Tamar Bridge: Difference between revisions
imported>Samnviv Tolls increased 12 May 2025 |
imported>Samnviv Amended tolls in infobox |
||
| Line 19: | Line 19: | ||
| traffic = | | traffic = | ||
| design = [[Suspension bridge]] | | design = [[Suspension bridge]] | ||
| toll = Eastbound only: | | toll = Eastbound only: {{ubl|Free (motorcycles)|£3.00 (Cars and Vans)|£7.30 (over 3.5{{nbsp}}t, 2 axles)|£12.00 (over 3.5{{nbsp}}t, 3 axles)|£16.50 (over 3.5{{nbsp}}t, 4+ axles)}} | ||
| mainspan = {{convert|335|m}}{{sfn|Plymouth|Cornwall|2013|p=15}} | | mainspan = {{convert|335|m}}{{sfn|Plymouth|Cornwall|2013|p=15}} | ||
| length = | | length = | ||
| Line 56: | Line 56: | ||
The initial toll for cars was 3s (15p) for a single journey across the bridge, or 4/6 (22½p) for a return, while for lorries it was 14s (70p) and £1 respectively.<ref name="times" /> The Saltash Ferry closed, but the Torpoint Ferry remained in operation; management of the ferry and the bridge is shared so the two crossings are not in direct competition with each other.{{sfn|Brown|2007|p=2}} | The initial toll for cars was 3s (15p) for a single journey across the bridge, or 4/6 (22½p) for a return, while for lorries it was 14s (70p) and £1 respectively.<ref name="times" /> The Saltash Ferry closed, but the Torpoint Ferry remained in operation; management of the ferry and the bridge is shared so the two crossings are not in direct competition with each other.{{sfn|Brown|2007|p=2}} | ||
By 1979, the toll had risen to 30p for a single car journey.<ref>{{cite web |date=4 December 1979 |title=Toll Bridges and Tunnels |url=https://api.parliament.uk/historic-hansard/written-answers/1979/dec/04/toll-bridges-and-tunnels#S5CV0975P0_19791204_CWA_305 |access-date=12 August 2016 |work=[[Hansard|Parliamentary Debates (Hansard)]]}}</ref> It had risen again to £1 by 1995,<ref>{{cite web |date=19 December 1995 |title=Toll Bridges |url=https://api.parliament.uk/historic-hansard/written-answers/1995/dec/19/toll-bridges#S6CV0268P0_19951219_CWA_142 |access-date=12 August 2016 |work=[[Hansard|Parliamentary Debates (Hansard)]]}}</ref> which remained in place until 2010, when they were increased to £1.50.<ref>{{cite news |date=15 March 2010 |title=Tamar Bridge toll goes up to £1.50 |work=BBC News |url= | By 1979, the toll had risen to 30p for a single car journey.<ref>{{cite web |date=4 December 1979 |title=Toll Bridges and Tunnels |url=https://api.parliament.uk/historic-hansard/written-answers/1979/dec/04/toll-bridges-and-tunnels#S5CV0975P0_19791204_CWA_305 |access-date=12 August 2016 |work=[[Hansard|Parliamentary Debates (Hansard)]]}}</ref> It had risen again to £1 by 1995,<ref>{{cite web |date=19 December 1995 |title=Toll Bridges |url=https://api.parliament.uk/historic-hansard/written-answers/1995/dec/19/toll-bridges#S6CV0268P0_19951219_CWA_142 |access-date=12 August 2016 |work=[[Hansard|Parliamentary Debates (Hansard)]]}}</ref> which remained in place until 2010, when they were increased to £1.50.<ref>{{cite news |date=15 March 2010 |title=Tamar Bridge toll goes up to £1.50 |work=BBC News |url=https://news.bbc.co.uk/2/hi/uk_news/england/8568964.stm |access-date=11 August 2016}}</ref> On 19 November 2019 the new standard toll was set at £2.00.<ref>{{cite news |last=McDonald |first=Gayle |date=19 November 2019 |title=Tamar Bridge and Torpoint Ferry tolls rise today |work=Plymouth Herald |url=https://www.plymouthherald.co.uk/news/tamar-bridge-torpoint-ferry-tolls-3552287 |access-date=19 November 2019}}</ref> | ||
The current tolls are £3.00 for cars, and £7.30, £12.00 and £16.50 for 2, 3 and 4-axle goods vehicles over 3.5 tonnes respectively. | The current tolls are £3.00 for cars, and £7.30, £12.00 and £16.50 for 2, 3 and 4-axle goods vehicles over 3.5 tonnes respectively. | ||
| Line 68: | Line 68: | ||
For centuries, road users wishing to go from Saltash to Plymouth had two main options. Travel by coach involved a long detour north either to Gunnislake New Bridge (a one-lane bridge constructed in 1520), or other bridges further north along the Devon – Cornwall border.{{sfn|Otter|1994|p=32}} The alternative was to catch a ferry across the Tamar. The Torpoint Ferry had been running successfully since 1791 (and is still in active service){{sfn|Otter|1994|p=33}}<ref>{{cite web|url=http://www.tamarcrossings.org.uk/index.aspx?articleid=49617|title=Torpoint Ferry|publisher=Tamar Crossings|access-date=12 August 2016}}</ref> while the [[Saltash Ferry]] ran near to the bridge's present location.