Lyon Metro Line B

From Wikipedia, the free encyclopedia
Revision as of 00:28, 9 February 2025 by imported>Conige
(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Template:Short description Template:Use dmy dates Template:Infobox rail line Template:Lyon transport Line B (Script error: No such module "Lang".) is a line on the Lyon Metro in France that runs between Charpennes–Charles Hernu and Saint-Genis-Laval–Hôpital Lyon Sud. It was constructed using the cut-and-cover method, and went into service on 2 May 1978.[1] Together with Line A, it was one of the inaugural lines of the Lyon Metro. It has since been extended three times: from Part-Dieu to Jean Macé in 1981, from Jean Macé to Stade de Gerland in 2000, from Stade de Gerland to Oullins railway station in 2013 and to Saint-Genis-Laval–Hôpital Lyon Sud in 2023.[1] The line serves 12 stations, and is Template:Convert long.[1] Line B trains run on tires rather than steel wheels; it is a rubber-tired metro line.

List of the stations

File:Metro Lyon MB-plan.svg

Chronology

  • 2 May 1978: Charpennes – Part-Dieu
  • 14 September 1981: Part-Dieu – Jean Macé
  • 4 September 2000: Jean Macé – Stade de Gerland
  • 11 December 2013: Stade de Gerland – Gare d'Oullins
  • 20 October 2023: Gare d'Oullins – Saint-Genis-Laval–Hôpital Lyon Sud

Extensions

Line B was extended a few kilometres southbound from Stade de Gerland to Oullins railway station. A tunnel had to be built under the Rhône River. This extension opened on 11 December 2013 at 2 pm (11/12/13, 14:00).

On 20 October 2023, Line B was extended from Gare d'Oullins to Saint-Genis-Laval–Hôpital Lyon Sud. This extension is 2.5 kilometres long and has two new stations: The first is "Oullins Centre" (city center of Oullins) and the second is "Saint-Genis-Laval–Hôpital Lyon Sud" (Lyon South Hospital in Saint-Genis-Laval).[2]

File:OULCTRSTATION.jpg
Oullins Centre station

Since June 2022, line B runs with a new driverless system, and new MPL 16 trains circulate on it. This new rolling stock has been ordered to Alstom in 2016. The current MPL 75 trains will join the others MPL 75 of line A to increase the capacity.

References

Template:Reflist

External links

Template:3rd arrondissement of Lyon Template:7th arrondissement of Lyon Template:Authority control

Template:Asbox Template:France-metro-stub

  1. a b c Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".