reconstruction and Development and was designed and built by the French-led consortium Novarka.[50]
In February 2013, a Script error: No such module "convert". portion of the roof and wall adjacent to the covered part of the turbine hall collapsed into the entombed area of the turbine hall. The collapse did not affect any other part of the Object Shelter (sarcophagus) or the New Safe Confinement. No variances in radiation levels as a result of the incident were detected.[51] The collapsed roof was built after the Chernobyl disaster and was later repaired.[52]
Novarka built a large arch-shaped structure out of steel Script error: No such module "convert". wide, Script error: No such module "convert". high, and Script error: No such module "convert". long to cover the old crumbling concrete dome that was in use at the time.[41] The structure was built in two segments which were joined in August 2015.[53] In November 2016, the completed arch was placed over the existing sarcophagus.[54] This steel casing project was expected to cost $1.4 billion, and was completed in 2017. The casing also meets the definition of a nuclear entombment device.[55]
Separately, an American firm Holtec International built a storage facility within the exclusion zone for nuclear waste produced by Chernobyl.[56][57][58] This facility, named the Interim Storage Facility 2, has dry storage for the 21,297 spent fuel assemblies formerly at the power plant, which are being loaded into approximately 231 waste canisters, and stored in the ISF-2 for 100 years.[59] In 2020, the storage facility was completed, and on November 18, 2020, the first canister of nuclear waste was loaded into the storage area.[60] By January 2022, 1,698 spent fuel assemblies had been moved in.[61]
See also
Notes
References
<templatestyles src="Reflist/styles.css" />
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ library.thinkquest.org Template:Webarchive – All four of the reactors at the Chernobyl nuclear power station were of the RBMK-type.
- ↑ Chornobyl Nuclear Station, Ukrainian News and Documentary Film Studio (Ukrtelefilm), 1974
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b c Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".Script error: No such module "Unsubst".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ State Committee for Using the Atomic Energy of USSR, THE ACCIDENT AT THE CHERNOBYL AES AND ITS CONSEQUENCES, Vienna, Austria, 25–29 August 1986.
- ↑ Howieson & Snell, Chernobyl – A Canadian Technical Perspective Template:Webarchive, January 1987 (PDF).
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "Citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Roof fire at Chernobyl intensifies Ukrainian calls to close nuclear plant Baltimore Sun (October 13, 1991).
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
Script error: No such module "citation/CS1".
Script error: No such module "citation/CS1".
Script error: No such module "citation/CS1". - ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b c Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".Script error: No such module "Unsubst".
- ↑ Script error: No such module "citation/CS1".
- ↑ Holtec International Press ReleaseScript error: No such module "Unsubst". (December 31, 2007).
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
Script error: No such module "Check for unknown parameters".
External links
Template:Chernobyl disaster Template:Nuclear power in Ukraine Template:Authority control
- Pages with script errors
- Top icon protection templates
- Pages with broken file links
- 1977 establishments in Ukraine
- Chernobyl disaster
- Chernobyl Exclusion Zone
- Nuclear power stations built in the Soviet Union
- Nuclear power stations using RBMK reactors
- Photovoltaic power stations in Ukraine
- Buildings and structures in Pripyat
- Energy infrastructure completed in 1977
- Former nuclear power stations in Ukraine
- Energy infrastructure closed in the 1980s