<ref>{{cite book|title=The River Tamar Through Time|first=Derek|last=Tait|publisher=Amberley Publishing|page=42|year=2014|isbn=978-1-445-62593-5}}</ref> While popular, the ferries did not have sufficient capacity by the 20th century to cater for motor traffic.<ref>{{cite web|url=https://api.parliament.uk/historic-hansard/commons/1954/oct/27/river-tamar-crossing-report#S5CV0531P0_19541027_HOC_223|title=River Tamar Crossing (report)|work=[[Hansard|Parliamentary Debates (Hansard)]]|date=27 October 1954|access-date=11 August 2016}}</ref> The idea for a fixed crossing across the Tamar had been floated around since the early 19th century,{{sfn|Brown|2007|p=3}} and proposals had been discussed in Parliament as early as 1930.<ref>{{cite web|url=https://api.parliament.uk/historic-hansard/commons/1930/apr/29/river-tamar-bridge|title=River Tamar Bridge|work=[[Hansard|Parliamentary Debates (Hansard)]]|date=29 April 1930|access-date=11 August 2016}}</ref> | For centuries, road users wishing to go from Saltash to Plymouth had two main options. Travel by coach involved a long detour north either to Gunnislake New Bridge (a one-lane bridge constructed in 1520), or other bridges further north along the Devon – Cornwall border.{{sfn|Otter|1994|p=32}} The alternative was to catch a ferry across the Tamar. The Torpoint Ferry had been running successfully since 1791 (and is still in active service){{sfn|Otter|1994|p=33}}<ref>{{cite web|url=http://www.tamarcrossings.org.uk/index.aspx?articleid=49617|title=Torpoint Ferry|publisher=Tamar Crossings|access-date=12 August 2016}}</ref> while the [[Saltash Ferry]] ran near to the bridge's present location.<ref>{{cite book|title=The River Tamar Through Time|first=Derek|last=Tait|publisher=Amberley Publishing|page=42|year=2014|isbn=978-1-445-62593-5}}</ref> While popular, the ferries did not have sufficient capacity by the 20th century to cater for motor traffic.<ref>{{cite web|url=https://api.parliament.uk/historic-hansard/commons/1954/oct/27/river-tamar-crossing-report#S5CV0531P0_19541027_HOC_223|title=River Tamar Crossing (report)|work=[[Hansard|Parliamentary Debates (Hansard)]]|date=27 October 1954|access-date=11 August 2016}}</ref> The idea for a fixed crossing across the Tamar had been floated around since the early 19th century,{{sfn|Brown|2007|p=3}} and proposals had been discussed in Parliament as early as 1930.<ref>{{cite web|url=https://api.parliament.uk/historic-hansard/commons/1930/apr/29/river-tamar-bridge|title=River Tamar Bridge|work=[[Hansard|Parliamentary Debates (Hansard)]]|date=29 April 1930|access-date=11 August 2016}}</ref> | ||
===1950–1962: Construction | ===1950–1962: Construction=== | ||
{{Infobox UK legislation | {{Infobox UK legislation | ||
| short_title = Tamar Bridge Act 1957 | | short_title = Tamar Bridge Act 1957 | ||
| Line 98: | Line 98: | ||
| collapsed = yes | | collapsed = yes | ||
}} | }} | ||
[[File:Tamar Bridge plaques - geograph.org.uk - 1209285.jpg|thumb|200px|left|A set of plaques commemorating the original opening of the Tamar Bridge, and its reconstruction 40 years later]] | [[File:Tamar Bridge plaques - geograph.org.uk - 1209285.jpg|thumb|200px|left|A set of plaques commemorating the original opening of the Tamar Bridge, and its reconstruction 40 years later]] | ||
In 1950, [[Cornwall County Council]] and [[Plymouth City Council]] discussed the feasibility of building a road bridge. The government was unenthusiastic about the idea, as they did not believe it was financially viable and there were more urgent projects in post-war Britain. After being rebuked, both councils agreed to self-fund the entire project, which would be paid for in tolls.{{sfn|Brown|2007|p=3}} The | |||
In 1950, [[Cornwall County Council]] and [[Plymouth City Council]] discussed the feasibility of building a road bridge. The government was unenthusiastic about the idea, as they did not believe it was financially viable and there were more urgent projects in post-war Britain. After being rebuked, both councils agreed to self-fund the entire project, which would be paid for in tolls.{{sfn|Brown|2007|p=3}} The '''{{visible anchor|Tamar Bridge Act 1957}}''' ([[5 & 6 Eliz. 2]]. c. xxviii) received [[royal assent]] in July 1957.<ref>{{cite web |date=31 July 1957 |title=Royal Assent |url=https://api.parliament.uk/historic-hansard/commons/1957/jul/31/royal-assent#S5CV0574P0_19570731_HOC_305 |access-date=11 August 2016 |work=[[Hansard|Parliamentary Debates (Hansard)]]}}</ref> Invitations to tender were sent on 4 March 1959, and a proposal from the northeast England-based [[Cleveland Bridge & Engineering Company]] was accepted on 9 June.{{sfn|Brown|2007|p=3}} | |||
Preparatory work on the bridge started in July 1959. The bridge was built using suspended construction, which involved building two {{convert|67|m|ft}} concrete towers with support cables over these. Hangers were attached to these cables and the road deck was transported by barge and lifted into place.{{sfn|Brown|2007|pp=3,4}} Cleveland Bridge and Engineering later used the same technique to construct the first [[Severn Bridge]].{{sfn|Brown|2007|p=4}} | Preparatory work on the bridge started in July 1959. The bridge was built using suspended construction, which involved building two {{convert|67|m|ft}} concrete towers with support cables over these. Hangers were attached to these cables and the road deck was transported by barge and lifted into place.{{sfn|Brown|2007|pp=3,4}} Cleveland Bridge and Engineering later used the same technique to construct the first [[Severn Bridge]].{{sfn|Brown|2007|p=4}} | ||
| Line 110: | Line 111: | ||
=== 1991–2001: Widening and strengthening === | === 1991–2001: Widening and strengthening === | ||
{{Infobox UK legislation | |||
| short_title = {{visible anchor|Tamar Bridge Act 1979}} | |||
| type = Act | |||
| parliament = Parliament of the United Kingdom | |||
| long_title = An Act to amend the Tamar Bridge Act 1957, to repeal certain provisions of that Act and of the County of Cornwall Act 1929 and to provide that the other provisions of the Tamar Bridge Act 1957 shall continue to have effect notwithstanding section 262(9) of the Local Government Act 1972; and for other purposes. | |||
| year = 1979 | |||
| citation = [[List of acts of the Parliament of the United Kingdom from 1979|1979]] c. iv | |||
| introduced_commons = | |||
| introduced_lords = | |||
| territorial_extent = | |||
| royal_assent = 22 February 1979 | |||
| commencement = | |||
| expiry_date = | |||
| repeal_date = | |||
| amends = | |||
| replaces = | |||
| amendments = | |||
| repealing_legislation = | |||
| related_legislation = | |||
| status = | |||
| legislation_history = | |||
| theyworkforyou = | |||
| millbankhansard = | |||
| original_text = https://www.legislation.gov.uk/ukla/1979/4/pdfs/ukla_19790004_en.pdf | |||
| revised_text = | |||
| use_new_UK-LEG = | |||
| UK-LEG_title = | |||
| collapsed = yes | |||
}} | |||
[[Image:Tamar Bridge Cornwall Devon.jpg|thumb|right|300px|The Tamar Bridge during widening and strengthening work, 1999]] | [[Image:Tamar Bridge Cornwall Devon.jpg|thumb|right|300px|The Tamar Bridge during widening and strengthening work, 1999]] | ||
A 1995 inspection found that the bridge was unable to comply with a [[European Union]] directive for supporting vehicles up to 40 tons;<ref>{{cite web|url=https://api.parliament.uk/historic-hansard/lords/1998/jun/11/tamar-bridge-bill#S5LV0590P0_19980611_HOL_287|title=Tamar Bridge Bill|work=[[Hansard|Parliamentary Debates (Hansard)]]|date=11 June 1998|access-date=11 August 2016}}</ref> although the original bridge was designed for 38-ton vehicles, it was only able to support 17-ton vehicles.{{sfn|Brown|2007|p=8}} A feasibility study was carried out for a new Tamar Crossing in 1991,<ref>{{cite web|url=https://api.parliament.uk/historic-hansard/written-answers/1994/feb/02/projects-and-contracts#S6CV0236P0_19940202_CWA_406|title=Projects and Contracts|date=2 February 1994|work=[[Hansard|Parliamentary Debates (Hansard)]]|access-date=11 August 2016}}</ref> but was rejected as the estimated cost would be around £300 million.{{sfn|Brown|2007|p=8}} The existing bridge could not be closed as it was being used by over 40,000 vehicles a day.{{sfn|Brown|2007|p=9}} | A 1995 inspection found that the bridge was unable to comply with a [[European Union]] directive for supporting vehicles up to 40 tons;<ref>{{cite web|url=https://api.parliament.uk/historic-hansard/lords/1998/jun/11/tamar-bridge-bill#S5LV0590P0_19980611_HOL_287|title=Tamar Bridge Bill|work=[[Hansard|Parliamentary Debates (Hansard)]]|date=11 June 1998|access-date=11 August 2016}}</ref> although the original bridge was designed for 38-ton vehicles, it was only able to support 17-ton vehicles.{{sfn|Brown|2007|p=8}} A feasibility study was carried out for a new Tamar Crossing in 1991,<ref>{{cite web|url=https://api.parliament.uk/historic-hansard/written-answers/1994/feb/02/projects-and-contracts#S6CV0236P0_19940202_CWA_406|title=Projects and Contracts|date=2 February 1994|work=[[Hansard|Parliamentary Debates (Hansard)]]|access-date=11 August 2016}}</ref> but was rejected as the estimated cost would be around £300 million.{{sfn|Brown|2007|p=8}} The existing bridge could not be closed as it was being used by over 40,000 vehicles a day.{{sfn|Brown|2007|p=9}} | ||
The eventual solution was to add two additional [[orthotropic deck|orthotropic]] cantilever lanes either side of the bridge, which traffic could run on while the original road deck was replaced. The work was designed by [[Hyder Consulting]] and constructed by the descendent company of Cleveland Bridge that had worked on the original project. Reconstruction started in 1999, and was slightly delayed owing to an influx of tourists travelling to Cornwall to watch the [[solar eclipse of 11 August 1999]], whose line of totality passed through the county.{{sfn|Brown|2007|p=9}} The new deck contained 82 orthotropic panels, each one measuring {{convert|6|m|ft}} by {{convert|15|m|ft}} and weighing 20 tons.{{sfn|Brown|2007|p=3}} Work was completed in December 2001 at a total cost of £34 million; the two additional lanes were retained to increase the bridge's capacity.{{sfn|Brown|2007|p=9}} The completed construction weighed 25 tons less than the original bridge.{{sfn|Brown|2007|p=6}} | {{Infobox UK legislation | ||
| short_title = Tamar Bridge Act 1998 | |||
| type = Act | |||
| parliament = Parliament of the United Kingdom | |||
| long_title = An Act to empower the Cornwall County Council and the Plymouth City Council ("the Authorities") to strengthen, widen and improve the bridge across the river Tamar authorised by the Tamar Bridge Act 1957 and to acquire land; to confer further powers on the Authorities; to make further provision with respect to the undertaking of the Authorities established under that Act and to amend that Act; and for other purposes. | |||
| year = 1998 | |||
| citation = [[List of acts of the Parliament of the United Kingdom from 1998|1998]] c. iv | |||
| introduced_commons = | |||
| introduced_lords = | |||
| territorial_extent = | |||
| royal_assent = 28 July 1998 | |||
| commencement = | |||
| expiry_date = | |||
| repeal_date = | |||
| amends = | |||
| replaces = | |||
| amendments = | |||
| repealing_legislation = | |||
| related_legislation = | |||
| status = | |||
| legislation_history = | |||
| theyworkforyou = | |||
| millbankhansard = | |||
| original_text = https://www.legislation.gov.uk/ukla/1998/4/contents/enacted | |||
| revised_text = | |||
| use_new_UK-LEG = | |||
| UK-LEG_title = | |||
| collapsed = yes | |||
}} | |||
The eventual solution was to add two additional [[orthotropic deck|orthotropic]] cantilever lanes either side of the bridge, which traffic could run on while the original road deck was replaced. This was authorised by the '''{{visible anchor|Tamar Bridge Act 1998}}''' (c. iv). The work was designed by [[Hyder Consulting]] and constructed by the descendent company of Cleveland Bridge that had worked on the original project. Reconstruction started in 1999, and was slightly delayed owing to an influx of tourists travelling to Cornwall to watch the [[solar eclipse of 11 August 1999]], whose line of totality passed through the county.{{sfn|Brown|2007|p=9}} The new deck contained 82 orthotropic panels, each one measuring {{convert|6|m|ft}} by {{convert|15|m|ft}} and weighing 20 tons.{{sfn|Brown|2007|p=3}} Work was completed in December 2001 at a total cost of £34 million; the two additional lanes were retained to increase the bridge's capacity.{{sfn|Brown|2007|p=9}} The completed construction weighed 25 tons less than the original bridge.{{sfn|Brown|2007|p=6}} | |||
The Tamar Bridge was officially reopened by [[Anne, Princess Royal|Princess Anne]] on 26 April 2002, exactly forty years after the initial opening.<ref>{{cite news|url=http://find.galegroup.com/ttda/infomark.do?&source=gale&prodId=TTDA&userGroupName=wes_ttda&tabID=T003&docPage=article&searchType=BasicSearchForm&docId=IF502443665&type=multipage&contentSet=LTO&version=1.0|title=Today's royal engagements|work=The Times|date=26 April 2002|access-date=11 August 2016|url-access=subscription }}</ref> Traffic was not expected to increase following the expansion of the bridge, as the [[Saltash Tunnel]] further west acts as a buffer for capacity.{{sfn|Brown|2007|p=9}} It was the world's first [[suspension bridge]] to be widened using [[cantilever]]s, and the world's first suspension bridge to be widened and strengthened while remaining open to traffic. The project won the British Construction Industry [[Civil Engineering]] Award for 2002, the Historic Structures category (30 years or older) of the Institution of Civil Engineers Awards 2002, and was one of eight | The Tamar Bridge was officially reopened by [[Anne, Princess Royal|Princess Anne]] on 26 April 2002, exactly forty years after the initial opening.<ref>{{cite news|url=http://find.galegroup.com/ttda/infomark.do?&source=gale&prodId=TTDA&userGroupName=wes_ttda&tabID=T003&docPage=article&searchType=BasicSearchForm&docId=IF502443665&type=multipage&contentSet=LTO&version=1.0|title=Today's royal engagements|work=The Times|date=26 April 2002|access-date=11 August 2016|url-access=subscription }}</ref> Traffic was not expected to increase following the expansion of the bridge, as the [[Saltash Tunnel]] further west acts as a buffer for capacity.{{sfn|Brown|2007|p=9}} It was the world's first [[suspension bridge]] to be widened using [[cantilever]]s, and the world's first suspension bridge to be widened and strengthened while remaining open to traffic. The project won the British Construction Industry [[Civil Engineering]] Award for 2002, the Historic Structures category (30 years or older) of the Institution of Civil Engineers Awards 2002, and was one of eight | ||
finalists for the [[Prime Minister of the United Kingdom|Prime Minister]]'s Better Public Building Award 2002.{{sfn|Brown|2007|p=10}} | finalists for the [[Prime Minister of the United Kingdom|Prime Minister]]'s Better Public Building Award 2002.{{sfn|Brown|2007|p=10}} | ||
Bill Moreau, chief engineer of the [[New York State Bridge Authority]], was impressed by the project. He visited the bridge shortly after its reconstruction, and hoped that such methods could be possibly used to expand capacity on the three lane [[Mid-Hudson Bridge]] across the Hudson River in upstate New York<ref>{{cite news|url= | Bill Moreau, chief engineer of the [[New York State Bridge Authority]], was impressed by the project. He visited the bridge shortly after its reconstruction, and hoped that such methods could be possibly used to expand capacity on the three lane [[Mid-Hudson Bridge]] across the Hudson River in upstate New York<ref>{{cite news|url=https://news.bbc.co.uk/2/hi/uk_news/england/1742142.stm|title=New York inspired by Tamar Bridge|work=BBC News|date=4 January 2002|access-date=12 August 2016}}</ref> | ||
=== 2001–present === | === 2001–present === | ||
| Line 130: | Line 188: | ||
The Tamar Bridge is a recognisable symbol of the local area, as well as a main road connection between Cornwall and the rest of England, and is seen by supporters of Cornish devolution as being a bridge between two distinct nations.<ref>{{cite news|url=https://www.bbc.co.uk/news/uk-28766002|title=Scottish independence: Is Cornwall more like Scotland than England?|first=Vanessa|last=Barford|work=BBC News|date=18 August 2014|access-date=11 August 2016}}</ref> | The Tamar Bridge is a recognisable symbol of the local area, as well as a main road connection between Cornwall and the rest of England, and is seen by supporters of Cornish devolution as being a bridge between two distinct nations.<ref>{{cite news|url=https://www.bbc.co.uk/news/uk-28766002|title=Scottish independence: Is Cornwall more like Scotland than England?|first=Vanessa|last=Barford|work=BBC News|date=18 August 2014|access-date=11 August 2016}}</ref> | ||
In March 1998, after the closure of Europe's last [[tin mining|tin mine]] at [[South Crofty]] in Cornwall (which later reopened for a period, and subsequently closed), the Cornish Solidarity Action Group (CSAG) encouraged commuters to pay the then-£1 toll in pennies. The group thought this would slow down collection of tolls and cause widespread congestion across the local area. The CSAG believed Cornwall should receive similar subsidies to South Wales and Merseyside, which were receiving regeneration grants from the government.<ref>{{cite web|url= | In March 1998, after the closure of Europe's last [[tin mining|tin mine]] at [[South Crofty]] in Cornwall (which later reopened for a period, and subsequently closed), the Cornish Solidarity Action Group (CSAG) encouraged commuters to pay the then-£1 toll in pennies. The group thought this would slow down collection of tolls and cause widespread congestion across the local area. The CSAG believed Cornwall should receive similar subsidies to South Wales and Merseyside, which were receiving regeneration grants from the government.<ref>{{cite web|url=https://news.bbc.co.uk/1/hi/uk/65538.stm|title=Cornwall demands economic help|work=BBC News|date=14 March 1998|access-date=11 August 2016}}</ref> | ||
== Incidents == | == Incidents == | ||
On 23 January 2004 four protesters climbed onto the gantry over the Tamar Bridge to highlight the work of the group [[Fathers 4 Justice]] who promote the rights of fathers in [[child custody]] disputes. The protest caused rush-hour tailbacks on both sides of the bridge.<ref>{{cite news|url= | On 23 January 2004 four protesters climbed onto the gantry over the Tamar Bridge to highlight the work of the group [[Fathers 4 Justice]] who promote the rights of fathers in [[child custody]] disputes. The protest caused rush-hour tailbacks on both sides of the bridge.<ref>{{cite news|url=https://news.bbc.co.uk/2/hi/uk_news/england/devon/3425597.stm|title=Man's bridge protest continues|work=BBC News|date=24 January 2004|access-date=11 August 2016}}</ref> Charges against the protesters were later dropped after it was felt there would not be a realistic chance of conviction.<ref>{{cite news|url=https://news.bbc.co.uk/1/hi/england/devon/4418319.stm|title=Tamar Bridge protester walks free|work=BBC News|date=6 April 2005|access-date=11 August 2016}}</ref> | ||
In 2012 local councillors complained when the Olympic organising committee declined to run the [[Olympic Torch]] across the Tamar Bridge in the lead-up to the [[2012 Summer Olympics|Olympics in London]]. One councillor said the handover should have been "one of the iconic moments of the whole torch relay in Cornwall". The official organisers said it was not practical to do so as it would involve closing the bridge.<ref>{{cite news|url=https://www.bbc.co.uk/news/uk-england-cornwall-18086340|title=London 2012: Cornwall Olympic torch Tamar Bridge dismay|work=BBC News|date=17 May 2012|access-date=12 August 2016}}</ref> | In 2012 local councillors complained when the Olympic organising committee declined to run the [[Olympic Torch]] across the Tamar Bridge in the lead-up to the [[2012 Summer Olympics|Olympics in London]]. One councillor said the handover should have been "one of the iconic moments of the whole torch relay in Cornwall". The official organisers said it was not practical to do so as it would involve closing the bridge.<ref>{{cite news|url=https://www.bbc.co.uk/news/uk-england-cornwall-18086340|title=London 2012: Cornwall Olympic torch Tamar Bridge dismay|work=BBC News|date=17 May 2012|access-date=12 August 2016}}</ref> | ||
| Line 157: | Line 215: | ||
*[https://web.archive.org/web/20030726235705/http://www.tamarbridge.org.uk/ Original Tamar Bridge website] | *[https://web.archive.org/web/20030726235705/http://www.tamarbridge.org.uk/ Original Tamar Bridge website] | ||
*[https://web.archive.org/web/20040113035249/http://www.torpointferry.org.uk/ Original Torpoint Ferry website] | *[https://web.archive.org/web/20040113035249/http://www.torpointferry.org.uk/ Original Torpoint Ferry website] | ||
*[ | *[https://news.bbc.co.uk/local/devon/hi/people_and_places/history/newsid_8475000/8475747.stm Archive film] showing the original construction | ||
* {{Structurae|id=20000931|title=Tamar Bridge}} | * {{Structurae|id=20000931|title=Tamar Bridge}} | ||
Latest revision as of 14:10, 3 October 2025
Template:Short description Template:Use British English Template:Use dmy dates Template:Main otherScript error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".Template:Main other
The Tamar Bridge is a suspension bridge over the River Tamar between Saltash, Cornwall and Plymouth, Devon in southwest England. It is Template:Convert long, running adjacent the Royal Albert Bridge, and part of the A38, a main road between the two counties.
During the 20th century, there was increasing demand to replace or supplement the Saltash and Torpoint ferries, which could not cope with the rise in motor traffic. The Government refused to prioritise the project, so it was financed by Plymouth City Council and Cornwall County Council. Construction was undertaken by the Cleveland Bridge & Engineering Company and began in 1959. It was unofficially opened in October 1961, with a formal presentation by Queen Elizabeth The Queen Mother in April 1962. A reconstruction of the bridge began in 1999 after it was found to be unable to support a European Union requirement for goods vehicle weights. The work involved building two new parallel decks while the original construction was completely rebuilt. The project was completed in late 2001 and formally opened by Princess Anne in April 2002. The extra decks have remained in use, increasing the bridge's capacity.
The bridge is tolled for eastbound travel, with a discount available via an electronic payment scheme. It has become a significant landmark in Plymouth, Saltash and the surrounding area, and used on several occasions for protests or to highlight the work of charities and fundraisers.
Location
The bridge runs over the River Tamar from near Wearde, Saltash in the west to Riverside, Plymouth in the east. It has a central span of Template:Convert and two side spans of Template:Convert.Template:Sfn It is part of the A38, a major cross-country road that runs across Cornwall and Devon, and lies immediately north of the Royal Albert Bridge, a significant railway bridge designed by Isambard Kingdom Brunel that opened in 1859. Both bridges are north of the Hamoaze, the estuary that the Tamar feeds into, and the Torpoint Ferry.Template:Sfn
Operations
In 1961, approximately 4000 vehicles used the Tamar Bridge each day.Template:Sfn This significantly increased in the following decades; in 1998 the hourly rate during the morning rush hour was 2500 vehicles. The average weekday saw 38,200 vehicles cross the bridge and the summer weekday flow was 42,900. Conversely, the Torpoint ferry link could transport a maximum of 300 vehicles per hour.[1]
The bridge is owned and maintained by the Tamar Bridge and Torpoint Ferry Joint Committee, a conglomerate between Plymouth City Council and Cornwall County Council.Template:Sfn It has a main span of three lanes, which use a tidal flow arrangement to maximise traffic flow at rush hour, and two outer lanes. The north of these is used as a local access route from Saltash, while the south is used by cyclists and pedestrians but could be converted to meet future vehicle demand if alternatives for pedestrians and bicycles were provided, a dedicated ferry, shuttle bus, cable car or bridge have been considered.Template:Sfn The bridge capacity is around 1,800 vehicles per hour per lane over each main and added decks:Template:Sfn
- 3,600 per hour for the combined two peak direction main deck lanes
- 1,800 per hour for the off peak direction main deck lane
- 1,800 per hour for the eastbound local link from Saltash over the northern cantilever lane
- southern cantilever lane used for pedestrians and cycles
The toll booth capacity in the eastbound direction only as operated in 2013 was 4,200 vehicles per hour and not considered to be constraining the route flow even though it's less than the potential eastbound 5,400 vehicles per hour from two main lanes and Saltash local.Script error: No such module "Unsubst".
Tolls
The initial toll for cars was 3s (15p) for a single journey across the bridge, or 4/6 (22½p) for a return, while for lorries it was 14s (70p) and £1 respectively.[2] The Saltash Ferry closed, but the Torpoint Ferry remained in operation; management of the ferry and the bridge is shared so the two crossings are not in direct competition with each other.Template:Sfn
By 1979, the toll had risen to 30p for a single car journey.[3] It had risen again to £1 by 1995,[4] which remained in place until 2010, when they were increased to £1.50.[5] On 19 November 2019 the new standard toll was set at £2.00.[6]
The current tolls are £3.00 for cars, and £7.30, £12.00 and £16.50 for 2, 3 and 4-axle goods vehicles over 3.5 tonnes respectively.
An electronic device called the Tamar Tag can be affixed to a vehicle window, which allows the driver to travel at half-fare. Tolls are only payable when travelling eastbound from Saltash to Plymouth.[7]
There is no charge for pedestrians, cyclists and motorcycles.[7] Disabled drivers can apply for concessions online or via an office next to the Torpoint Ferry.[8]
History
For centuries, road users wishing to go from Saltash to Plymouth had two main options. Travel by coach involved a long detour north either to Gunnislake New Bridge (a one-lane bridge constructed in 1520), or other bridges further north along the Devon – Cornwall border.Template:Sfn The alternative was to catch a ferry across the Tamar. The Torpoint Ferry had been running successfully since 1791 (and is still in active service)Template:Sfn[9] while the Saltash Ferry ran near to the bridge's present location.[10] While popular, the ferries did not have sufficient capacity by the 20th century to cater for motor traffic.[11] The idea for a fixed crossing across the Tamar had been floated around since the early 19th century,Template:Sfn and proposals had been discussed in Parliament as early as 1930.[12]
1950–1962: Construction
Template:Short descriptionScript error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".
In 1950, Cornwall County Council and Plymouth City Council discussed the feasibility of building a road bridge. The government was unenthusiastic about the idea, as they did not believe it was financially viable and there were more urgent projects in post-war Britain. After being rebuked, both councils agreed to self-fund the entire project, which would be paid for in tolls.Template:Sfn The Template:Visible anchor (5 & 6 Eliz. 2. c. xxviii) received royal assent in July 1957.[13] Invitations to tender were sent on 4 March 1959, and a proposal from the northeast England-based Cleveland Bridge & Engineering Company was accepted on 9 June.Template:Sfn
Preparatory work on the bridge started in July 1959. The bridge was built using suspended construction, which involved building two Template:Convert concrete towers with support cables over these. Hangers were attached to these cables and the road deck was transported by barge and lifted into place.Template:Sfn Cleveland Bridge and Engineering later used the same technique to construct the first Severn Bridge.Template:Sfn
The central span of the bridge was Template:Convert. The support cables were both Template:Convert long, with a combined weight of 850 tons. They were constructed for Cleveland Bridge and Engineering by British Ropes Ltd.[2] The deck was made out of a concrete base covered with Template:Convert steel plates approx and Template:Convert of standard road tarmac.Template:Sfn The roadway catered for three lanes of traffic and was designed to be Template:Convert wide, with an additional Template:Convert for pedestrians either side of the bridge.[2] It could support an estimated capacity of 20,000 vehicles a day,[2] with a maximum individual vehicle weight of 38 tons.Template:Sfn Bridge materials had a similar colour to the Royal Albert Bridge, which it runs parallel to.Template:Sfn
The bridge was unofficially opened at 6 am on 24 October 1961, when the construction barriers were removed.[2] It was formally opened by Queen Elizabeth The Queen Mother on 26 April 1962.[14]
The total cost of the bridge was £1.8 million (now £Template:Inflation million).[2] It was the first major suspension bridge to be constructed in the UK after World War II, and the longest suspension bridge in Britain.Template:Sfn
1991–2001: Widening and strengthening
Template:Short descriptionScript error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters".
A 1995 inspection found that the bridge was unable to comply with a European Union directive for supporting vehicles up to 40 tons;[15] although the original bridge was designed for 38-ton vehicles, it was only able to support 17-ton vehicles.Template:Sfn A feasibility study was carried out for a new Tamar Crossing in 1991,[16] but was rejected as the estimated cost would be around £300 million.Template:Sfn The existing bridge could not be closed as it was being used by over 40,000 vehicles a day.Template:Sfn
Template:Short descriptionScript error: No such module "Infobox".Template:Template otherScript error: No such module "Check for unknown parameters". The eventual solution was to add two additional orthotropic cantilever lanes either side of the bridge, which traffic could run on while the original road deck was replaced. This was authorised by the Template:Visible anchor (c. iv). The work was designed by Hyder Consulting and constructed by the descendent company of Cleveland Bridge that had worked on the original project. Reconstruction started in 1999, and was slightly delayed owing to an influx of tourists travelling to Cornwall to watch the solar eclipse of 11 August 1999, whose line of totality passed through the county.Template:Sfn The new deck contained 82 orthotropic panels, each one measuring Template:Convert by Template:Convert and weighing 20 tons.Template:Sfn Work was completed in December 2001 at a total cost of £34 million; the two additional lanes were retained to increase the bridge's capacity.Template:Sfn The completed construction weighed 25 tons less than the original bridge.Template:Sfn
The Tamar Bridge was officially reopened by Princess Anne on 26 April 2002, exactly forty years after the initial opening.[17] Traffic was not expected to increase following the expansion of the bridge, as the Saltash Tunnel further west acts as a buffer for capacity.Template:Sfn It was the world's first suspension bridge to be widened using cantilevers, and the world's first suspension bridge to be widened and strengthened while remaining open to traffic. The project won the British Construction Industry Civil Engineering Award for 2002, the Historic Structures category (30 years or older) of the Institution of Civil Engineers Awards 2002, and was one of eight finalists for the Prime Minister's Better Public Building Award 2002.Template:Sfn
Bill Moreau, chief engineer of the New York State Bridge Authority, was impressed by the project. He visited the bridge shortly after its reconstruction, and hoped that such methods could be possibly used to expand capacity on the three lane Mid-Hudson Bridge across the Hudson River in upstate New York[18]
2001–present
In April 2022, a campaign pressure group known as the Tamar Toll Action Group was formed. The group has undertaken a number of peaceful protests with the goal to end tolls on both Tamar Crossings.[19]
In 2023, the Tamar Bridge Committee announced a hike in prices due to its losses upwards of £2 million per year. The proposal received a large number of complaints.[20]
Legacy
The Tamar Bridge is a recognisable symbol of the local area, as well as a main road connection between Cornwall and the rest of England, and is seen by supporters of Cornish devolution as being a bridge between two distinct nations.[21]
In March 1998, after the closure of Europe's last tin mine at South Crofty in Cornwall (which later reopened for a period, and subsequently closed), the Cornish Solidarity Action Group (CSAG) encouraged commuters to pay the then-£1 toll in pennies. The group thought this would slow down collection of tolls and cause widespread congestion across the local area. The CSAG believed Cornwall should receive similar subsidies to South Wales and Merseyside, which were receiving regeneration grants from the government.[22]
Incidents
On 23 January 2004 four protesters climbed onto the gantry over the Tamar Bridge to highlight the work of the group Fathers 4 Justice who promote the rights of fathers in child custody disputes. The protest caused rush-hour tailbacks on both sides of the bridge.[23] Charges against the protesters were later dropped after it was felt there would not be a realistic chance of conviction.[24]
In 2012 local councillors complained when the Olympic organising committee declined to run the Olympic Torch across the Tamar Bridge in the lead-up to the Olympics in London. One councillor said the handover should have been "one of the iconic moments of the whole torch relay in Cornwall". The official organisers said it was not practical to do so as it would involve closing the bridge.[25]
References
Further reading
- Script error: No such module "citation/CS1".
- Template:Cite report
- Template:Cite report
UK legislation
External links
Script error: No such module "Portal". Template:Sister project
- Official Tamar Crossings website
- Tamar Toll Action Group Campaign website
- Original Tamar Bridge website
- Original Torpoint Ferry website
- Archive film showing the original construction
- Template:Structurae
Template:UK suspension bridges Template:Good article Template:Authority control
- ↑ Script error: No such module "citation/CS1".
- ↑ a b c d e f Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ a b Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".
- ↑ Script error: No such module "citation/CS1".